Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2022-07-18 General Committee Meeting Agenda

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


                Monday, 18 July 2022

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-07-18 General Committee Meeting Agenda(PDF, 2MB).pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 44 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                 18 JULY 2022


TABLE OF CONTENTS

ITEM                                                                    PAGE

1.     ATTENDANCE & APOLOGIES                                               3

2.     CONFIRMATION OF MINUTES                                              3

3.     PRESENTATIONS                                                        3

4.     DEPUTATIONS                                                          3

5.     ITEMS REFERRED FROM COMMITTEES                                       3

       1   MCU21/0228 & OPW21/0364 – CHANGE REPRESENTATIONS TO A
           DEVELOPMENT APPROVAL FOR MULTIPLE DWELLING AND OFFICE, AND
           ROADWORK, DRAINAGE WORK, LANDSCAPING, STORMWATER,
           EARTHWORKS - 245 DAVID LOW WAY PEREGIAN BEACH QLD 4573            3

       2   MCU19/0017.02 & RAL19/0004.02 – MINOR CHANGE TO DEVELOPMENT
           APPROVAL FOR COMMERCIAL BUSINESS - TYPE 1 OFFICE, COMMERCIAL
           BUSINESS - TYPE 2 MEDICAL & ANCILLARY DWELLING UNIT &
           RECONFIGURATION OF A LOT – ACCESS EASEMENT AT 36 - 40 HOFMANN
           DRIVE, NOOSAVILLE                                                 3

       3   MCU21/0212 APPLICATION FOR A MATERIAL CHANGE OF USE FOR A
           DWELLING HOUSE AT 66 SEAVIEW TERRACE, SUNSHINE BEACH              3

6.     REPORTS DIRECT TO GENERAL COMMITTEE                                  4

       4   CONTRACT NO. T000078 – REGISTER OF PRE-QUALIFIED SUPPLIERS FOR
           PROVISION OF FIRETECH SERVICES                                    4

       5   DESTINATION MANAGEMENT PROJECT CONTROL GROUP                      9

       6   APPLICATION OF NATIONAL COMPETITION POLICY REFORM                14

       7   FINANCIAL PERFORMANCE REPORT – JUNE 2022                         17

       8   APPOINTMENT OF PLANNING & ENVIRONMENT COMMITTEE CHAIR            32

       9   2022 LGAQ ANNUAL CONFERENCE MOTIONS – NOOSA COUNCIL              34

7.     CLOSED SESSION                                                 45




                                                                  Page 2 of 45

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                       18 JULY 2022


1.   ATTENDANCE & APOLOGIES




2.   CONFIRMATION OF MINUTES

     The Minutes of the General Committee Meeting held on 13 June 2022 be received and
     confirmed.


3.   PRESENTATIONS

     Nil.


4.   DEPUTATIONS

     Nil.


5.   ITEMS REFERRED FROM COMMITTEES

     PLANNING & ENVIRONMENT COMMITTEE

     1      MCU21/0228 & OPW21/0364 – CHANGE REPRESENTATIONS TO A
            DEVELOPMENT APPROVAL FOR MULTIPLE DWELLING AND OFFICE, AND
            ROADWORK,    DRAINAGE     WORK,   LANDSCAPING,    STORMWATER,
            EARTHWORKS - 245 DAVID LOW WAY PEREGIAN BEACH QLD 4573
            (Planning & Environment Committee Agenda, 12 July 2022, Item 2, Page 14)
            Reason for referral – for further consideration.


     2      MCU19/0017.02 & RAL19/0004.02 – MINOR CHANGE TO DEVELOPMENT
            APPROVAL FOR COMMERCIAL BUSINESS - TYPE 1 OFFICE, COMMERCIAL
            BUSINESS - TYPE 2 MEDICAL & ANCILLARY DWELLING UNIT &
            RECONFIGURATION OF A LOT – ACCESS EASEMENT AT 36 - 40 HOFMANN
            DRIVE, NOOSAVILLE
            (Planning & Environment Committee Agenda, 12 July 2022, Item 3, Page 46)
            Reason for referral – for further consideration.


     3      MCU21/0212 APPLICATION FOR A MATERIAL CHANGE OF USE FOR A
            DWELLING HOUSE AT 66 SEAVIEW TERRACE, SUNSHINE BEACH
            (Planning & Environment Committee Agenda, 12 July 2022, Item 5, Page 94)
            Reason for referral – significance of the issue.

     SERVICES & ORGANISATION COMMITTEE

     Nil.


                                                                                       Page 3 of 45

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                       18 JULY 2022


6.    REPORTS DIRECT TO GENERAL COMMITTEE


4     CONTRACT NO. T000078 – REGISTER OF PRE-QUALIFIED SUPPLIERS FOR
      PROVISION OF FIRETECH SERVICES
Author            Director, Peregian Digital Hub, Chris Boden
                  Environment and Sustainable Development Department

Index             ECM / Subject / Contracting / Contractors & Consultants
                  ECM / Project & Contract / T000078 Register of Pre-Qualified Suppliers for
                  Provision of Firetech Services / Reports to Council

Attachments       Nil


EXECUTIVE SUMMARY
The report provides a tender evaluation summary and recommendation to award the contract to
the list of suppliers for inclusion to the Register of Pre-qualified Suppliers (ROPS) for Provision of
Firetech Services.
     The categories/services included in this ROPS are:
      o     Category 01 – Bushfire Prediction
      o     Category 02 – Bushfire Detection
      o     Category 03 – Aerial Operations
      o     Category 04 – Uncrewed Firefighting Solutions
     In accordance with Council Procurement Policy and procedure, an Invitation to Tender (ITT)
      was initiated and attracted twelve (12) responses.
     Whilst Council encouraged all capable suppliers to tender, Council intends to utilise this
      ROPS to encourage the development of competitive local business and industry. This may
      result in Council giving preference to local suppliers over non-local suppliers when engaging
      suppliers from the ROPS.
     The ROPS is a register of suppliers that are pre-qualified and capable of responding to the
      Council’s requirements in a timely manner; and where the Council can either:
      o     directly engage a supplier from the ROPS on an as required basis utilising the rates
            provided within the Schedule of Pricing or on other rates as agreed; or
      o     request quote(s) from one or more suppliers on the ROPS on an as required basis for
            fixed term services utilising the rates provided within the Schedule of Pricing or on other
            rates or lump sum price as agreed.
     Inclusion onto this ROPS does not provide a guarantee of work during the term of this
      Contract.
     The ROPS is to be awarded to the suppliers listed for an initial term of twelve (12) months
      plus four (4) further term extensions of up to twelve (12) months subject to satisfactory
      performance. Council will also have the option to refresh the ROPS at each term extension
      to allow additional suppliers to be included.
     The tender evaluation panel completed the evaluation process and considered the suppliers
      listed in the recommendation below to be most advantageous to Council.



                                                                                         Page 4 of 45

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                      18 JULY 2022


RECOMMENDATION
That Council note the report by the Peregian Digital Hub Director to the General Committee
Meeting dated 18 July 2022 and
A.    Award Contract No. T000078 for a Register of Pre-qualified Suppliers for the Provision of
      Firetech Services for a period of twelve (12) months commencing on 1 August 2022 to the
      following suppliers:
           3FB Aerworx Pty Ltd
           Meshed Pty Ltd
           Fireball International Pty Ltd t/as EXCI.AI
           Bredon Kynnie McAtee t/as Image Knowledge (Mayday.ai GmbH)
           Mirragin RAS Consulting Pty Ltd t/as Mirragin Consulting
           N5 Sensors, Inc.
           Ninox Robotics Pty Ltd t/as Ninox Robotics
           OroraTech GmbH
           Arvind Satyam (Pano AI)
           Redeye Apps Pty Ltd t/as RedEye
           Ripper Corporation Pty Ltd
           Skybase Limited t/as Skybase
B.    Subject to satisfactory performance of the suppliers, authorise the CEO (or delegate) to
      approve the option to extend the contract at the expiry of initial term for a further four (4)
      terms of up to twelve (12) months each ending on 31 July 2027.

REPORT
1.    Background
Noosa Council invited tenders from suitably qualified contractors/consultants for appointment to a
Register of Pre-qualified Suppliers (ROPS) for Provision of Firetech Services to support the
delivery of programs and projects across the Noosa Shire Council local government area.
The categories of services sought were:
     Category 01 – Bushfire Prediction
     Category 02 – Bushfire Detection
     Category 03 – Aerial Operations
     Category 04 – Uncrewed Firefighting Solutions
Firetech Connect is a Noosa Council initiative to help speed up the adoption of innovative
technology solutions for building bushfire resilience in regional communities.
Disaster management is a high-risk sector where the protection of lives and property are at stake.
New technology solutions therefore face a significant burden of proof to establish that they are safe
and effective before they can be widely adopted.
The efficacy of new solutions can best be assessed through deployments in real-world conditions.
However, most of the organisations responsible for building bushfire resilience lack the full
capabilities to conduct these trials; they may lack access to tech solutions, have budget constraints,
or a lack of trial facilities. As a result, adoption of innovation is often stifled.
To help overcome these barriers, Council’s Firetech Connect program has developed an
innovation platform that it will offer to Emergency Services, LGAs and Enterprises.
That platform consists of a global network of solution providers, a Living Lab in which solutions can
be deployed, and seed-funding via federal grant support and Council capabilities to operationalise
those solutions.
The intension of the establishment of this ROPS involves deploying solutions in and around the
Noosa Council local government area.

                                                                                        Page 5 of 45

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                         18 JULY 2022


2.       Invitation to Tender
In accordance with Part 3 of the Local Government Regulations and Council Procurement Policy,
Council invited written tenders for the provision of firetech services across a range of categories.
The ITT was issued as a schedule of rates contract for an initial contract term of twelve (12) months,
plus four (4) further terms of up to twelve (12) months each at Council’s sole discretion, and subject
to satisfactory performance.
Council invited written tenders via the Council VendorPanel e-portal on 3 June 2022 and advertised
the tender within the Noosa Today publication on 10 June 2022, with responses closing on 27 June
2022.
70 suppliers read the ITT in VendorPanel. Twelve (12) responses were received within the
VendorPanel e-portal from the following suppliers in alphabetical order:
        3FB Aerworx Pty Ltd
        Meshed Pty Ltd
        Fireball International Pty Ltd t/as EXCI.AI
        Bredon Kynnie McAtee t/as Image Knowledge (Mayday.ai GmbH)
        Mirragin RAS Consulting Pty Ltd t/as Mirragin Consulting
        N5 Sensors, Inc.
        Ninox Robotics Pty Ltd t/as Ninox Robotics
        OroraTech GmbH
        Arvind Satyam (Pano AI)
        Redeye Apps Pty Ltd t/as RedEye
        Ripper Corporation Pty Ltd
        Skybase Limited t/as Skybase
3.       Tender Evaluation
The conforming tenderers were then evaluated against the following evaluation criteria:
     Criteria
                                       Respondent MUST provide evidence in the response to suggest
     Technical, Financial and          that the respondent does have the necessary Technical and
     Managerial Capability             Managerial Capability necessary to perform contracts on time
                                       and in accordance with agreed requirements.
                                       MUST provide schedule of rates.
                                       Respondent MUST provide evidence in the response to suggest
     Price
                                       that the respondent, if engaged to perform the contract, would
                                       provide value for money.
The evaluation was conducted by the Evaluation Panel consisting of the following members of
staff:
        Director Peregian Digital Hub (Contract Administrator)
        Disaster Management Officer; and
        Disaster Resilience Officer.
Each member of the Evaluation Panel read and declared that they understood and accepted the
probity requirements, which includes a declaration of conflicts of interest and confidentiality.
The tender evaluation panel completed the evaluation process and considered the following list of
12 (twelve) suppliers as suitable inclusion to the ROPS.
        3FB Aerworx Pty Ltd
        Meshed Pty Ltd
        Fireball International Pty Ltd t/as EXCI.AI
        Bredon Kynnie McAtee t/as Image Knowledge (Mayday.ai GmbH)
        Mirragin RAS Consulting Pty Ltd t/as Mirragin Consulting
        N5 Sensors, Inc.

                                                                                          Page 6 of 45

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                         18 JULY 2022


        Ninox Robotics Pty Ltd t/as Ninox Robotics
        OroraTech GmbH
        Arvind Satyam (Pano AI)
        Redeye Apps Pty Ltd t/as RedEye
        Ripper Corporation Pty Ltd
        Skybase Limited t/as Skybase
The category split nominated by suppliers to this ROPS was as per the table below.
                                                                                                04.
                                           01. Bushfire    02. Bushfire     03. Aerial      Uncrewed
    Respondent Name / Category
                                            Prediction      Detection      Operations      Firefighting
                                                                                            Solutions
    3FB Aerworx Pty Ltd                                                        YES

    Meshed Pty Ltd                             YES             YES

    Fireball International Pty Ltd t/as
                                                               YES
    EXCI.AI
    Bredon Kynnie McAtee t/as Image
                                               YES             YES
    Knowledge (Mayday.ai GmbH)
    Mirragin RAS Consulting Pty Ltd t/as
                                               YES             YES             YES            YES
    Mirragin Consulting

    N5 Sensors, Inc.                                           YES

    Ninox Robotics Pty Ltd t/as Ninox
                                                                               YES
    Robotics

    OroraTech GmbH                             YES             YES

    Arvind Satyam (Pano AI)                                    YES

    Redeye Apps Pty Ltd t/as RedEye            YES

    Ripper Corporation Pty Ltd                 YES                             YES            YES

    Skybase Limited t/as Skybase                                               YES            YES

4.         Next Steps
Contract documents shall be issued to the suppliers recommended and approved for inclusion to
the ROPS, and all suppliers will be required to register and maintain their details in the
VendorPanel e-portal to ensure licences and other qualifications are maintained.
The ROPS is a register of suppliers that are pre-qualified and capable of responding to the
Council’s requirements in a timely manner; and where the Council can either:
        directly engage a supplier from the ROPS on an as required basis utilising the rates provided
         within the Schedule of Pricing or on other rates as agreed; or
        request quote(s) from one or more suppliers on the ROPS on an as required basis for fixed
         term services utilising the rates provided within the Schedule of Pricing or on other rates or
         lump sum price as agreed.
Inclusion onto this ROPS does not provide a guarantee of work to suppliers during the term of this
Contract.
Suppliers shall be engaged under this ROPS applying the Panel Management Plan as a guide.
The Panel Management Plan is used by contract managers/administrators to document all key

                                                                                         Page 7 of 45

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                                  18 JULY 2022


information about how the ROPS will be utilised.
Where suppliers are invited to participate in specific works under this ROPS, the Panel
Management Plan will require contract managers/administrators to seek from suppliers their
commitment to the local economy, environmental management systems, environmental
sustainability initiatives and workplace health and safety management systems as may be
applicable.
Previous Council Consideration
Nil.
Finance
Firetech services are engaged on an as needs basis under a schedule of rates or a negotiated
lump sum price in accordance with the Panel Management Plan utilising existing budget from
capital and operational expenditure, most of which is likely to be grant funded. It is anticipated that
the expenditure on this ROPS will be approximately $100k to $400k per year.
Risks & Opportunities
The establishment of a ROPS reduces the risks associated with engaging these services ensuring
Council complies with the Local Government Act 2009 and Local Government Regulation 2012.
The ROPS also is an effective way to reduce the workload on both Council and contractors to
undertake work in a timely manner, while still ensuring compliance with Council’s Procurement
Policy.
The development of a Panel Management Plan will provide internal staff guidance in relation to the
selection of contractors from the panel and assessment of contractor performance.
 Resource Risks                      Mitigation
 Quality, safety, and service        The Suppliers have nominated capable personnel for the services sought
 are affected due to                 here and can add additional and appropriately skilled resources as
 resource shortages.                 required.
                                     Council can engage the services of Suppliers of this ROPS in the event of
                                     a Supplier being unable to supply services. Council will regularly monitor
                                     any patterns where the Suppliers are unable to provide firetech services
                                     as required, and review as per conditions of contract.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Departments/Sections Consulted:
       Chief Executive Officer           Community Services                        X   Corporate Services
       Executive Support                 Director                                      Director
                                         Community Development                         Financial Services
                                         Community Facilities                          Fleet
                                         Libraries & Galleries                         ICT
                                         Local Laws                                X   Procurement
                                         Waste & Environmental Health                  Property
                                                                                       Revenue Services

       Executive Services            X   Environment & Sustainable Development         Infrastructure Services
       Director                      X   Director                                      Director
       Community Engagement              Building & Plumbing Services                  Asset Management
       Customer Service                  Development Assessment                        Buildings and Facilities
       Governance                        Economic Development                          Civil Operations
       People and Culture (Safety)       Environmental Services                        Disaster Management
                                         Strategic Land Use Planning                   Infrastructure Planning,
                                                                                       Design and Delivery



                                                                                                    Page 8 of 45

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                       18 JULY 2022


5     DESTINATION MANAGEMENT PROJECT CONTROL GROUP

Author            Manager, Economic Development, Lynne Banford
                  Environment and Sustainable Development Department

Index             ECM / Subject / Economic Development / Destination Management

Attachments       1.   Draft Project Control Group Terms of Reference


EXECUTIVE SUMMARY
The purpose of this report is to inform Councillors of, and seek their support for, the formation of a
Project Control Group to provide strategic advice and guidance to the Destination Management
Plan (DMP) process.
This will bring the DMP process into alignment with other important Council policies, strategies,
and activities.
RECOMMENDATION
That Council note the report by the Manager, Economic Development to the General Committee
Meeting dated 18 July 2022, and
A.    Approve the formation of a Destination Management Plan (DMP) Project Control Group
      (PCG);
B.    Approve the Terms of Reference for the DMP PCG provided at Attachment 1; and
C.    Appoint Cr Stewart – Mayor as the Chair, and Councillors < > and < > as representatives on
      the DMP PCG.

REPORT
1.    Background
Prior to 2020, significant growth in global travel meant that some destinations around the world
including Noosa, were already under increasing pressure from tourism, resulting in overcrowding
and negative effects on the quality of the visitor experience, the environment, and communities.
In response to growing community sentiment for enhanced governance to better manage Noosa’s
icons and those intrinsic qualities that brought visitors to the shire, Noosa Council endorsed a
destination management approach to help guide Noosa Shire and ensure a sustainable approach
was achieved.
The Destination Management approach also provided opportunities for Noosa Council to review
its visitor economy in response to two important economic drivers:
a.    Ongoing impacts of COVID-19 on the tourism industry; and
b.    Brisbane 2032 Olympic Games
2.    Destination Management Approach
Destination Management is a process that enables a successful place - one that enriches the lives
of its people and their place, by delivering benefits across economic, social, cultural, and
environmental wellbeings.
In implementing this approach, Noosa Council’s goal is to develop a future focused and sustainable
Destination Management Plan that:
     Enriches the lives of Noosa’s people
     Supports a thriving and sustainable shire
     Enhances quality of life for Noosa’s residents

                                                                                        Page 9 of 45

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                      18 JULY 2022


     Improves tourism sector productivity
     Retains, protects, and champions Noosa’s natural environment and biosphere credentials
     Champions and protects Kabi Kabi (Gubbi Gubbi) indigenous culture and heritage
     Delivers exceptional visitor experiences
     Maintains and builds on Noosa’s brand equity
     Leverages and benefits from 2032 Brisbane Olympic Games
3.    The Process
A well-developed Destination Management Plan is informed by a robust evidence base, aligned to
significant and meaningful engagement with both the community and key regional stakeholders,
opinion leaders and influencers.
It considers all aspects of the visitor economy – the visitor experience, the marketing and promotion
of the region and the implications and constraints of resource management on the future growth of
visitor economy.
The process agreed by the Executive Team, Leadership Group and Councillors for the
implementation of the Destination Management Process was:
     Phase 1     Initial Briefing
     Phase 2     Investigation
     Phase 3     Draft DMP Written
     Phase 4     Socialisation of Draft DMP
     Phase 5     Endorsement of DMP
We are now in Phase 2 of the project, and it is proposed to bring the DMP process into alignment
with other Council policies and strategic plans and convene a PCG to guide and advise on the next
phases of the project.
4.    The Project Control Group
a.    Composition
      It is recommended that the Project Control Group (PCG) comprises of the following
      members:
      Mayor            Noosa Council (Chairperson)
      Councillor 1     Noosa Council
      Councillor 2     Noosa Council
      Chairman         Tourism Noosa
      CEO              Earthcheck
      CEO              Noosa Council
      Director ESD     Noosa Council
b.    Primary Role
      The primary role of the PCG will be to provide information and advice in the development of
      a Destination Management Plan, informed by robust evidence-bases and collected and
      analysed by Council Officers as part of this process.
      Critical to the Destination Management process and therefore to the Terms of Reference that
      guide the PCG, is a genuine commitment to ensuring that “people and their place” are at the
      forefront of any recommendations or actions being tabled by PCG members as part of the
      process and/or the plan.
      Terms of Reference from the PCG are attached as Attachment 1 to this document.
      NOTE: An internal Advisory Team was also convened at the outset of the process to provide
      advice, oversight, and enable informed decision making.




                                                                                     Page 10 of 45

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                                 18 JULY 2022


        This team operates at a tactical level to ensure that any key actions (which may impact their
        respective business unit) are successfully discussed and embedded into their business units’
        policies, strategies, and activities.
        c.     Meeting Frequency
        It is recommended that the PCG meets every six weeks to review work-in-progress actions,
        consider new evidence bases and provide comment and feedback on a draft DMP.
        The PCG will be convened sooner, should urgent matters require an earlier meeting.
Previous Council Consideration
Nil.
Finance
The process to develop the Destination Management Plan was initiated and funded in 2021/2022
financial year, further funding has been allocated to continue and complete this process in
2022/2023 financial year.
Risks & Opportunities
             Risk                                                   Opportunities
      Perceived vested             Conflicts of interest tabled
       interest of PCG              Discussion to be supported by robust evidence base
       members                      PCG members to have open mind approach
                                    Consensus view (of members) will prevail
      PCG members                  Healthy debate encouraged but moderated
       disagree on                  Consensus view (of members) will prevail
       outcomes
      Composition of PCG        External members of the PCG:
       challenged (other          Represent large membership bases, business associations or precincts.
       external                   Have expertise to share in the disciplines of tourism and/or the
       organisations wish            environment
       to have a seat at the     Opportunities exist to invite other business experts to the table to discuss
       table)                    specific information or insights.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
     CEO
     Executive Directors
Departments/Sections Consulted:
 X     Chief Executive Officer           Community Services                           Corporate Services
       Executive Support                 Director                                     Director
                                         Community Development                        Financial Services
                                         Community Facilities                         Fleet
                                         Libraries & Galleries                        ICT
                                         Local Laws                                   Procurement
                                         Waste & Environmental Health                 Property
                                                                                      Revenue Services

       Executive Services            X   Environment & Sustainable Development        Infrastructure Services
       Director                      X   Director                                     Director
       Community Engagement              Building & Plumbing Services                 Asset Management
       Customer Service                  Development Assessment                       Buildings and Facilities
       Governance                    X   Economic Development                         Civil Operations
       People and Culture                Environmental Services                       Disaster Management
                                         Strategic Land Use Planning                  Infrastructure Planning,
                                                                                      Design and Delivery

                                                                                                 Page 11 of 45

Section 12

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022


                                   Attachment 1




                                   Page 12 of 45

GENERAL COMMITTEE MEETING AGENDA                                                       18 JULY 2022

                                                                                        Attachment 1

  m MBN ere.
  @     | COUNCIL

                  Project Control Group Terms of Reference

                        Destination Management Plan

    Name                         Destination Management Plan Project Control Group
                                 (DMP PCG)
   Goals                         Develop a future focused and sustainable Destination
                                 Management Plan that:
                                  .     Enriches the lives of Noosa’s people
                                  .     Supports a thriving and sustainable shire
                                  .     Improves tourism sector productivity
                                  .     Restores, protects, and champions Noosa’s natural
                                        environment and biosphere credentials
                                  .     Champions and protects Gubbi Gubbi (Kabi Kabi)
                                        indigenous culture and heritage
                                  .     Delivers exceptional visitor experiences
                                  .     Maintains and builds on Noosa’s brand equity
                                  .     Leverages and benefits from 2032 Brisbane Olympic
                                        Games

     Roles & Responsibilities    The Destination Management Plan Project Control Group will
                                 provide guidance and oversight of the development of the
                                 Destination Management Plan and process, specifically the
                                 group will :
                                  .   Contribute  intelligence, insights, and advice to the
                                       Destination Management Plan process and to the content
                                      of the written plan on behalf of their respective
                                      organisation or industry;
                                  .    Explore potential outcomes, and recommended courses
                                      of action which is supported by robust and current
                                      evidence bases;
                                  .    Help to identify and mitigate any potential risks or issues
                                      raised within the DMP process and to the content of the
                                      written plan;
                                  .    Help to mitigate any potential nsks and challenges to the
                                       DMP process and content of the written plan;
                                  .   Champion the DMP process and written plan within their
                                       respective organisation or industry.
                                The Destination Management Plan Project Control Group is a
                                 future focused forum that encourages genuine information
                                 exchange and considered discussion between members.
                                 It is not a decision-making forum, nor does it seek to unduly
                                 influence or advocate for outcomes that are unsupported by a
                                 robust and current evidence base.
                                 PCG members come to each meeting with an open mind and a
                                 willingness to put Noosa people and their place to the forefront
                                 of any suggested recommendations or actions.

                                                                                       Page 12 of 45

Section 13

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022




                                   Page 13 of 45

GENERAL COMMITTEE MEETING AGENDA                                                        18 JULY 2022

                                 It will operate based on mutual respect for each other and for
                                the process. Divergence of opinion will be settled by the
                                 consensus view.
                                 Matters discussed by the PCG are considered confidential until
                                 publicly released.
   Timeframes                    The Destination Management Plan Project Control Group will be
                                 convened from July 2022 to 30 June 2023.
    Meeting Frequency            It is recommended that the DMP PCG is convened at
                                  .    6-weekly intervals to review and discuss work in progress
                                      matters,   research    findings   and     potential
                                       recommendations; or
                                  .    On a needs basis should an important matter require
                                       more urgent consideration
   Membership                       1. Mayor, Noosa Council (Chair)
                                    2. Councillor 1, Noosa Council
                                    3. Councillor 2, Noosa Council
                                    4. Chairman, Tourism Noosa Ltd
                                    5. CEO, Earthcheck
                                    6. CEO Noosa Council
                                    7. Director ESD, Noosa Council
    Meeting Coordinator          Destination Management Lead

                                                                                        Page 13 of 45

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                         18 JULY 2022


6     APPLICATION OF NATIONAL COMPETITION POLICY REFORM

Author            Manager Financial Services (Acting), Pauline Coles
                  Corporate Services Department

Index             ECM/ 22.11 National Competition Policy

Attachments       Nil

EXECUTIVE SUMMARY
Each financial year Council is required to decide whether to apply National Competition Policy
(NCP) reform to its identified business activities. NCP reform provides greater transparency over
Council business, assists with removing any anti-competitive conduct and ensures the best
allocation of Council’s limited resources. Council has adopted NCP reforms with respect to the
Waste Management and Holiday Parks business activities since de-amalgamation in 2014.

RECOMMENDATION
That Council note the report by the Manager Financial Services (Acting) to the General Committee
Meeting dated 18 July 2022 and:
A.    Continue to apply the Full Cost Pricing reform option to the Waste Management business
      activity for the 2022/23 financial year in accordance with section 44(1)(b) of the Local
      Government Act 2009; and
B.    Continue to apply the Code of Competitive Conduct to the Holiday Parks business activity
      for the 2022/23 financial year in accordance with section 47 of the Local Government Act
      2009.

REPORT
The Local Government Act 2009 requires Council to decide each financial year whether to apply
National Competition Policy (NCP) reform to its identified business activities.
Certain activities of Council are required to be identified as business activities if they trade in goods
and services that could potentially be delivered by a private sector firm for the purposes of earning
profits in the absence of Council’s involvement. They do not include the non-business, non-profit
activities of Council such as the libraries, aquatic centre, parks maintenance etc.
The primary purpose for Council to apply NCP reforms to its business activities is to assist in
removing anti-competitive conduct, encourage greater transparency in the operation of its
competitive activities and improve the allocation of Council’s limited resources.
A number of different reform options are provided under legislation for application to identified
business activities. Commercialisation or Full Cost pricing reforms are generally applied to larger
or financially significant business activities, whereas the Code of Competitive Conduct is applied
to the smaller or prescribed business activities.
The general premise to consider is that the larger the Council business activity the larger the
potential financial impact on the local economy and potential competitors, and hence greater level
of reform applied to ensure ongoing competitive neutrality.
1.    Business Activity Classification
Expenditure thresholds are published each financial year by the Department of State Development,
Infrastructure, Local Government & Planning. Councils are required to determine if any of their
activities deemed competitive in nature are classified as either a significant business activity based
on the definition under the Local Government Regulation 2012, or a prescribed or smaller business


                                                                                         Page 14 of 45

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                                    18 JULY 2022


activity when implementing the Competitive Code of Conduct. The expenditure thresholds
applicable for the 2022/23 financial year are as follows:
       $9.7 million for significant business activities; and
       $340,000 for Code of Competitive Conduct business activities.

2.      Application to Identified Business Activities for the 2022/23 Financial Year
Two of Council’s activities have been identified as competitive in nature that meet the criteria and
relevant threshold levels for identification as business activities. The activities that have been
identified and reform levels to apply (based on the estimated annualised budgeted expenditure)
are:

    Business Activity            Expenditure               Reform Level
    Waste Management             $13.5 million             Significant
    Holiday Parks                $2.2 million              Code of Competitive Conduct
Note: annualised expenditure for significant activities includes total operating expenses less depreciation less
competitive neutrality costs plus interest and loan redemption. Expenditure for code of competitive conduct activities
includes total operating expenses plus interest.

In the 2022/23 financial year Council officers will undertake a broader review of Council operations
to identify any other business activities that may need to be considered under the NCP reforms for
future budget years.
Previous Council Consideration
Council has adopted NCP reforms to the Waste Management and Holiday Parks business activities
since de-amalgamation in 2014.
Finance
The financial implications of NCP reforms primarily revolve around pricing strategies for full cost
recovery, which includes a return on investment component. In addition, there is an administrative
effort in ensuring ongoing competitive neutrality compliance (i.e. budget preparation, reporting, full
cost pricing modelling).
Risks & Opportunities
Failure to appropriately review and apply competition reforms annually is a breach of the Local
Government Act 2009, and could also potentially result in competitive neutrality complaints should
appropriate adjustments not be incorporated into business activity pricing decisions.
Consultation
External Consultation - Community & Stakeholder
Council has referenced the latest advice received from by the Department of Local Government,
Racing and Multicultural Affairs in relation to expenditure thresholds
Internal Consultation
Nil.
Departments/Sections Consulted:
       Chief Executive Officer         Community Services                            X   Corporate Services
       Executive Support               Director                                      X   Director
                                       Community Development                         X   Financial Services
                                       Community Facilities                              Fleet
                                       Libraries & Galleries                             ICT
                                       Local Laws                                        Procurement
                                       Waste & Environmental Health                      Property
                                                                                         Revenue Services



                                                                                                    Page 15 of 45

Section 16

GENERAL COMMITTEE MEETING AGENDA                                             18 JULY 2022


   Executive Services     Environment & Sustainable Development   Infrastructure Services
   Director               Director                                Director
   Community Engagement   Building & Plumbing Services            Asset Management
   Customer Service       Development Assessment                  Buildings and Facilities
   Governance             Economic Development                    Civil Operations
   People and Culture     Environmental Services                  Disaster Management
                          Strategic Land Use Planning             Infrastructure Planning,
                                                                  Design and Delivery




                                                                             Page 16 of 45

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                                   18 JULY 2022


7       FINANCIAL PERFORMANCE REPORT – JUNE 2022

Author               Financial Services Manager (Acting), Pauline Coles
                     Corporate Services Department

Index                ECM/ Subject / 22.09 – Monthly Financial Performance Report

Attachments          1.      Statement of Income and Expenditure (Profit & Loss and Capital)
                     2.      Statement of Financial Position
                     3.      Statement of Cash Flows
                     4.      Summary of Materials and Services Expenditure


EXECUTIVE SUMMARY
Financial performance for the 2021/22 year has resulted in an interim operating surplus of $8.9
million, capital revenue of $15.7 million and capital expenditure of $34.4 million.

Note that year-end financial adjustments are still in progress. A further report on final 2021/22
financial performance will be provided to Council in November 2022 following the finalisation and
independent audit of the financial statements in October 2022.

    FY (Interim) Financial Performance Summary
                                          Budget              Actual         Variance   Variance
                                                                                                        Status
                                             $m                  $m               $m          %
    Operating Revenue                      $109.5             $114.5             $4.9      4.5%     Above Budget
    Operating Expense                      $110.2             $105.5             $4.7      4.3%     Below Budget
    Operating Position                       -$0.6               $9.0            $9.6   -1523.0%
    Capital Revenue                          $21.9             $15.7            -$6.1     -28.1%    Below Budget
    Capital Expenditure*                     $48.1             $34.4            $13.6     28.4%     Below Budget
 * Reflects constructed assets and intangibles only (excludes contributed)


The $8.9 million interim operating surplus comprises both a $4.7 million general operating surplus
from activities that are funded through Council’s general rate, regulatory fees and sales of goods
and services; as well an additional $2.0 million in unspent levy and separate charge funds which
are constrained in reserve for future specified uses.

The general operating surplus position is also augmented by a number of incomplete grant-funded
projects, where the unspent grant funds will carry over into the 2021/22 financial year at Budget
Review 1 (BR1). This includes major funding programs such as the $1.4 million disaster recovery
funding. In addition, the Financial Assistance Grant (FAG) for the 2022/23 year was 75% prepaid
to Council in June 2022.

                                                                                          Actual
 Item
                                                                                             $m
 General business operating position (unconstrained funds)                                  $4.7
 Significant Grant Prepayments – FAG & Disaster (constrained
                                                                                            $2.3
 funds)
 Unspent levies operating position (constrained funds)                                      $2.0
 Total Council Operating Position                                                           $9.0

Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.

                                                                                                   Page 17 of 45

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                                   18 JULY 2022


Figure 1: Actual Performance Compared to Budget

$140
                                     $114.5
$120                 $109.5                                             $110.2        $105.5
$100

 $80

 $60

 $40

 $20

   $-
                    Operating Revenue                               Operating Expenditure
                                   YTD Budget ($m)          YTD Actual ($m)

Council’s performance against key measures of financial sustainability has been calculated as at
June 2022. These indicators enable the reader to assess Council’s success in managing its
budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 FY (Interim) Measures of Financial Sustainability
                                                               Current
                                              Target                             Actual FY        Status
                                                               Budget
                                                                                               Above Target
 Operating Surplus Ratio                      0-10%             -0.6%             10.2%
                                                                                                 & Budget
                                                                                               Above Target
 Net Financial Liabilities Ratio              <60%              -12.7%            -28.0%
                                                                                                 & Budget
                                                                                   13.1        Above Target
 Cash Cover Ratio                         3 months            8.8 months
                                                                                  months         & Budget
                                                                                               Above Target
 Asset Sustainability Ratio                   > 90%            130.1%             95.5%
                                                                                               Below Budget


RECOMMENDATION
That Council note the report by the Financial Services Manager (Acting) to the General Committee
Meeting dated 18 July 2022 outlining the interim 2021/22 full year financial performance against
budget, including key financial sustainability indicators.

REPORT
Operating Revenue (FY Benchmark 100.00%)
Council has received 104% ($114.4 million) of its operating revenue budget ($109.6 million).
Commentary on each revenue category is provided below.

 Category             Summary                          Comments
 Rates and Levies     $74.9 million (100.2%)              Waste utility charges $203k above FY budget (101.6%
                      of the annual budget                 or $13.5 million of $13.2 million annual budget earned)
                      of $74.8 million has                General rate (net of discounts) $67k below FY budget
                      been earned                          (99.9% or $56.1 million of $56.2 million annual budget
                                                           earned)



                                                                                                   Page 18 of 45

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                      18 JULY 2022


Category        Summary                   Comments
Fees and        $8.9 million (107.4%)        Property and Facility fees $240k above FY budget
Charges         of the $8.3 million           (158.7% or $648k of $408k annual budget earned)
                annual budget has            Plumbing application fees $162k above FY budget
                been earned                   (112.4% or $1.46 million of $1.3 million annual budget
                                              earned)
                                             Development assessment fees $75k above FY budget
                                              (103.1% or $2.5 million of $2.4 million annual budget
                                              earned)
                                             Local Laws fees $57k above FY budget (103.7% or
                                              $1.6 million of $1.6 million annual budget earned)
                                             Building application fees $41k above FY budget
                                              (104.8% or $898k of $857k annual budget earned)
Sale of Goods   $12.9 million (117%)         Holiday Park sales $706k above FY budget (123% or
and Services    of the $11.1 million          $3.8 million of $3.1 million annual budget earned) –
                annual budget has             offset in part by additional variable operating costs
                been received                Waste management sale of recoverable materials
                                              $595k above FY budget (152.4% or $1.7 million of $1.1
                                              million annual budget earned)
                                             Waste disposal fees $250k above FY budget (106.2%
                                              or $4.2 million of $4.0 million annual budget earned)
                                             Noosa Aquatic Centre revenue $150k above FY
                                              budget (108.7% or $1.87 million of $1.71 million annual
                                              budget earned)
Interest        $795k (119%) of the          Interest revenues on cash invested will need ongoing
Received        $670k annual budget           monitoring to ensure returns on surplus funds are
                has been earned               maximised as investment rates begin to increase.
Other Revenue   $2.8m (90%) of the           Waste kerbside waste bin recoveries from Cleanaway
                $3.1 million annual           below FY budget $123k (45.4% or $102k of $226k
                budget has been               annual budget earned) – correlates with lower kerbside
                earned                        bin purchases
                                             Holiday Park electricity recoupment below FY budget
                                              $118k. No revenue recouped FY due to supplier delays
                                              from COVID. Works have now commenced, and
                                              project is in implementation phase.
                                             Unbudgeted insurance proceeds received $52k
Operating       $8.4 million (142%) of       $1.4 million in Community resilience and disaster
Grants,         the $5.9 million annual       management grants have been received in respect to
Subsidies       budget has been               the recent flood event. These funds have been
                received                      recorded as operational grants until the program of
                                              works has been finalised.
                                             Council received $392k from the Black Summer
                                              Bushfire Recovery Grant program for building bushfire
                                              resilience through technology innovation with $167k
                                              allocated for operational projects.
                                             75% of the 2023 financial assistance grant was prepaid
                                              in April 2022. Historically only 50% of this grant is
                                              prepaid in June so this may impact on Council’s
                                              2022/23 final operating position if the prepayment
                                              approach is discontinued by the Australian
                                              government.
Unitywater      On track                     Unitywater distributions are fixed each year so little
Distributions                                 budget variance risk




                                                                                      Page 19 of 45

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                                                18 JULY 2022


Figure 2: Operating Revenue Position by Type (Excluding Rates)

 $14.0                                      $13.0
                                    $11.1                                 YTD Budget ($m)
 $12.0
                                                                          YTD Actual ($m)
 $10.0
         $8.2 $8.9                                                                       $8.4
  $8.0
                                                                                 $5.9
  $6.0                                                                                          $5.7 $5.7


  $4.0
                                                    $1.9 $1.8
  $2.0                $0.7 $0.8                                     $1.2 $1.0

  $0.0


                                                      Income




                                                                        Other
            Charges




                                      Goods &




                                                                                     Grants




                                                                                                   Unitywater
                                      Services
                                      Sales of




                                                       Rental
                         Interest
            Fees &




                                                                                                    Share of
Operating Expenditure (FY Benchmark 100.00%)
Actual operating expenditure is currently 87% ($95.9 million) of full year budget ($110.1 million).
Detailed commentary for each expenditure category is provided below.

 Category             Summary                                   Comments
 Employee Costs       $34.0 million (89%) of the                   FY under expenditure for permanent staff salaries
                      annual budget of $38.1                        and wages ($3.8 million) due to position
                      million has been expended                     vacancies, partially offset by additional spend on
                                                                    casual staff and external labour hire ($1.93
                                                                    million).
                                                                   Training costs $91k below FY budget (72.7% or
                                                                    $241k of $332k annual budget spent)
 Materials and        $42.6 million (83%) of the                   Environment Services costs $1.6 million below FY
 Services             $51.1 million annual budget                   budget (56% or $2.0 million of $3.6 million annual
                      has been expended.                            budget spent) – COVID-19 impacts on staff have
                                                                    delayed project delivery
                                                                   Community Development $351k below FY budget
                                                                    (78.62% or $1.3 million of $1.6 million annual
                                                                    budget spent)
                                                                   Development Assessment $491k below FY
                                                                    budget (70.4% or $1.1 million of $1.7 million
                                                                    annual budget spent). This underspend relates o
                                                                    lower than forecast expenditure on legal and
                                                                    associated consultancy costs.
                                                                   Strategic Land Use Planning costs $305k below
                                                                    FY budget (38.0% or $188k of $493k annual
                                                                    budget spent)
                                                                   Beaches and Canals $515k below FY budget
                                                                    (42% or $375k of $891k annual budget spent)
                                                                    $444k of this underspend relates to levy funded
                                                                    activities which are restricted funds and transfer
                                                                    to reserves for future programs
                                                                   Libraries & Galleries $332k below FY budget
                                                                    (81.59% or $1.47 million of $1.8 million annual
                                                                    budget spent) –$101k relates to heritage levy
                                                                    projects which are restricted funds and transfer to
                                                                    reserves for future programs

                                                                                                                Page 20 of 45

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                                                      18 JULY 2022


 Category                   Summary                                         Comments
                                                                             Waste Management $153k below FY budget
                                                                               (98.65% or $11.2 million of $11.3 million annual
                                                                               budget spent)
                                                                             Holiday Parks $610k above FY budget (136.48%
                                                                               or $2.28 million of $1.7 million annual budget
                                                                               spent) – offset by additional revenue.
                                                                             Civil Operations $526k above FY budget (107.0%
                                                                               or $7.9 million of $7.4 million annual budget
                                                                               spent). Some of this variance relates in part to
                                                                               flood remediation works undertaken to date and
                                                                               will be funded via disaster recovery grants.
 Finance Costs              On track                                        Nil
 Depreciation               On track                                        Nil
 Other Expenses             On track                                        Nil

Figure 3: Operating Expenditure Position by Type

$60.0
                                  $51.1                                       YTD Budget ($m)
                                            $47.3
$50.0                                                                         YTD Actual ($m)

$40.0       $38.1 $37.2


$30.0
                                                                                      $19.6 $19.6
$20.0

$10.0
                                                        $1.1 $1.1                                          $0.2 $0.2
 $0.0
                                                            Finance Costs
                                       Materials




                                                                                          Depreciation
                Employees




                                                                                                              Other




Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure at 30 June 2022 is outlined below:
 Expenditure                           Annual Budget                              FY Budget              FY Actual       FY Variance
                                                 $m                                     $m                     $m
 Payment to Tourism Noosa                           $2.52                             $2.52                  $2.52                 -

 Economic Development                               $1.06                             $1.06                  $0.73             $0.33

 Total                                              $3.58                             $3.58                  $3.25             $0.33

All instalments payable under the Tourism Noosa agreement for the 2021-22 financial year have
been made. The current agreement, which was due for renewal at 30 June 2022 has been
extended for a further 12 months.
Economic Development expenditure is below budget due to lower employee costs ($105k), due
the Branch Manager acting as Director of Environment & Sustainable Development for part of the
financial year and vacancies in the branch. This has also impacted timing for delivery of initiatives
under the Local Economic Plan ($172k). The timing of the Firetech conference ($54k), which is
grant funded, has also been delayed due COVID impacts.

                                                                                                                      Page 21 of 45

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                    18 JULY 2022


Tourism and economic development activity is funded through the general rate, with 5.8% of the
annual general rate committed towards tourism and economic development. Should actual general
rate revenue fall below budget, this does not impact Council’s contractual commitment to fully fund
all tourism and economic development activity. Any general rate revenue shortfall is funded
through other general revenue sources to ensure all planned activities are undertaken in full.
Legal Cost Summary
An update on legal costs and associated expenditure is provided on a quarterly basis. Expenditure
as at 30 June 2022 is outlined below.

                          Legal Costs (inc consultancy) over time
     $2,400,000

     $2,000,000

     $1,600,000

     $1,200,000

      $800,000

      $400,000

            $0




Legal and associated costs are $321k below budget (85.2% or $1.85 million of $2.16 million of
annual budget spent). This is due largely to lower than forecast Development Assessment and
Planning costs associated which has offset legal expenses associated with the Kin Kin Quarry.
Disaster Recovery Works
To date Council has incurred $889k in cost associated with remediation works and counter disaster
operations resulting from the February 2022 flood event with a further $264k in commitments.
Erscon Consulting have been engaged to assess and quantify the damage to infrastructure and
other Council assets and once complete Council will be provided with a report outlining the works
required.
$1.4 million in disaster recovery funding has been received to date and additional funding will be
sought once assessments are completed and the program of works finalised.




                                                                                    Page 22 of 45

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                                         18 JULY 2022


Capital Revenue
FY capital revenue of $15.7 million received comprises cash contributions from developers ($2.1
million) and capital grants ($12.9 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the
timing of the receipt of developer contributions (both cash and contributed) is unpredictable. With
recent weather events and supply chain interruptions several larger projects have been delayed
and be finalised early in FY23 which the balance of associated capital grant funding to be received
on completion. This revenue will be incorporated into Budget Review 1 carryovers.
Figure 4: Capital Revenue by Type

$20.0                                         $19.0
                                                                         YTD Budget ($m)
$18.0
$16.0                                                                    YTD Actual ($m)
$14.0                                                         $12.9

$12.0
$10.0
 $8.0
 $6.0
 $4.0                                  $2.1
                $1.4                                                         $1.5
 $2.0                                                                                             $0.7
 $0.0
                       Contributions




                                                      Subsidies




                                                                                    Contributed
                                                       Grants /




                                                                                      Assets
                          Cash




Capital Program
Actual capital expenditure (excluding commitments) is $34.4 million (FY budget $48.1 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate quarterly report by Infrastructure Services.

Figure 5: Capital Program Delivery Performance

$45.0          $42.4
                                                                         YTD Budget ($m)
$40.0
                                                                         YTD Actual ($m)
$35.0                              $31.0
$30.0
$25.0
$20.0
$15.0
$10.0
                                              $4.3                $2.1
 $5.0
                                                                             $1.3             $1.3
 $0.0
                Capital works                  Other capital                Loan redemption



Cash Management and Investment Performance
Total cash on hand at the end of June was $97.5 million. Included in this balance are funds held
in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants

                                                                                                         Page 23 of 45

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                                                       18 JULY 2022


including the financial assistance grant and other capital works grants, January rates payments
received, and unspent monies committed for funding capital projects which are underway and will
continue during the financial year.
The following pie charts present the mix of cash held at June 2022 by agency (graph on the left)
and by credit risk rating (graph on the right). All funds have been invested in accordance with the
Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating



                               CBA
                               2%                                                               A1 +
                                                                                           (Commercial Banks)
                                                                                                 2%




                                                                                                     A1 +
                                QTC                                                                 (QTC)
                                98%                                                                  98%




The following chart monitors the 12 month trend on total cash and the agencies invested. Payments
received in February from bi-annual rates generated a significant increase in cash, which have and
will be invested in short term QTC deposits in line with Council’s Investment Policy. Management
are actively monitoring short term investment rates being offered by commercial institutions against
QTC’s cash rate to ensure the return on investment is maximised.
Figure 7: 12 Month Trend of Cash Invested by Agency
120,000,000



100,000,000



 80,000,000



 60,000,000



 40,000,000



 20,000,000



         -
             Jul-21   Aug-21   Sep-21   Oct-21   Nov-21 Dec-21    Jan-22   Feb-22 Mar-22   Apr-22    May-22   Jun-22

              Bendigo TD       Westpac TD         NAB TD         Suncorp TD      CBA TD        QTC          CBA Operating




                                                                                                                       Page 24 of 45

Section 25

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                18 JULY 2022


Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.

 Category                                                                                                                                                                Comments
 Operating Surplus Ratio                                                                                                                                                  Intent: Identifies the extent to which
                                       90% 82.6%                                                                                                                           revenues cover operational
                                       80%                                                                                                                                 expenses, to ensure community
                                       70%       60.9%                                                                                                                     equity is not degraded
                                       60%
                                                     44.5%                                                                                                                Target: 0 – 10%
                                       50%                               39.0%
                                       40%                30.5%               30.8%                                                                                       Result: 10.2%
                                       30%
                                                               18.3%
                                                                                   24.7%
                                                                                        20.5%                                                                             Comment: Strong sales and
                                       20%                                                   13.4%10.2%
                                                                    8.3%                                                                                                   facilities revenue, operational
                                       10%
                                                                                                                                                                           savings, unspent levies and prepaid
                                        0%
                                      -10%
                                                                                                                                                                           grants have contributed toward a
                                            Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun                                                                                positive interim annual result.
                                                           Actual                                 Budget                                   Target



 Cash Expense Cover                                                                                                                                                       Intent: Indicates how long council
                                      16.0                                                                                                                                 can continue paying its day-to-day
                                                                                                                    14.2
                                                                                                                               13.4 13.0                                   expenses from cash at bank without
  Months (Cash to Cover Operations)




                                      14.0              12.8 12.5                                                                                             13.1
                                                                                                                                                   12.4
                                                                            11.9 11.8                                                                                      needing additional cash flows
                                      12.0                                                      10.8 11.2
                                             10.4
                                                                                                                                                                          Target: > 3 months
                                      10.0
                                                                                                                                                                          Result: 13.1 months
                                       8.0
                                                                                                                                                                          Comment: Whilst interim annual
                                       6.0
                                                                                                                                                                           cash cover result is well above
                                       4.0                                                                                                                                 target, this includes committed cash
                                       2.0                                                                                                                                 for capital programs and unspent
                                        -           -         -         -         -         -         -         -          -         -         -          -          -     grant monies paid in advance.
                                              Jul       Aug       Sep       Oct       Nov       Dec       Jan       Feb        Mar       Apr       May        Jun
                                                                                                                                                                            In June 2022 the state government
                                                        Actual                                                         Minimum (>0 months)
                                                        Target (3 months)                                              Maximum (6 months)
                                                                                                                                                                            also pre-paid 4 years worth of
                                                                                                                                                                            domestic waste levy subsidies which
                                                                                                                                                                            Council is holding in reserve ($12
                                                                                                                                                                            million)
 Asset Sustainability Ratio                                                                                                                                               Intent: Measures the extent to
                       140%                                                                                                                               130.1%           which assets are being replaced as
                                                                                                                                                                           their condition degrades to ensure
                       120%
                                                                                                                                                          95.5%
                                                                                                                                                                           service potential is maintained
                       100%
                                                                                                                                                                90%
                                                                                                                                                                          Target: 90% of depreciation budget
                                                                                                                               77.0%
                                      80%                                                                                 65.4%                                            spent on renewals annually
                                      60%                                                                       47.8%
                                                                                                                     57.1%
                                                                                                                                                                          Result: Below budget
                                                                                                 36.3%
                                      40%                                    25.2%
                                                                                            30.1%                                                                         Comment: The capital works
                                                                        15.7%                                                                                              program has been impacted by
                                      20%                     7.8%
                                             0.9% 4.7%                                                                                                                     flood and rain events and this
                                       0%                                                                                                                                  together with ongoing supply chain
                                             Jul    Aug       Sep           Oct   Nov        Dec          Jan   Feb        Mar           Apr   May         Jun
                                                                                                                                                                           issues has resulted in delays in the
                                                    Actual Renewal Spend (%)                                         Target (%)
                                                                                                                                                                           delivery of the capital program.
                                                    Renewals Budget (%)
                                                                                                                                                                           Whilst under budget, the statutory
                                                                                                                                                                           target has still been met




                                                                                                                                                                                                Page 25 of 45

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                  18 JULY 2022


 Category                                                                                                                                  Comments
 Net Financial Liabilities Ratio                                                                                                            Intent: Outlines the level that net
                                                                                                                                             Council debt can be serviced by
                70%
                                                        60%                                                                                  operating revenues. A ratio below
                60%
                                                                                                                                             zero implies that liabilities are less
                50%
                                                                                                                                             than cash (and other current assets)
                40%                                                                                                                          and there is adequate borrowing
                30%                                                                                                                          capacity available if needed.
                20%                                                                                                                         Target: less than 60%
                10%
                                                                                                                                            Result: -28%
                                     0%
                                                                                                                                            Comment: Council has low debt
    -10%
                                                                                                                                             levels and sufficient cash holdings
    -20%
                                                                                       -13%                                                  which are reflected in the annual
    -30%                                                                                                                                     result.
                                                                                                                       -28%
    -40%
                                                    Target                             Budget                        YTD Actual


 Investment Return                                                                                                                          Intent: Ensure appropriate return on
                                                                                                                                             investment yield for cash at bank.
                                                                                                                                            Target: 0.25% above current
                                                                                                                                             Bloomberg commonwealth 10-year
                                                                                                                                             bond rate yield (0.58%)
                                                                                                                                            Result: 0.61%
                                                                                                                                            Comment:: While Council has
                                                                                                                                             achieved returns above the full year
                                                                                                                                             Bloomberg bond rate of 0.09%.
                                                                                                                                             With interest rates and long-term
                                                                                                                                             bond rates rising in May & June
                                                                                                                                             Council’s investment return,
                                                                                                                                             compared to the June index (0.58%)
                                                                                                                                             has started to fall behind target.
                                                                                                                                             Management are currently in the
                                                                                                                                             process of investing surplus cash
                                                                                                                                             into higher yielding products in line
                                                                                                                                             with Council’s investment policy to
                                                                                                                                             maximise returns.
 Rates in Arrears                                                                                                                           Intent: Ensuring that the amount of
                                                                                                                                             unpaid rates remains sustainable
                                          14.0%
  Percentage of Annual Rates in Arrears




                                                                                                       11.7%                                 and does not negatively impact cash
                                          12.0%                                                                                              flows
                                                                10.2%                                          9.9%
                                          10.0%                                                                                             Target: 5% industry benchmark
                                           8.0%                         7.3%
                                                                               6.5% 6.0%
                                                                                                                      7.1%
                                                                                                                             6.3%
                                                                                                                                            Result: 5.83%
                                                                                                5.8%                                5.8%
                                           6.0%   5.2%
                                                         4.6%
                                                                                                                                            Comment: Rates arrears are in line
                                                                                                                                             with performance for the previous 6
                                           4.0%
                                                                                                                                             and 12 monthly cycles. Where
                                           2.0%                                                                                              appropriate recovery action will be
                                           0.0%                                                                                              taken.
                                                  Jul    Aug    Sep     Oct     Nov     Dec     Jan     Feb    Mar    Apr May       Jun

                                                                              Actual             Target




Previous Council Consideration
Nil.
Finance
As above.

                                                                                                                                                                  Page 26 of 45

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                             18 JULY 2022


Risks & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks Council uses various tools which include
monthly ongoing financial reporting to identify and address emerging issues, conservative
budgeting, compliance with the Financial Sustainability Policy, regular budget reviews, effective
liquidity management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and
Restricted Cash policy which requires that Council maintains both a disaster management reserve
and a minimum 3 months cash cover to fund emergent matters.
Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
        Substantial damage to or failure of Council infrastructure due to natural disaster or other
         emergent issue that may require significant unplanned investment;
        Closure of Council facilities due to ongoing Covid 19 restrictions;
        A prolonged IT system failure affecting Council’s ability to deliver services or issue rates
         notices;
        Economic conditions affecting ratepayers’ ability to pay rates;
        Market driven increases in construction and operational costs significantly above estimates;
        Labour and material shortages and delays.
Given the recent flooding event, assessments are currently underway to assess what impact this
may have on Council’s financial position and what disaster funding opportunities may available to
offset this expenditure.

Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments/Sections Consulted:
    X   Chief Executive Officer   X   Community Services                      X   Corporate Services
        Executive Support             Director                                X   Director
                                      Community Development                   X   Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

    X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
        Director                      Director                                    Director
        Community Engagement          Building & Plumbing Services                Asset Management
        Customer Service              Development Assessment                      Buildings and Facilities
        Governance                    Economic Development                        Civil Operations
        People and Culture            Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 27 of 45

Section 28

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022


                                    Attachment 1




                                   Page 28 of 45

GENERAL COMMITTEE MEETING AGENDA                                                                         18 JULY 2022

                                                                                                          Attachment 1

     Profit and Loss Statement
     Revenue
        Recurrent Revenue
        Rates, levies and charges                         74.704         74,704         74,045            162       100%
       Fees and charges                                    8.246         8.246          8,859             612       107%
       Interest received                                    670            670            796             125      119%
       Sale of Goods and major services                   11,084         11,084         12,944          1,850      117%
       Sale of contract and recoverable works                 23             2               8           (15)       33%
        Rental & lease income                              1,885          1,885          1,821           (64)       o7%
       Other income                                        1,244          1,244           905           (248)       80%
        Grants, subsidies, contributions and donations     5,825         5,825           8,434         2,508       142%
       Unitywater Distributions                            5,650          5,650         5,650               -      100%.
                                                         109,530        109,530        114,450         4,320       104%
     Expenses
        Recurrent Expenses
        Employee benefits                                 33134         38,134          37,174           960        or%
       Materials and services                             51,001         51,081         47,310         3,780        oo%
       Finance costs                                       1.114          1,114          1,146           (32)       103%
       Depreciation                                       19,589         19,589         19,509           (10)       100%
       Other expenses                                       233           233             241              2]       103%
                                                         110.161        110,161        105,470          4631        96%
    Operating Result                                                                       BO
     Summary of Capital Expenditure and Funding
     Capital Funding
        Capital cash contributions and infrastructure charges 1,397       1,307          2,006           6a0        150%
       Contributed assets                                  1,500          1,500           688           (812)       46%
        Capital grants and subsidies                      18,963         18,963         12,034        (6,030)       68%
        Cash / revenue                                    22.860        27,718          20,540        (7,178)       20%
        New loan borrowings                                4850               -              -              -       o%
       Other capital revenue                                   -              -              -              -       o%
   Total Capital Funding:                                   STS            STS          SSSA
     Capital Expenditure
        Contributed assets                                 1,500          1,500           688           (812)       46%
        Capital works - constructed assets               42.440         42,440          31,005        (11,435)      73%
        Capital works - other capital                      4342           4,342         2,138         (2,206)       40%
        Loan redemption                                    1297           1,287          1,207              -       100%
        oi Capital Ex endure                                   -              -          1,131          1,131      o%

                                                                                                         Page 28 of 45

Section 29

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022


                                    Attachment 2




                                   Page 29 of 45

GENERAL COMMITTEE MEETING AGENDA                                                            18 JULY 2022

                                                                                             Attachment 2

     Current Assets
           Cash and cash equivalents                           65,875            92,510            68,895
           Trade and other receivables                          10,286            8,219             7,467
          Inventories                                             144               150               144
          Contract Assets                                            -             487                487
           Other current assets                                  3,425            4.887             4.955
                                                               79,730           106,252            81,948
           Non Current Assets held for sale                          -                -                 -
     Total Current Assets                                      79,730           106,252            81,948
     Non Current Assets
           Trade and other receivables                         53,761            49.468            49 468
           Other non current Assets                                  -                -                 -
          Investments                                          88,040           92.434             92,434
          Investment property                                    3,000            2,900             2,900
           Property, plant and equipment                     999,038           966,020            952,579
           Right of Use Assets                                    89                89                 89
           Intangible assets                                     2,925            2,653             3,036
     Total Non Current Assets                                1,146,853         1,113,564         1,100,506
    TotalAssets                                             4,226,584          1,219,816        1,182,454
     Current Liabilities
           Trade and other payables                              7,334           11,758            10,468
           Contract Liabilities                                 4,377             4.377             4377
          Borrowings                                              946               184               955
           Lease Liablities                                        2                25                 25
          Provisions                                             8,103            5,256             4947
          Other                                                  3,998           15,779             2,898
     Total Current Liabilities                                 24,783            37,378            23,669
     Non Current Liabilities
          Borrowings                                           24,390           20,258             20,258
           Lease Liabilities                                       66               66                 66
          Provisions                                            16,555           16,555            16,555
     Total Non Current Liabilities                             41,011           36,879             36,879
    TotalLiabilities |                                         65,794             4 25T            60,54

     Community Equity
           Asset Revaluation Surplus                          126,129           108,561           108,473
           Retained Surplus / (Defeciency)                           -                -                 -
           Shire Capital                                     1,034,661         1,013,432          999,512
           Current Year Net uty                                      -           5559              7,905

                                                                                            Page 29 of 45

Section 30

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022


                                    Attachment 3




                                   Page 30 of 45

GENERAL COMMITTEE MEETING AGENDA                                                                      18 JULY 2022

                                                                                                       Attachment 3

     Cash flows from operating activities

          Receipts from Customers                                            04,649            116,243            93,975
          Payments to Suppliers and Employees                               (90,066)          (90,018)           (84,528)
                                                                              4,582           26,225               9.447
          Investment and Interest Revenue Received                            3.270             3,385              3.401
          Rental Income                                                        1,873             1,821             1,365
          Non Capital Grants and Contributions                                5,887             8434               6,085
          Income Tax Equivalent Received                                       1,200             1,450             1,450
          Income from Equity investments                                       1,850             1,600             1,600
          Payments:
          Borrowing Costs                                                         -                 -             (2,499)
          Interest Expense                                                     (516)             (153)              (131)
         Net Cash InflowOutfiow) from Operating Activities ==                48.146          ATT                 20.719
     Cash Flows from Investing Activities

         Proceeds of Sale of Property, Plant and Equipment                        -              256                217
          Grants, Subsidies, Contributions and Donations                     20,360             15,029            13,679
          Payments:
          Payments of Property, Plant and Equipment                          (45,953)         (32,711)           (22,721)
          Payments for Intangible Assets                                       (829)             (557)            (1,385)
          Net Movement in Loans and Advances                                      -               125                125
         Net Cash InflowOutfiow) from Investing Activities ==               (26.422)          (17.858)          (10,085)
     Cash Flows from Financing Activities

         Proceeds from Borrowings                                             4,859                 -              2,500
          Payments:
          Repayment of Borrowings                                             (736)             (1,288)           (1,263)
         Net Cash Inflowi{Outfiow) from Financing Activities =                 NZS             (4.299)             0.287
         Net Increasel{Decrease) in Cash andCashEquivalentsheld =            (4.153)           23.615            10.871
         Cash and Cash Equivalents at the beginning of the reporting period  70,028            68,894             57,023

                                                                                                      Page 30 of 45

Section 31

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022




                                   Page 31 of 45

GENERAL COMMITTEE MEETING AGENDA                                                                         18 JULY 2022

        Materials and services
       Advertising and Marketing                           227            27            241            (15)      107%
       Administration Supplies and Consumables             Ti            751            5a4            166       78%
       Audit Expenditure                                    174           174           170              4       or
        ‘Communications and IT                              os           6a4             909          (225)      133%
        Commission Paid                                   1,218          1,218         1,448          (230)      119%
       Consultancy Services                               1,279          1,278         1,393          (114)      108%
       Contract Services                                24.287         24,287         23,325           063       28%
        Contributions, Donations, Sponsorship and Przes   3.471          3471          3,532          (61)       102%
       Bectricity                                         1,729          1,728         1,651           78        o%
        intemal Fleet Costs and External Plant Hire       1,668          1,668         1,826          (258)      116%
        Grants Paid to Community Organisations            1,839          1,932         1,357          582        70%
       Insurance                                           703           703            688             15       o8%
        Legal Expenses                                    1,886          1,866         1,578          288        85%
        Operating Leases and Rentals                        302           302           326           (24)       108%
       Software and Maintenance                          2.166          2,166          1,780           376       8%
        Subscriptions and Registrations                    369           368            362              7       o8%
       Waste Levy Payments                                1,460          1460          1,634          (175)      112%
       Water and Sewerage Charges                         1,080          1,090          850            240       78%
       All Other Materials and Services                   5.708          5708          3,546         2.162       62%
                                                          1,031        31,091        47,310           3,780      93%

                                                                                                         Page 31 of 45

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                       18 JULY 2022


8     APPOINTMENT OF PLANNING & ENVIRONMENT COMMITTEE CHAIR
Author            Chief Executive Officer, Scott Waters
                  CEO’s Office

Index             ECM/ Subject / Council Meetings General

Attachments       Nil

EXECUTIVE SUMMARY
At the Ordinary Meeting dated 30 April 2020, Cr Stockwell was appointed as Chairperson for the
Planning and Environment Committee. Due to personal commitments, Cr Stockwell has requested
to stand down as the Chair due to personal work commitments and accordingly, a new chair must
be appointed.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 18 July 2022 and appoint Cr < > as the Chairperson for the Planning and Environment
Committee.

REPORT
The Local Government Regulation 2012 provides that a Council may appoint from its Councillors,
standing committees or special committees to assist it to deal with matters. The Planning and
Environment Committee (P&E), is one of the committees established by Noosa Council during this
current term of Council. The P&E is held on the Tuesday morning prior to the week of the General
Committee Meeting and the Ordinary Meeting, commencing at 9.30am.
In relation to the conduct of Standing Committees, section 267 of the Local Government Regulation
2012, states that a local government may appoint a chairperson of each Committee or alternatively,
the Committee may appoint a chairperson if the Council does not make such an appointment. Cr
Brian Stockwell was appointed as Chairperson at Council’s Ordinary Meeting dated 30 April 2020.
Cr Stockwell advised on the 24 June 2022 that, due to his recent personal commitment as a course
coordinator at the University of the Sunshine Coast, he will no longer be available from 11am on
Tuesday mornings and has accordingly suggested that he stand down as the Chair of the Planning
and Environment Committee. Cr Stockwell has requested to remain as a Committee member of
the Planning and Environment Committee.
As a result of Cr Stockwell’s request to stand down as Chair, it is proposed that one of the other
existing committee members of the Planning and Environment Committee be appointed as Chair
and that Cr Stockwell remain on this committee.
The rotation of Committee Chairs for General Committee as well as the Services & Organisation
Committee will occur over the coming months.
Previous Council Consideration
Ordinary Meeting Minutes, 30 April 2020, Item 6, Page 8
That Council note the report by the Chief Executive Officer to the Ordinary Meeting dated 30 April 2020
regarding the Council meeting structure and timetable for the remainder of 2020 and:
A.    Approve the re-establishment of the Planning and Environment Committee, the Services and
      Organisation Committee, and the General Committee as Standing Committees under section 264
      of the Local Government Regulation 2012, with the relevant roles and responsibilities identified
      in the Chief Executive Officer’s report;
B.    Appoint the following Councillors to each of the Committees:
          Planning and Environment Committee

                                                                                       Page 32 of 45

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                         18 JULY 2022


               Mayor Stewart
               Councillor Stockwell
               Councillor Wegener
               Councillor Finzel
              Services and Organisation Committee
               Mayor Stewart
               Councillor Jurisevic
               Councillor Lorentson
               Councillor Wilkie
              General Committee
               The Mayor and all Councillors
C.      Appoint the following Chairpersons to the Standing Committees:
              General Committee – Councillor Wilkie
              Planning and Environment Committee – Councillor Stockwell
              Services and Organisation Committee – Councillor Jurisevic
D.      Note that Council can amend its decision-making structure, membership of Committees or
        Chairpersons of Committees as it requires, by resolution, from time to time;
E.      Adopt the times and dates of future meetings of the Council and Committees in accordance with
        the Meeting Calendar 2020 shown at Attachment 1 to the report, with meetings to be held at the
        Council Chambers at Tewantin unless otherwise determined by Council; and
F.      Note that due to the COVID-19 Pandemic, Ordinary Meetings, Special Meetings and Standing
        Committee meetings can be held by teleconference / video-conference and undertaken without
        the public present if required on the basis that Council and Committee meetings can be
        livestreamed.
Finance
Provision exists within the budget to meet any expenses associated with the conduct of Council
meetings. There is no financial cost associated with the change in the Chair
Risks & Opportunities
Meetings are the principal decision-making forum for local governments and all decisions are made
at the Ordinary meeting with Committee meetings making recommendations to Council.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
P&E Committee members advised.
Departments/Sections Consulted:
 x     Chief Executive Officer        Community Services                      Corporate Services
       Executive Support              Director                                Director
                                      Community Development                   Financial Services
                                      Community Facilities                    Fleet
                                      Libraries & Galleries                   ICT
                                      Local Laws                              Procurement
                                      Waste & Environmental Health            Property
                                                                              Revenue Services
       Executive Services             Environment & Sustainable Development   Infrastructure Services
       Director                       Director                                Director
       Community Engagement           Building & Plumbing Services            Asset Management
       Customer Service               Development Assessment                  Buildings and Facilities
       Governance                     Economic Development                    Civil Operations
       People and Culture             Environmental Services                  Disaster Management
                                      Strategic Land Use Planning             Infrastructure Planning,
                                                                              Design and Delivery


                                                                                         Page 33 of 45

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                     18 JULY 2022


9    2022 LGAQ ANNUAL CONFERENCE MOTIONS – NOOSA COUNCIL

Author           Chief Executive Officer, Scott Waters
                 CEO’s Office

Index            ECM/ Subject / LGAQ

Attachments      1.    Motion A - 2022 LGAQ Annual Conference – Motions Template –
                       Environmental Agreements
                 2.    Motion B - 2022 LGAQ Annual Conference – Motions Template –
                       Climate Action in Planning Schemes
                 3.    Motion C - 2022 LGAQ Annual Conference – Motions Template –
                       Energy Efficiency Update in NCC 2022

EXECUTIVE SUMMARY
The Local Government Queensland Conference is held annually and provides a forum for all
Queensland Councils to come together to table and debate contemporary issues of importance to
their local areas and communities as well as identify issues that are likely to be relevant to other
local Councils.

This report proposes Noosa Council put forward motions for consideration at the LGAQ conference
to seek support from other Councils to advocate for the required legislative changes.
RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 18 July 2022 and approve the submission of the following motions to the Local Government
Association of Queensland (LGAQ) Annual Conference 2022 for consideration and debate:
A.   “That the LGAQ calls on the State Government to make changes to the relevant legislation
     being the Local Government Act 2009 and the City of Brisbane Act 2010 that would enable
     Local Governments to offer Environmental Upgrade Agreements throughout Queensland.”
B.   “That the LGAQ calls on the State Government to abandon their position that prevents
     Council’s from codifying requirements for energy efficiency, solar power and other emissions
     reduction and adaptation provisions relevant to new development in their Planning
     Schemes.”
C.   “That the LGAQ calls on the State and Federal government to approve the Australian Building
     Codes Board’s recommended updated energy provisions for new homes, at the next Building
     Ministers Forum.”

REPORT
MOTION A - Environmental Upgrade Agreements – Anne Nolan, Carbon Reduction Officer
“That the LGAQ calls on the State Government to make changes to the relevant legislation being
the Local Government Act 2009 and the City of Brisbane Act 2010 that would enable Local
Governments to offer Environmental Upgrade Agreements throughout Queensland.”
Background
An Environmental Upgrade Agreement (EUA) is an economic development tool to support and
incentivise businesses and residents to undertake environmental upgrades.
An environmental upgrade is an addition or modification to an existing building to improve its
energy and water efficiency; add renewable energy infrastructure; reduce greenhouse gas
emissions; prevent or reduce pollution; reduce the use of materials; recover or recycle materials,

                                                                                     Page 34 of 45

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                       18 JULY 2022


monitor any environmental performance, or encourage alternatives to fossil fuel vehicle use.
Environmental upgrades also include improving the buildings resilience to climate change impacts.
An EUA is an agreement where a building owner borrows money for environmental building
upgrades from a financier and makes the repayments through the local council rates system.
These repayments are known as an Environmental Upgrade Charge. Essentially, an EUA is a
loan for implementing building efficiency, climate resilience and overall sustainability improvements
that is repaid through its council rates over periods of up to 20 years. Council’s involvement in this
process ensures that the loan is highly secure, and the lender will provide better terms.
Environmental Upgrade Agreements were established by the City of Melbourne in 2002 through
its Sustainable Melbourne Fund to encourage investment in sustainable buildings. EUAs were first
offered by the City of Melbourne under the City of Melbourne Act. The Victorian Local Government
Act (1989) was then amended in 2015 so that all Victorian councils can offer EUAs. EUAs are now
offered in Victoria, New South Wales, and South Australia, with over 40 participating councils.
Initially EUA’s were available to commercial and industrial properties however Victoria has recently
amended its Local Government Act again to extend EUAs to residential properties and to include
improvements that will assist with climate change adaptation.
It is not mandatory for councils to offer EUAs once the legislation allows for it. Each individual
council can decide to offer business and residents EUAs in accordance with their own strategies
and priorities.
EUAs are not yet offered in Queensland and require a legislative amendment to the Local
Government Act 2009 and the City of Brisbane Act 2010 to enable Councils to offer EUAs to
residents and businesses.
How EUAs Operate
Where EUAs have been enabled (Vic, SA and NSW), the process of an Environmental Upgrade
Agreement is as follows:
a.    A building owner agrees to carry out environmental upgrade works in respect of a building to
      improve the energy, water or environmental efficiency of the building or improve climate
      resilience. The building owner can ask the tenants to contribute or cover the cost of the
      upgrades through the savings made on their energy bills and running costs;
b.    A finance provider agrees to advance funds to the building owner to finance those
      environmental upgrade works; and
c.    The Council agrees to levy a charge on the relevant land for the purpose of repaying the loan
      to the finance provider;
d.    The building owner repays the loan through the Council rates;
e.    Council repays the finance provider.




                          Figure 1: How Environmental Upgrade Agreements work

                                                                                      Page 35 of 45

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                    18 JULY 2022


Legislative Changes required to enable EUAs in Queensland
Under current arrangements Queensland councils may provide finance to a business or community
organisation or provide a guarantee to a private sector lender on behalf of a business or community
organisation. Such arrangements require the Treasurer’s approval under the Statutory Bodies
Financial Arrangements Act 1982 (SBFA Act). However, the Local Government Act 2009 (LG Act)
specifically prohibits providing a loan to, or a guarantee on behalf of, individuals.
Amendments would be required to the Local Government Act 2009 to allow the equivalent of the
Victorian scheme to operate in Queensland.
To enable EUAs to be offered in Queensland, two pieces of legislation need to be changed:
1.    Local Government Act 2009 to enable the equivalent of the interstate schemes to operate in
      Queensland;
2.    the City of Brisbane Act 2010.
In the event that such amendments were made, individual councils would then need to take up
such an option based on their own policy and financial objectives and arrangements.
Previous Council Consideration
Nil
Finance
Nil associated directly with this report as it is purely seeking consideration of a potential LGAQ
motion and advocacy for legislative change.
Risks & Opportunities
There are numerous opportunities and risks resulting from councils offering EUAs which would
need to be considered in detail should the legislative change occur to enable them to be offered in
Queensland. These would be subject to future reports and consideration.
There is not considered any risk with Council advocating for legislative change to enable EUA’s to
be offered in Queensland should councils wish to take up the option.
Consultation
External Consultation - Community & Stakeholder
Zero Emissions Noosa Inc.
Officers from Maribyrnong Council
Officers from City of Melbourne
Building Better Finance
Sustainable Melbourne Fund
Internal Consultation
Executive Team and relevant staff.

MOTION B – CLIMATE ACTION IN PLANNING SCHEMES – Cr Brian Stockwell
“That the LGAQ calls on the State Government to abandon their position that prevents Council’s
from codifying requirements for energy efficiency, solar power and other emissions reduction and
adaptation provisions relevant to new development in their Planning Schemes.”
Background
It has been advised that the state planning department is currently of the view that planning
schemes can’t include provisions on matters otherwise dealt with in the National Construction
Code. However, other states covered by the same code regularly include such provisions in their
statutory plans.
The advised current position of the Department is working against communities who have set

                                                                                    Page 36 of 45

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                       18 JULY 2022


ambitious targets for emissions reduction and is a constraint to local governments playing their
part in in achieving the targets in the Paris Agreement.
There are many aspects of building design, setbacks etc. covered by planning schemes, the
current prohibition by state planners to codifying requirements for new development as part of local
climate action appears arbitrary and potentially responding to ill-informed advocacy of some in the
development industry.
There is a current proposal to increase the minimum standards within the National Construction
Code, but regardless of whether this proposal is adopted or not there is a fundamental principle
that planning schemes should reflect the aspirations of the community.
Previous Council Consideration
Nil
Finance
Nil associated directly - seeking consideration of a potential LGAQ motion and advocacy for
legislative change.
Risks & Opportunities
The minimum standards of the National Construction Code are implemented and future homes
reflect the aspirations of the community.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Previous Planning Scheme submissions

MOTION C – Energy Efficiency Update in NCC – Cr Brian Stockwell
“That the LGAQ calls on the State and Federal government to approve the Australian Building
Codes Board’s recommended updated energy provisions for new homes, at the next Building
Ministers Forum.”
Background
The National Construction Code sets the rules for how new homes are built in Australia. There is
a draft proposal to lift minimum energy efficiency ratings for new homes, and to require solar and/or
efficient appliances.
The updated energy provisions proposed for the 2022 edition of the National Construction Code
follow a collaborative 3-year process led by the Australian Building Codes Board (ABCB).
Better performing homes mean lower energy bills, healthy, resilient and safe homes for Australians
and an easy and low-cost way to meet Australia’s commitment to achieve net zero emissions by
2050.
Climateworks Centre and ASBEC have calculated lifting standards would result in up to 15 million
tonnes of emissions reductions by 2030.
The proposed increase is achievable, cost-effective and financially beneficial to residents.
Australia’s 10 million residential buildings are responsible for around 24% of overall electricity use
and 12% of total carbon emissions nationally. Increasing the energy performance of new homes is
a quick and easy way to achieve our net-zero targets.
It has been 12 years since the minimum standard was increased. In that time industry and
technologies have greatly improved to build homes that are healthier, more energy efficient and
resilient.

                                                                                      Page 37 of 45

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                           18 JULY 2022


Previous Council Consideration
Noosa Council has previously joined other councils from around Australia as part of our
membership of Climate Emergency Australia (CEA) in calling on this outcome. CEA is part of a
coalition of peak bodies and organisations (including ACOSS, Energy Consumers Australia,
ASBEC, Climate Council, Energy Efficiency Council, Property Council, and Renew) collaborating
on a shared statement to back higher energy standards for new homes. Council has also directly
written to The Australian Building Codes Board in October 2021 providing a submission on the
NCC 2022.
Finance
Nil associated directly - seeking consideration of a potential LGAQ motion and advocacy for
legislative change.
Risks & Opportunities
The proposal is consistent with our Climate Response Plan.
Queensland communities have the ability to determine the pace of their transition to a low carbon
economy, and if desired include provisions within their Planning schemes that may exceed the
statutory minimum requirements of the National Construction Code.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Project Co-ordinator - Climate Change Adaption
Departments/Sections Consulted:

 X    Chief Executive Officer   X   Community Services                      X   Corporate Services
      Executive Support             Director                                    Director
                                    Community Development                       Financial Services
                                    Community Facilities                        Fleet
                                    Libraries & Galleries                       ICT
                                    Local Laws                                  Procurement
                                    Waste & Environmental Health                Property
                                                                                Revenue Services

 X    Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
      Director                      Director                                    Director
      Community Engagement          Building & Plumbing Services                Asset Management
      Customer Service              Development Assessment                      Buildings and Facilities
      Governance                    Economic Development                        Civil Operations
      People and Culture            Environmental Services                      Disaster Management
                                    Strategic Land Use Planning                 Infrastructure Planning,
                                                                                Design and Delivery




                                                                                           Page 38 of 45

Section 39

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022


                                    Attachment 1




                                   Page 39 of 45

GENERAL COMMITTEE MEETING AGENDA                                                           18 JULY 2022

                                                                                            Attachment 1

                                                                                Every Queensland
                                                              Li        Q       community deserves
                                                                            ;   to be a liveable one

         2022 LGAQ Annual Conference — Motions template
         Please use this template to prepare and submit your motion using the link below.
        Please use text only — no images or tables.
          Who is the key contact for this motion? | Scott Waters
          (required)
          Do you have a contact at the LGAQ for    Crystal Baker
          this motion?
          (optional)
          Submitting council (required)
          Supporting organisation (fappicable) |
                  eee                                                                  ee
          Date of council resolution               21/07/2022
          (required)

          0 Does this motion have state-wide relevance? (This is a required field)
          Yes

          Title of motion (required)               Environmental Upgrades Agreements

          Motion                                   The LGAQ calls on the State Government to
          (required)                               make the changes to the relevant legislation that
                                                   would allow Environmental Upgrade Agreements
                                                   to be offered in Queensland.
          What is the desired outcome sought?      The Queensland Local Government Act 2009 and
          (required) 200 word limit               the City of Brisbane Act 2010 are amended to
                                                   enable Local Councils across Queensland to offer
                                                   Environmental Upgrade Agreements (EUAs) to

          Background                              An environmental upgrade is an addition or
          (required) 350 word limit               modification to an existing building to improve its
                                                  sustainability performance such as energy
                                                   efficiency, pollution control, renewable energy
                                                   installation or improving resilience to climate
                                                   change impacts.
                                                   An Environmental Upgrade Agreement (EUA) is
                                                   an economic development tool to support and
                                                   incentivise businesses and residents to undertake
                                                   environmental upgrades. EUAs are essentially
                                                   loans for up to 20 years to undertake such works.
                                                  The loan is tied to the property, not to the
                                                   individual. Council's involvement in this process

                                                                                          Page 39 of 45

Section 40

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022




                                   Page 40 of 45

GENERAL COMMITTEE MEETING AGENDA                                                           18 JULY 2022

               2                                                                            J   :
                                                                              LOCAL GOVERNMENT ASDOCIATION
                                                                                   oF Quien Ae

                                                      ensures that the loan is highly secure, and the
                                                      lender will provide better terms
                                                      In an EUA, the building owner borrows money for
                                                      environmental building upgrades from a financier
                                                      and makes the repayments through the local
                                                      council rates system. Council then passes on the
                                                      repayments to the financier.
                                                      The financier undertakes all due diligence and
                                                      risk management process as part of the lending
                                                     process. The EUA is agreed and executed by the
                                                      Councils are not liable for any failure by an owner
                                                     to repay as the debt liability remains with the
                                                      property.
                                                      EUAs are now offered in Victoria, NSW and SA
                                                      These states amended their respective Local
                                                      Goverment legislation to enable local Councils to
                                                     offer EUAs. Councils can choose to offer EUAs,
                                                      however it is not mandatory.
                                                      EUAs provide numerous benefits including local
                                                      investment, providing local jobs, reducing
                                                      greenhouse gases and improving building stock.
                                                      EUAs stimulate economic activity and business
                                                      community. EUAs can work with any
                                                      grants/subsidies available for projects through
                                                      local, state or federal goverment departments to
                                                      enhance the business case for a building retrofit.
                                                      To enable the introduction of EUA’s in Queensland
                                                      an  amendment    is  required to  the   Local
                                                      Govemment Act 2009 and the City of Brisbane Act
                                                      2010.
                                                      Legislative Changes required to enable EUAs
                                                      in Queensland
                                                      Under current arrangements Queensland Councils
                                                      may provide finance to a business or community
                                                      organisation or provide a guarantee to a private
                                                      sector lender on behalf of a business or community
                                                      organisation. Such arrangements require the
                                                      Treasurers approval under the Statutory Bodies
                                                      Financial Arrangements Act 1982 (SBFA Act).

                                                                                                Tuy 2
                                                                                          Wilson Crawley

                                                                                           Page 40 of 45

Section 41

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022




                                   Page 41 of 45

GENERAL COMMITTEE MEETING AGENDA                                                          18 JULY 2022

              3                                                                            J

                                                     However, the Local Government Act 2009 (LG Act)
                                                    specifically prohibits providing a loan to, or a
                                                    guarantee on behalf of, individuals.
                                                    Amendments would be required to the Local
                                                     Govemment Act 2009 to allow the equivalent of the
                                                    Victorian scheme to operate in Queensland.
                                                    To enable EUAs to be offered in Queensland, two
                                                    pieces of legislation need to be changed:
                                                              1. Local Government Act 2009 to
                                                             enable the equivalent of the interstate
                                                              schemes to operate in Queensland
                                                              2. the City of Bnsbane Act 2010
                                                     In the event that such amendments were made,
                                                     individual Council's would then consider whether to
                                                    take up such an option based on their own policy
                                                    and financial objectives and arrangements

                                                                                              July 2
                                                                                         Wilson Crawley
            ,                  PTT                                             FUT,
         TELL                  HELE                                       HH      i

                                                                                          Page 41 of 45

Section 42

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022


                                    Attachment 2




                                   Page 42 of 45

GENERAL COMMITTEE MEETING AGENDA                                                               18 JULY 2022

                                                                                                Attachment 2

                                                                                      Every Queensiand
                                                                             Q        community deserves
                                                                                      to be a liveable one

            2022 LGAQ Annual Conference — Motions template
           Please use this template to prepare and submit your motion using the link below.
            Please use text only — no images or tables.
             Who is the key contact for this motion? | Scott Waters, CEO
             (required)
             Do you have a contact at the LGAQ for
             this motion?
             (optional)
             Submitting council (requred)            [Noosa Counc
             Supporting organisation (if applicable) |
             oe

             Date of council resolution                 21/07/2022
             (required)

             UO Does this motion have state-wide relevance?
             Yes

             Title of motion (required)                 Climate Action in Planning Schemes

             Motion                                     The LGAQ calls on the State government
             (required)                                 to abandon their position that prevents
                                                        Council's from codifying requirements for
                                                        energy efficiency, solar power and other
                                                        emissions reduction and adaptation
                                                        provisions relevant to new development
                                                        in their Planning Schemes.
             What is the desired outcome sought?        Queensland communities have the ability
             (required) 200 word limit                  to determine the pace of their transition
                                                        to a low carbon economy, and if desired
                                                        include provisions within their Planning
                                                        schemes that may exceed the statutory
                                                        minimum requirements of the National
                                                        Construction Code.
             Background                                 The state planning department currently
             (required) 350 word limit                  is of the view that planning schemes
                                                        can't include provisions on matters
                                                        otherwise dealt with in the National
                                                        Construction Code. However, other
                                                        states covered by the same code
                                                        regularly include such provisions in their
                                                        statutory plans.

                                                                                              Page 42 of 45

Section 43

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022




                                   Page 43 of 45

GENERAL COMMITTEE MEETING AGENDA                                                                 18 JULY 2022

                                                                                LOCAL GOVERMVENT ADDOCIATION
                                                                                     OF Qi hen AMG

                                                      The current position of the Department is
                                                      working against communities who have
                                                      set ambitious targets for emissions
                                                      reduction and is a constraint to local
                                                      govemments playing their part in in
                                                      achieving the targets in the Paris
                                                      Agreement.
                                                      There are many aspects of building
                                                      design, setbacks etc covered by planning
                                                      schemes, the current prohibition by state
                                                      planners to codifying requirements for
                                                      new development as part of local climate
                                                      action appears arbitrary and potentially
                                                      responding to ill-informed advocacy of
                                                      some in the development industry.
                                                      There is a current proposal to increase
                                                      the minimum standards within the
                                                      National Construction Code, but
                                                      regardless of whether this proposal is
                                                      adopted or not there is a fundamental
                                                      principle that planning schemes should
                                                      reflect the aspirations of the community.

                                                                                                  July 22
                                                                                             Wilson Crawley

                                                                                                 Page 43 of 45

Section 44

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022


                                    Attachment 3




                                   Page 44 of 45

GENERAL COMMITTEE MEETING AGENDA                                                                          18 JULY 2022

                                                                                                           Attachment 3

                                                                                    Every Queensiand
                                                                           Q        community deserves
                                                                                    to be a liveable one

            2022 LGAQ Annual Conference — Motions template
           Please use this template to prepare and submit your motion using the link below.
            Please use text only — no umages or tables.

             Who is the key contact for this motion? | Scott Waters, CEO
             (required)
            Do you have a contact at the LGAQ for
             this motion?
             (optional)
             Submitting council (equied)
             Supporting organisation   applicable) |
             —                                    So                                                  =
             Date of council resolution               Please select the date of resolution here
             (required)

             Title of motion (required)               Support for stronger energy performance
                                                      standards in the NCC for new homes to
                                                      cut cost of living and reduce emissions.
             Motion                                   The LGAQ calls on the State and
             (required)                               Federal government to approve the
                                                      Australian Building Codes Board's
                                                      recommended updated energy
                                                      provisions for new homes, at the next
                                                      Building Ministers Forum.

             What is the desired outcome sought?      The State and Federal Governments to
             (required) 200 word limit                support and enact the necessary
                                                      regulatory changes to implement the
                                                      current proposal to increase minimum
                                                      energy efficiency requirements in the
                                                      National Construction Code. The
                                                      changes would cut household bills,
                                                      improve climate adaptation, and make
                                                      the broader transition to renewables
                                                      cheaper and faster.
             Background
             (required) 350 word limit                The National Construction Code sets the
                                                      rules for how new homes are built in
                                                      Australia. There is a draft proposal to lift
                                                      minimum energy efficiency ratings for

                                                                                                          Page 44 of 45

Section 45

GENERAL COMMITTEE MEETING AGENDA   18 JULY 2022




7.   CLOSED SESSION

     Nil.


                                   Page 45 of 45

GENERAL COMMITTEE MEETING AGENDA                                                                                18 JULY 2022

                                                                                  LOK A nee AARC ATION

                                                        new homes, and to require solar and/or
                                                        efficient appliances.
                                                        The updated energy provisions proposed
                                                        for the 2022 edition of the National
                                                        Construction Code follow a collaborative
                                                        3-year process led by the Australian
                                                        Building Codes Board (ABCB).
                                                        Better performing homes mean lower
                                                        energy bills, healthy, resilient and safe
                                                        homes for Australians and an easy and
                                                        low-cost way to meet Australia’s
                                                        commitment to achieve net zero
                                                        emissions by 2050.
                                                        Climateworks Centre and ASBEC have
                                                        calculated lifting standards would result
                                                        in up to 15 million tonnes of emissions
                                                        reductions by 2030.
                                                        The proposed increase is achievable,
                                                        cost-effective and financially beneficial to
                                                        residents.

                                                        Australia's 10 million residential buildings
                                                        are responsible for around 24% of overall
                                                        electricity use and 12% of total carbon
                                                        emissions nationally. Increasing the
                                                        energy performance of new homes is a
                                                        quick and easy way to achieve our net-
                                                        zero targets.
                                                        It has been 12 years since the minimum
                                                        standard was increased. In that time
                                                        industry and technologies have greatly
                                                        improved to build homes that are
                                                        healthier, more energy efficient and
                                                        resilient.

                                                                                                    July 22
                                                                                              Wilson Crawicy

7.      CLOSED SESSION

        Nil.

                                                                                                                Page 45 of 45

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.