Council archive · source document
Acid Sulfate Soils Management Plan · OPW19/0205
Attached to the e-mail Operational works Applications - OPW19/0205 - 217 & 219 Gympie Terrace, Noosaville.
Attached to the e-mail Application for Operational works OPW19/0239 - bulk Earthworks 217 & 219 Gympie Terrace Noosavillle.
Plans and drawings: the text below has words only, no drawings.
Gympie Terrace Noosaville Pty Ltd
5.2 Groundwater
Groundwater inflow was encountered between approximately 1.2 m BGL and 1.5 m BGL during our
investigation. Table 2 summarises the groundwater conditions encountered on 14 November 2018.
Table 2: Summary of Groundwater Conditions
Borehole Location Groundwater Depth m BGL (~RL m AHD)
BH1 1.5 (0.27)
BH2 1.2 (0.55)
BH3 1.5 (0.20)
BH4 1.5 (0.17)
Groundwater measured in the standpipe in borehole BH1 was 2 m BGL (~RL -0.25 m) on 14 November
2018.
Given the site’s close proximity to the Noosa River, groundwater levels will likely vary with tidal influence and
prevailing weather conditions. Previous experience in the area indicates that the groundwater level can rise
close to the ground surface following periods of heavy or prolonged rainfall.
Provided that the retaining and dewatering system installed to support the basement excavation is able to
‘cut-off’ groundwater flows from the sands, seepage should be limited to flows emanating from sandy
materials in the base of the single level basement excavation. It should be possible to collect such seepage
by shallow gravel filled drains graded to a sump(s) from which the water could be removed from the
excavation to sewer or stormwater by submersible pumps (following treatment if necessary, depending on
the results of groundwater testing).
5.3 Potential Environmental Impacts
Potential environmental impacts associated with ASS disturbance during earthworks and construction for the
proposed development are summarised below in Table 3, along with the level of risk and management
strategies to mitigate the risk.
Table 3: Potential Environmental Impacts
Activity Issue Level of Risk to the Environment Mitigation Strategies
Acid formation and
transport due to Lime neutralisation treatment of
disturbance (by These works present a medium risk. excavated ASS and verification
excavation) of existing testing.
acidity and/or PASS.
Proposed
earthworks Release of acidic and/or
Regular water quality monitoring
and metals impacted waters
Medium to low level risk and treatment (if required) prior to
construction from within excavations to
discharge off-site.
surface waters.
Regular groundwater quality
Potential adverse impacts
monitoring and development of
to groundwater quality due Low level of risk
contingency measures (if
to earthworks activities.
required).
5.3.1 Summary of ASS Management Requirements
Provided the proposed ASS management procedures are effectively implemented and monitored throughout
the construction phase of the development, it is considered that there should be limited internal or external
ASS environmental impacts attributable to soils with existing or potential acidity.
The relevant issues, which are of significance when considering existing and potential acidity management
for the earthworks phase of this development, are:
J000799-003-R-Rev0 Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ACID SULFATE SOILS MANAGEMENT PLAN.pdfRelated documentApplication case desk ↗
ACID SULFATE SOILS MANAGEMENT PLAN.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.