Original source · versioned page text
2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
4
Noosa Shire Council
Charges Resolution (No. 2) 2014
Part 1 Introduction
1. Preliminary
1.1 Short title
The charges resolution may be cited as Noosa Shire Council Charges Resolution (No. 2)
2014.
1.2 Sustainable Planning Act 2009
(1) The resolution is made pursuant to section 630 of the Sustainable Planning Act
2009.
(2) The resolution is to be read in conjunction with the following:
(a) the State planning regulatory provision (adopted charges);
(b) the applicable local planning instrument.
(3) The resolution is attached to but does not form part of the applicable local
planning instrument.
1.3 Effect
The resolution has effect from 16 February 2015
1.4 Purpose of the resolution
The purpose of the resolution is to assist with the implementation of the applicable local
planning instrument by stating the following:
(a) an adopted infrastructure charge for determining the levied charge for
funding part of the establishment cost of the following trunk infrastructure
networks:
(i) transport network;
(ii) public parks and land for community facilities network;
(iii) stormwater network;
(iv) water supply network;
(v) sewerage network;
(b) stating other matters relevant to the adopted infrastructure charge.
1.5 Interpretation
(1) In this resolution:
Council Resolution effective 16 February 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.