Council archive · source document
Acid Sulfate Soils Management Plan · OPW19/0205
Attached to the e-mail Operational works Applications - OPW19/0205 - 217 & 219 Gympie Terrace, Noosaville.
Attached to the e-mail Application for Operational works OPW19/0239 - bulk Earthworks 217 & 219 Gympie Terrace Noosavillle.
Plans and drawings: the text below has words only, no drawings.
Gympie Terrace Noosaville Pty Ltd
2) Nature of concern: Detail of issue, date of incident, people involved, and location.
3) Action taken or required: Any action proposed or undertaken to address the concern, including time and
date.
4) Response to action: Was the complainant satisfied with the outcome of the actions taken, if not, what
else needs to be done, or is it outside the scope of the development works.
5) Prevention or re-occurrence: What action has been taken by the nominated responsible person to
ensure the problem will not re-occur.
11.0 TRAINING
All site staff of Mosaic, and contractors, will be required to undergo a site induction covering all the elements
of the ASS MP. The induction will aim to instil environmental awareness by personnel including:
Introduce and explain the duty of care required under the Environmental Protection Act 1994.
Introduce the ASS MP and the responsibilities it places on all contractors and consultants.
Explain the various subordinate components of the ASS MP and the reporting and monitoring
procedures of the ASS MP and how they work.
Explain how to use the environmental procedures and plans in the ASS MP.
The content of the induction program will be endorsed and presented by the Site Supervisor, or delegate.
12.0 LIMITATIONS
Should you require any further information please contact the undersigned. We draw your attention to the
document, Limitations, which is included in Appendix C.
J000799-003-R-Rev0 Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ACID SULFATE SOILS MANAGEMENT PLAN.pdfRelated documentApplication case desk ↗
ACID SULFATE SOILS MANAGEMENT PLAN.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.