Skip to the record
Accept no imitations.

Original source · versioned page text

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                       4
                                              Noosa Shire Council
                                         Charges Resolution (No. 2) 2014




       Part 1                      Introduction

  1.          Preliminary
1.1     Short title

        The charges resolution may be cited as Noosa Shire Council Charges Resolution (No. 2)
        2014.

1.2     Sustainable Planning Act 2009

        (1)       The resolution is made pursuant to section 630 of the Sustainable Planning Act
                  2009.

        (2)       The resolution is to be read in conjunction with the following:

                  (a)      the State planning regulatory provision (adopted charges);

                  (b)      the applicable local planning instrument.

        (3)       The resolution is attached to but does not form part of the applicable local
                  planning instrument.

1.3     Effect

        The resolution has effect from 16 February 2015

1.4     Purpose of the resolution

        The purpose of the resolution is to assist with the implementation of the applicable local
        planning instrument by stating the following:

                  (a)      an adopted infrastructure charge for determining the levied charge for
                           funding part of the establishment cost of the following trunk infrastructure
                           networks:

                           (i)          transport network;

                           (ii)         public parks and land for community facilities network;

                           (iii)        stormwater network;

                           (iv)         water supply network;

                           (v)          sewerage network;

                  (b)      stating other matters relevant to the adopted infrastructure charge.


1.5     Interpretation

        (1)       In this resolution:




                                   Council Resolution effective 16 February 2015
Log in to download the original file

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.