Reference Document - RAL26/0011 (As Published)
Table M - Compliance assessment against Assessable Development Benchmarks – NP2020 Bushfire Overlay Code (Table 8.2.3.3)
Performance outcomes Acceptable outcomes Comments
Safety of people and property
PO1 AO1.1 AO1.1-1.2 - Complies
Development maintains the safety of people and property from the Development which will materially increase the number of people living or This report has assessed the bushfire hazard risk from hazardous
adverse impacts of bushfire congregating on premises, including reconfiguring a lot, is not located vegetation within the subject site and study area, concluding that the
within a medium or high bushfire hazard area. proposed reconfiguration is partially located within the potential
impact buffer area and will marginally increase the number of people
AO1.2
living on the premises / newly created land parcel. Minimum setback
Development maximises setbacks from hazardous vegetation to achieve an requirements have been identified to ensure any dwelling located
acceptable risk. within proposed Lot 2 achieves a tolerable level of bushfire hazard risk
(i.e. BAL29 minimum and outside of a medium or high bushfire hazard
area) that can be achieve through relevant mitigation measures and/or
dwelling siting outside of the potential impact buffer noting that
adequate land area is available on proposed Lot 2 conforming with this
recommendation. Accordingly, AO1.1 and AO1.2 can be achieved.
Impacts on Ecologically Important Areas
PO2 No acceptable outcome provided PO2 - Complies
Bushfire mitigation measures do not adversely impact on: No bushfire mitigation measures proposed the interference or impact
to vegetation, thus preserving the biodiversity values and long term
a. biodiversity values, connectivity and ecosystem functioning;
physical integrity of waterways, wetland connectivity and ecosystem
and
functioning and complying with PO2.
b. the long term physical integrity of waterways, wetland and
areas of native vegetation.
Water Supply for Fire Fighting Purposes
PO3 AO3.1 AO3.2
Premises are connected to the reticulated water supply.
www.thereforgroup.com.au 24-0565E/BF | Sunshine Butterflies | Bushfire Management Plan | 12.03.2026 | Version 1.0
33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.