Acid Sulfate Soils Management Plan · OPW19/0205
Attached to the e-mail Operational works Applications - OPW19/0205 - 217 & 219 Gympie Terrace, Noosaville.
Attached to the e-mail Application for Operational works OPW19/0239 - bulk Earthworks 217 & 219 Gympie Terrace Noosavillle.
Plans and drawings: the text below has words only, no drawings.
PROCEDURE C
Monitoring of Water Quality
C6 (b) Groundwater Performance Indicators
Baseline Site Specific Criteria
Parameters* Units Performance
Range
Baseline - 0.3 pH unit change below
Yet to be the lower baseline range and an
pH pH
determined upper limit of 8.5
Aluminium Yet to be
mg/l +/- 10% of baseline range
(dissolved) determined
Aluminium Yet to be
mg/l +/- 10% of baseline range
(total) determined
Iron Yet to be
mg/l +/- 10% of baseline range
(dissolved) determined
Yet to be
Iron (total) mg/l +/- 10% of baseline range
determined
* Note that total acidity/alkalinity & chloride/sulfate ratio should also be monitored, but no performance limits are set
C7. CONTINGENCY MEASURES
All surface waters (any waters collected in excavations) and precipitates that cannot be contained and
treated for discharge off site, are to be removed and disposed of through trade waste or another lawful
method.
C8. MONITORING & REPORTING
The Site Supervisor shall be responsible for ensuring all on-site monitoring listed in section C5 is conducted
at the required frequency.
The Site Supervisor shall maintain a register of all on-site testing results and a record of inspections.
A summary report of all test results and inspections shall be compiled by the Site Supervisor each week and
submitted to the Project Manager.
The Site Supervisor shall inform the Project Manager of non-compliance upon detection. The Project
Manager shall inform Council of such non-compliances as soon as practicable and instigate an assessment
of the impact.
April 2019
J000799-003-R-Rev0 – Procedure C 3/3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ACID SULFATE SOILS MANAGEMENT PLAN.pdfRelated documentApplication case desk ↗
ACID SULFATE SOILS MANAGEMENT PLAN.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.