07/0012 - Lot Reconfiguration & MCU [As Published] · 132007.12
URBAN STRATEGIES (SUNSHINE COAST) PTY LTD w
TOWN PLANNING ASSESSMENT REPORT
Specific Outcomes ee RM LC) ke eel Compliance
a) changes to natural drainage;
b) disturbance to any of the wetland
systems;
c} management of landslide and fire risk;
d) erosion and the transport of sediments
off-site;
e) unmanaged public access;
f) effluent disposal;
g) changes to fauna habitat and
behaviour, and
h) disturbance of buildings and features,
including natural features, of heritage
significance.
6.3.3 Community Uses Code
Table 14-13 — For All Community Uses
Specific Outcomes aks CR LoL} Proposal
ere ditched
14.30 Effects of use
Electricity supply infrastructure $1.7 No solution provided The proposal will not impact v
01 The development does not adversely existing or future electricity
impact on existing or future electricity supply infrastructure.
supply infrastructure; AND
O2 All uses and works maintain an $2.1 Development for uses N/A The site is not located NIA
adequate safe distance from electrical adjacent to or within 50m of an | within 50m of an existing
infrastructure including substations, existing electricity substation electricity substation or within
overhead powerlines, power poles and incorporates noise attenuation | close proximity of overhead
transformers. measures to mitigate noise electricity transmission lines or
impacts; electricity easements.
AND
$2.2 Buildings and structures | The stage 2 building and v
(including swimming pools, carparking structure are not
sheds, tennis courts and constructed under overhead
outbuildings) are not electricity transmission lines, or
constructed under overhead within electricity easements
electricity transmission lines,
or within electricity easements;
AND
$2.3 A minimum separation Adequate separation distances Vv
distance is maintained from are provided to electricity
the electricity transmission line | transmission lines.
to the closest boundary of
habitable buildings and child
activity areas, as follows—
a) 20m for transmission lines
up to 132kV;
b) 30m for transmission lines
between 133kV and 275kV;
and
¢) 40m for transmission lines
greater than 275kV.
Road network function No solution provided A traffic engineering report is “
O03 The use does not have an adverse
impact on the safety and efficiency of the
road network;
AND
04 The surrounding road system is
capable of accommodating additional
traffic generated by the proposal.
being prepared by TTM
Consulting and will be submitted
under separate cover. Initial
advice received from TTM
indicates that the proposed
additional medical and
education use areas will not
result in an adverse impact on
the safety or efficiency of the
road network, and the
surrounding road system is
capable of accommodating
potential additional traffic
generated by the proposal.
MATERIAL CHANGE OF USE & RECONFIGURING A LOT
88 & $0 GOODCHAP STREET, NOOSAVILLE
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0012 - Lot Reconfiguration & MCU [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.