Acid Sulfate Soils Management Plan · OPW19/0205
Attached to the e-mail Operational works Applications - OPW19/0205 - 217 & 219 Gympie Terrace, Noosaville.
Attached to the e-mail Application for Operational works OPW19/0239 - bulk Earthworks 217 & 219 Gympie Terrace Noosavillle.
Plans and drawings: the text below has words only, no drawings.
Gympie Terrace Noosaville Pty Ltd 1.0 INTRODUCTION This Acid Sulfate Soil Management Plan (ASS MP) has been prepared by Core Consultants Pty Ltd (Core) in order to manage and minimise the ASS environmental impacts during construction of a proposed unit development at 217 to 219 Gympie Terrace, Noosaville (the site). This ASS MP references the results of a Geotechnical and ASS Investigation undertaken by Core (refer Core report J000799-002-R-Rev0, dated December 2018). The procedures contained within this ASS MP should be updated and revised to address conditions encountered that vary from those indicated by investigations or where alternative construction methodologies are adopted. The ASS MP was prepared with consideration of the following documents: Queensland Acid Sulfate Soil Technical Manual: Soil Management Guidelines V4.0, 2014. Dear, S-E., Ahern, C. R., O'Brien, L. E., Dobos, S. K., McElnea, A. E., Moore, N. G. & Watling, K. M. Department of Science, Information Technology, Innovation and the Arts, Queensland Government; Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils in Queensland, 1998; Ahern, CR., Ahern, M.R. and Powell; State Planning Policy, July 2014 (SPP14); State Planning Policy – state interest guideline, Water quality, August 2014; Environmental Protection Act 1994; Environmental Protection Policy (Water) 2009. A copy of the ASS MP and associated forms, registers and records shall be kept at the site office during the construction stage of the development. 2.0 OBJECTIVES The objective of the ASS MP is to mitigate or control potential impacts relating to the disturbance of ASS across the site. Disturbance includes the excavation of ASS and potential dewatering of ASS impacted groundwater. 3.0 PROPOSED DEVELOPMENT The proposed development is to comprise a three-storey apartment building with a single level basement carpark (excavation depth of approximately 2 m). A concept sketch of the proposed development is shown in Image 1. Image 1: Concept sketch of proposed development (Image from Chris Clout Design, Dwg No. C4.0). J000799-003-R-Rev0 Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ACID SULFATE SOILS MANAGEMENT PLAN.pdfRelated documentApplication case desk ↗
ACID SULFATE SOILS MANAGEMENT PLAN.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.