NOOSA COUNCIL IDAS Development Application Decision Notice                                                    3 of 6




                                    Noosa Council Conditions
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


Land Use
1.    Development undertaken in accordance with this approval must generally comply with the approved plans
      of development. The approved plans are titled Site Plan, Floor Plan and Elevations prepared by Pennan
      Enterprises and dated May 2007 and as may be amended by these conditions and annotations on the
      plans.

2.    The development must be undertaken and operated in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
      emissions.

3.    All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
      (LPG or natural).

4.    Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
      constructed under overhead electricity transmission lines, or within any easements.

5.    The Development Permit for a material change of use lapses if the use has not happened by 10 August
      2011, unless an application to extend the currency is approved by Council.

Land Development
Contributions Towards Council Infrastructure
6.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
      various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
      amounts under the current Council policies and requirements is outlined in the table below:

        Contribution Required For:                                                             Amount:

        PSP20 – Pathway Trunk Network Contributions                                            $ 669

        TOTAL Contribution Amount =                                                            $ 669
        Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
        from June 2007 until the date of payment.
      All contributions must be paid prior to the commencement of the use.

Stormwater Drainage
7.    Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
      storage 5,000 litres per dwelling) that is installed to ensure water from the tank can be used for external
      uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
      outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All rainwater tanks are to
      be designed and installed in accordance with the Queensland Development Code (QDC), Part 25 –
      Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
      The location and capacity of the tank shall be clearly shown on the plans submitted for Building Works
      approval and any overflow shall be directed to the stormwater drainage system located at southeastern
      corner of the property.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8088843\@[email protected]

Used in these records

About this file

File size
29 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001252.001 [As Published].pdf · 29 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.