Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                     29
                                            Noosa Shire Council
                                       Charges Resolution (No. 2) 2014



                 (b)      construction of the infrastructure has not yet started
                 (c)      the infrastructure is inconsistent with the requirements for non-trunk
                          infrastructure stated in section 665 of the SPA
                 (d)      the infrastructure is owned or will be owned by the local government
                 (e)      the infrastructure is not temporary infrastructure
                 (f)      the infrastructure will be used by other development
                 (g)      the type, capacity and function of the infrastructure is:
                          (i)      consistent with the trunk infrastructure identified in the local
                                   government’s LGIP and the examples of trunk infrastructure
                                   identified for a network in Table 13.1
                          (ii)     inconsistent with the examples of non-trunk infrastructure identified
                                   for a network in Table 13.1
                 (h)      the type, size and location of the infrastructure is the most cost effective
                          option for servicing multiple developments in the area.
                 (i)      the infrastructure could have been planned by the local government
                          without knowing the detailed layout of lot reconfigurations or the design
                          details for material change of use applications in the area. That is, the
                          infrastructure could have been planned during preparation of the LGIP
                          using only the planned density assumptions stated in the LGIP.
        (2)      The most cost effective option for trunk infrastructure provision means the least
                 cost option based upon the life cycle cost of the infrastructure required to service
                 future urban development in the area at the desired standard of service.


Table 13.1 – Examples of trunk infrastructure and non-trunk infrastructure for Council’s
networks

Infrastructure network   Examples of trunk infrastructure                Examples of non-trunk infrastructure

Stormwater               Land and/or works for:                          Land and/or works for:
                          the following stormwater infrastructure          Privately     owned      stormwater
                           items which service a minimum of 300              infrastructure (e.g. dams, retention
                           residential lots or equivalent demand:            basins on private property)
                            o Bio-retention swale                           bulk   stormwater      infrastructure
                            o Channel                                        owned by state or state entity
                            o Culvert                                       the        following    stormwater
                            o Pipe                                           infrastructure items which service
                                                                             less than 300 residential lots or
                            o Revegetation                                   equivalent demand:
                            o Stormwater quality devices                     o Bio-retention swale
                            o Retention basin / wetland                      o Channel
                            o Detention basin                                o Culvert
                                                                             o Pipe
                                                                             o Revegetation
                                                                             o Stormwater quality devices
                                                                             o Retention basin / wetland
                                                                             o Detention basin




                                 Council Resolution effective 16 February 2015
Log in to download the original file

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.