Council archive · source document
07/0012 - Lot Reconfiguration & MCU [As Published] · 132007.12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006 Operational works in atidal areaor | 9. The application involves operational work that is: ( tick the applicable box/es) coastal management aan kor more [1 (i) tidal work"® as defined under the Coastal Protection and Management Act 1995 (the information about prescribed tidal work in focal Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF Gers you snvered “none a reareee 1008, he C1 (il) tidal work that is prescribed tidal work"' other than in a canal"? -complete Part P of Form 1; OF application requires assessment by the ‘ CU iii) carried out within a coastal management district under the Coastal Act and for — complete Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked. Fe ee eee kon CPR ia cnoerance (1) (@) constructing or installing works in a watercourse between MHWS and HAT (ie. agency for the application in relation to this matter. other than those works in tidal water) where the development has been determined not Loc goverment be assessment manager for all to be assessable against the Water Act 2000 ; (1 (b) constructing a canal'2 intended to be connected to tidal waters; [1 (c) constructing an artificial waterway; £1 @) reclaiming land under tidal water; (J) disposing of dredge spoil or other solid waste material in tidal water, (7) (f) interfering with quarry material on State coastal land above high-water mark; (1g) draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; (1 (h)_ removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area and above high-water mark; (i) constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, above high-water mark; or @ BX] (iv) none of the above. Operational work below high water | 10. The application involves operational work that is: (tick the applicable box/es) mark information refer to Gude 18. For more (71 (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the information about prescribed tidal workin local Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; or government tidal areas refer to Guide 24, 1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF Unless you answered ‘none of the above" to Q10, . . a oo the application tiggers rtetal to Queensland CC (iii) carried out within a coastal management district's under the Coastal Act and for - Transport (OT) (Maritime Safety Qld) as a : . . ; tat in ti concurrence agency. ) (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part Local government is the assessment manager for all M of Form 1; prescribed tidal work. [1 (b) reclaiming tand under tidal water - complete Part M of Form 1; oF CJ (c) constructing a canal's, if the canal is associated with reconfiguring a lot - complete Part M of Form 1; (iv) none of the above. Coastal management 11. The application involves: (tick the applicable box/es) Far mare information refer to Guide 18, i) a material change of use assessable under a planning scheme involving operational Unless you answered ‘none of the above” to Q11 g 5 9 / : , ‘etrintt the appicaion requires assessment by he ; work carried out completely or partly in a coastal management district r) Environmental Protection Agency (EPA). Ci (ii) a material change of use assessable under a planning scheme involving building hone tea nicer Cae work, carried out completely or partly in a coastal management district that is — agency for the application in relation to this matter. « the construction of a new premises with a GFA’ of at least 1000m2 « the enlargement of the GFA of existing premises by more than 1000m? L1(ili) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated completely or partly in a coastal management district C1 (iv) reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with the construction of a canal'® - complete Part M of Form 1 EX] (v) none of the above 10 Tidal work is defined in sch 10 of the IPA. 11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or party within a local government tidal area, 12 Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA. 14 Prescribed tida! work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area. 15 Coastal management district is defined in sch 10 of the [PA and means a coastal management disivict under the Coastal Protection and Management Act 1995, other than an area dectared as a coastal management district under section 47(2) of that Act. 16 Canal means canal as defined under the Coastal Protection and Management Act 1995 17 GFAis defined in sch 14 of the IPA to mean the gross fioor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed. 18 Under s117 of the Coastal Protection and Managament Act 1995, an application for reconfiguration, where the reconfiguration is associated with tha construction of an artificial waterway, must be accompanied by the application for the operational works to construct the artificial waterway. Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0012 - Lot Reconfiguration & MCU [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.