Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                         17
                                                Noosa Shire Council
                                           Charges Resolution (No. 2) 2014



10.3       Allocation of levied charge to trunk infrastructure networks

           The proportion of an adopted infrastructure charge to be allocated to a trunk infrastructure
           network in accordance with the breakup agreement for:

                      (a)       distributor-retailer trunk infrastructure, is stated in column 3 in Table 10.2
                                (Allocation of adopted infrastructure charge to trunk infrastructure
                                networks);

                      (b)       Council trunk infrastructure, is stated in column 4 in Table 10.2
                                (Allocation of adopted infrastructure charge to trunk infrastructure
                                networks). Sport and recreation uses are exempt from “Public parks and
                                land for community facilities” proportion of the adopted charge.

Table 10.2 Allocation of levied charge to trunk infrastructure networks

Column 1                        Column 2                    Column 3                                Column 4
Infrastructure charge           Trunk               Allocation of Distributor-         Allocation of Council infrastructure
                                infrastructure        Retailer (Unitywater)          charge to trunk infrastructure networks
                                networks to         infrastructure charge to
                                which an               trunk infrastructure
                                infrastructure              networks
                                charge applies
                                                       Water        Sewerage     Transport       Public parks    Stormwater
                                                       supply         (%)           (%)          and land for        (%)
                                                        (%)                                      community
                                                                                                   facilities
                                                                                                      (%)

Infrastructure charge for       All Networks             40            60              40             50              10
Residential development:
(a) reconfiguring a lot; or
                                No Sewerage              40            Nil             40             50              10
(b) a material change of use;
    or                          No Water Supply
(c) building work                                        Nil           Nil             40             50              10
                                & No Sewerage

                                All Networks             40            60              85             15             *N/A
Infrastructure charge for
Non-Residential
                                No Sewerage              40            Nil             85             15             *N/A
development :
(a) reconfiguring a lot         No Water Supply
                                                         Nil           Nil             85             15             *N/A
                                & No Sewerage

Infrastructure charge for       All Networks             40            60              85             15
Non-Residential                                                                                                   Calculated
development for:                No Sewerage              40            Nil             85             15          Separately
(b) a material change of use;                                                                                      100% to
    or                          No Water Supply                                                                    Council
(c) building work                                        Nil           Nil             85             15
                                & No Sewerage


Note:
* The Non-Residential Stormwater charge is normally unable to be calculated on a reconfiguration of a lot
  approval. This charge will therefore be calculated and applied on subsequent development permits for
  material change of use or building work when the impervious area is able to be determined.




                                     Council Resolution effective 16 February 2015
Log in to download the original file

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.