Original source · versioned page text
Amended Landscape Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 4. MAINTENANCE MANAGEMENT ANNUAL MAINTENANCE REGIME - SCHEDULE
PLANT SCHEDULE 1 - General Min. idth
PRACTICAL COMPLETION TAS RE UEN ER ORMAN E IN I ATOR O E ENUS species ommon Name ty x ei ht Si e Staked
· The landscape contractor shall consolidate the landscape orks and make ood eekly: No em er e ruary Maintain turf to present consistent
all defects for practical completion. ortni htly: March April i orous appearance mo to TREES
· At practical completion the landscape contractor shall ad ise SU ER for an 'on' Mo in Monthly: May Au ust 30mm hi h A M hem A MENA hemilampra 2 7x9 45 L
maintenance inspection ith LA. Maintain turf neatly a ainst any
TIB als TIBOU INA Alston ille 1 7x9 45 L
eekly: No em er e ruary
· The annual maintenance re ime schedule descri es the maintenance tasks ortni htly: March April ed e around any ser ice or O if O ETIA ifurcata oxtail alm 2 3 x 10 45 L
fre uencies and key performance indicators that the maintenance contractor is to Trimmin Monthly: May Au ust respecti e co er TOTAL 5
follo .
Sprayin ick E ery 2 eeks Octo er March No eeds or rass taller than plant SHRUBS
· Maintenance period of t el e 12 months from the date of practical completion
ipin E ery 4 eeks April Septem er ithin 500mm of plants MET lit METROSI EROUS collina Little u ald 37 1.2 x 1.5 300mm
on maintenance of landscape orks to streetscape and parks.
I xan ILO EN RON xanadu 35 1.0 x 1.0 300mm
100mm minimum re uired depth or
S pin S IUM australe innacle 49 1.5 x 6 300mm
MONITORING mulch ade uate to suppress eed
Re mulchin Once durin M once per year ro th maintain soil moisture. TOTAL 121
· Re ularly inspect all landscape orks to monitor durin construction
esta lishment and maintenance. Inspect plantin at the start of GROUNDCOVERS
· Re ie periodically to ad ust in consultation ith SU ER to suit chan in Sprin assess dama ed dead To achie e minimum desi n A A pra A A ANT US praecox Blue Lilly 40 1.0 x 1.0 140mm
or unhealthy plants. Replant as plantin densities and arden
conditions. co er LIR us LIRIO E muscari ust Ri ht 38 0.3 x 0.3 140mm
Re plantin re uired.
· Any trees ith irdled or poor root ro th identified durin the maintenance period TRA as TRA ELOS ERMUM tricolour arie ated 36 2 x 0.3 140mm
ill e replaced at the contractors expense. E ery 2 or 3 days durin E TUL io TULBA IA iolacea Sil er Lace 48 0.5 x 0.5 140mm
eekly durin M or as re uired lants exhi it healthy ro th
· Report immediately any stolen or dead or dyin plants to SU ER and al ays TOTAL 162
aterin to maintain ade uate soil moisture. no si ns of drou ht stress
confirm direction on su stitution or replacement ith a similar si e and identical
species or ariety of the plant s ertilisin re uired
· Maintenace period of t el e 12 months from date of practical completion om here hen plants
are not respondin to Once durin M or as re uired lants appear healthy exhi it
maintenance of landscape orks to streetscape. ood rate of ro th.
slo release fertiliser PLANT SCHEDULE 4
applied at plantin
PLANT SCHEDULE 3
OFF MAINTENANCE Bio Retention Media Planting Bio Retention Batter Planting
· At the end of the maintenance period the landscape contractor shall arran e for an As re uired here plants re uire
support. Allo to stake 20 of BOTANICAL NAME POT SIZE SUGGESTED BIO BASIN BOTANICAL NAME POT SIZE SUGGESTED BIO BASIN
'off maintenance' inspection ith Superintendent. Only compliance of site lants ro in in an upri ht manner
trees durin E . Allo to stake SPACING Media 500mm SPACING Batter Planting
inspections and instructions y Superintendent achie es 'Off maintenance' further 20 of trees durin M (66m²) (107m²)
Stakin
BIO-RETENTION BASINS - MAINTENANCE & HANDOVER Inspection for storm ollo in storm e ent hea y
Any dama e noted and recitifed
dama e rainfall or hi h inds SHRUBS HIGH SHRUBS @ 30% OF AREA
· here temporary turf is installed remo e turf soil eofa ric. Turf o er media
BANKSIA robur 140mm 1/5m 2 4 ACMENA smithii 200mm 1/5m 2 6
surface ith 20mm soil on turf sla s rolls lants ha e desired natural form
runin to promote Monthly durin E e ery 3 CALLISTEMON sieberi 140mm 1/5m 2 4 CALLISTEMON captain cook 200mm 1/5m 2 6
· here plants ha e een installed re ularly remo e silt uildup y hand and healthy plant ro th months M eyond display healthy ro th
LEPTOSPERMUM petersonii 140mm 1/5m 2 4 LEPTOSPERMUM petersonii 200mm 1/5m 2 6
maintain mulch.
· At 24 months 80 uild out de silt any planted areas replace any plants and MELALEUCA claret Tops 140mm 1/5m 2 4 SYZYGIUM aussie southern 200mm 1/5m 2 6
remulch. E ro ide a report to SU ER Scheduled acti ities carried out. TOTAL 16 TOTAL 24
· Maintain Bio Retention asins until it reaches B 4.4.7 'Measures of successfully on esta lishment pro ress at Successful esta lishment.
Monitorin each pro ress payment claim. Scheduled maintenance acti ities MACROPHYTES & GROUNDCOVERS
esta lished plants'. Ve etation co er 90 surface 10 soil isi ility from a o e FICINIA nodosa Tubestock 8/m
2
132
M ro ide completed acti ities carried out. Successful LOW SHRUBS @ 60% OF AREA
any areas ithout co er are mulched minimum e etation hei ht of 500mm and list to SU ER after 3 months maintenance IMPERATA cylindrica Tubestock 4/m
2
66
e etation healthy and free from disease. 2
MELALEUCA thymifolia 140mm 1m 2 16
JUNCUS usitatus Tubestock 8/m 132 1m 2 16
2
HOVEA linearis 140mm
LOMANDRA hystrix Tubestock 1/m 16 1m 2 16
HARDENBERGIA violacea 140mm
TOTAL 346 LOMANDRA longifolia 140mm 1m 2 16
FINISHES SCHEDULE 64
Sacrificial CYNODON dactylon Turf to Media Areas. To be Planted Out at 80% Build Out TOTAL
CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR or After 2 Years.
Top Soil Soil preparation As Smooth uniform eed free GRASSES @ 10% OF AREA
Imported site topsoil: Refer to 2
Top soil per Specification per plan topsoil mulch surfaces ith no As supplied NOTES: All plant quantities are shown for reference only, contractor to verify all quantities IMPERATA cylindrica Tubestock 4/m 13
specifications
nominated areas. deleterious materials. if a discrepancy exists between plans and schedules, plans to take presedence. JUNCUS usitatus Tubestock 4/m
2
13
Plant shrubs from 140mm pots and Macrophytes & Groundcovers from Tubestock in drifts Tubestock 2
13
Uniform finish 100mm deep free of deleterious THEMEDA triandra 4/m
of 7-13.
B Or anic Mulch Street Tree arden pt and ardens 25mm composted materials. Install pinned coir mesh o er io retention As supplied TOTAL 39
omposted orest Litter asic mulch areas pro ect entry atter and
storm ater o erland flo path lo flo s ales.
PLANT SCHEDULE 5
Uniform finish free of deleterious materials eed
S Or anic Mulch Bio Retention Basin Media Area's As supplied seed i.e Nut sed e 100mm deep. Install pinned coir As supplied Drainage Easement Buffer
Su ar ane Mulch
mesh o er mulch.
BOTANICAL NAME POT SIZE SUGGESTED BIO BASIN
ynodon dactylon Top Soil as per eneral notes SPACING Batter Planting
Smooth flo in e en positi ely Bri ht reen
Turf ouch Bermuda rass 150mm deep (880m²)
A rade free of pests and eeds drainin rades
Turf Rolls Sod
oir MES pinned do n o er Mulch as HIGH SHRUBS @ 30% OF AREA
oir MES oir Mesh oir Net 400 sm As supplied
per manufactures specification ACMENA smithii 200mm 1/5m 2 44
CALLISTEMON captain cook 200mm 1/5m 2 44
GREVILLEA honey gem 200mm 1/5m 2 44
ra el Mulch Ri er ra el Mulch 100 50mm Smooth Natural
LEPTOSPERMUM petersonii 200mm 1/5m 2 44
MELALEUCA linariifolia 200mm 1/5m 2 44
hite decorati e ra el o er pinned SYZYGIUM aussie southern 200mm 1/5m 2 44
ecorati e ra el Mulch eofa ric 50mm Smooth hite
TOTAL 264
Spade Ed in er detail er etail er etail er etail LOW SHRUBS @ 60% OF AREA
MELALEUCA thymifolia 140mm 1m 2 132
HOVEA linearis 140mm 1m 2 132
Tim er Ed e er detail er etail er etail er etail HARDENBERGIA violacea 140mm 1m 2 132
LOMANDRA longifolia 140mm 1m 2 132
TOTAL 528
GRASSES @ 10% OF AREA
2
IMPERATA cylindrica Tubestock 4/m 117
2
JUNCUS usitatus Tubestock 4/m 117
2
THEMEDA triandra Tubestock 4/m 117
TOTAL 351
Client Project NORT TITLE: JOB No.: S22011135
anembo consultants
FILE: 220428
Maroolingar PL ATF 20 UT Lot 4 Taylor Court, Cooroy DWG. No. LD3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE OPERATIONAL WORKS B 28.04.22 COUNCIL RFI CK TH
PROJECT SPECS, SHEET 3 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 20.01.22 COUNCIL SUBMISSION CK TH PLANT SCHEDULE & NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 FINISHES SCHEDULE NTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.