Skip to the record
Every meeting, every word.

Council archive · source document

09/0768 - Approved Plans (Preliminary Approval) [As Published] · 142009.768

of 4

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
{

LEGEND
I

 

 

 

IHS, ——'!——~-——_ SEDIMENT FENCE
Cs

1

——1sFW]+-—-—_ SEDIMENT FENCE WEIR

}

>» —» —» ——> TEMPORARY DIVERSION DRAIN

f STABILISED ENTRY/EXIT POINT

eee

eZ ZED CONFINED WASTE DISPOSAL AREA
Les

mst
> WATER QUALITY MONITORING STATION

              

$
€

<_< <—

    

PROPOSED

*
=

 

DUPLEX “4 %
N fis |
ee rl SEDIMENT AND EROSION CONTROL NOTES
a x | :
é, a x “gy 1, THE PROJECT SEDIMENT AND EROSION CONTROL DRAWINGS ARE TO BE READ IN CONJUNCTION
ae Ca WITH THE SITE'S APPROVED STORMWATER MANAGEMENT PLAN,

2 CONSTRUCTION IS TO BE PROGRAMMED TO PROVIDE INSTALLATION OF PERIMETER
LANDSCAPING / SURFACE TREATMENTS AS EARLY AS PRACTICAL.

3. THE CONTRACTOR'S WORKS PROGRAM IS TO BE REVIEWED AT THE PRESTART MEETING.
ALTERATIONS TO THE PROGRAM MAY BE REQUIRED TO ENSURE SATISFACTORY EROSION AND
SEDIMENT CONTROL.

4, SAFETY ISSUES MUST BE CONSIDERED AND MONITORED FOR EACH DEVICE TO THE

 

 

 

 

 

 

 

 

 

      

 

 

 

      
                

“Gy, 82 7,
t | SATISFACTION OF THE SUPERINTENDENT,
@, % Tip ; f 5, SEDIMENT FENCE FILTER FABRIC IS TO BE APPROVED BY THE ENGINEER.
, Fiat PAD FALLS. r— . : f 6, _ SEDIMENTATION MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
/ARDS ROAD, ABUND | Le CONSTRUCTION ACTIVITIES AND MAINTAINED AT A SUITABLE LEVELJ CONDITION THROUGHOUT
TOBE INSTALLED ACROSS x CONSTRUCTION.
THE AGGREGATE PAD TO. = ae 1 |—__—_-
VIRECT RUNOFFTO 7 Sunshine Coast Regional COUrTcti [7 semen rences ane Tope CLEANED OUT WHEN CAPACITY ISREDUCEDY 30%
SEDIMENT FENCE . 8, _ DRAINAGE STRUCTURE PROTECTION IS TO BE CLEANED FOLLOWING EACH SIGNIFICANT NUNOFF
PRODUCING STORM.
iOpen 5 No: Ok
ent Permit pes rons Werks Nor AACR, OTE... ACCESS TO THE SITE 1S TO BE PROVIDED BY THE CONTRACTOR. APPROVAL IS TO BE OBTAINED

sion FROM SUNSHINE COAST REGIONAL COUNCIL FOR THE LOCATION OF THE SITE ACCESS POINT
{APPROVAL AND WASH DOWN AREA WHICH IS TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION
PERIOD. ACCESS TO AND FROM THE SITE IS TO BE VIA THE SHAKEDOWN FACILITY ONLY, ALL
Atte Oney VEHICLES ARE TO BE WASHED DOWN PRIOR TO LEAVING THE SITE.

“se tycations be departed THE CONTRACTOR SHALL PROVIDE TEMPORARY DRAINAGE CONTROLS TO DIVERT FLOW FROM

40-75mm CRUSHED ROCK an & See ‘cations be departed wa
OR RECYCLED CONCRETE Council $ P UNDISTURBED AREAS AROUND DISTURBED AREAS AND DIRECT FLOW FROM DISTURBED AREAS
' 0 : TOWARD CONTROL DEVICES.

1, PONDED RAINFALL SHALL 8E PUMPED THROUGH A SEDIMENT FENCE LOCATED ON THE SITE

STABILISED ENTRY/EXIT POINT - TYPEA BEFORE DISCHARGING INTO THE DOWNSTREAM STORMWATER SYSTEM.

 

 

NTS OR APPROVED EQUIVALENT "2, STRAW BALES USED IN SEDIMENT DEVICES ARE TO BE REPLACED AFTER A MAXIMUM SERVICE
Tay DENOTES STABILISED ENTRY/EXIT PERIOD OF 6 WEEKS.
2/5 ep POINT, REFER LAYOUT PLAN FOR

LOCATIONS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ZAK Nn uetion DCW 1SSS-SENOT-A arg, 2082005 ROTA AM, ecard, LincbebrwiK KZ CAD.

WIRE FILTER CLOTH PROVIDE TOPSOIL LAYER FILTER CLOTH . {
TO EACH STAKE OVER FILTER CLOTH FOR LAP 100mm WEIR TO BE 600mm —++~—————~|_| REFER LAYOUT PLAN FOR SURFACE
wp zs FULL LENGTH OF SILT FENCE WIDE U.N.O. ON TREATMENT AT WEIR OUTLET
; a
Z| s 4 DIRECTION
Z| OVERLAND iy aot BG
RY GS / || BS
1 PROVIDE WIRE sro | 50x 50 HW STAKES soon, | AR —
BETWEEN STAKES FOR OR STAR PICKETS WEIR HEIGHT TO BE
FILTER CLOTH SUPPORT b SECTION 450mm UN.O. ON LAYOUT
ELEVATION { PLAN
SEDIMENT FENCE DETAILS F ‘
NTS” ——7——ss— DENOTES SEDIMENT FENCE, REFER LAYOUT SEDIMENT FENCE wee SEDIMENT FENCE WEIR, REFER LAYOUT
PLAN FOR LOCATION AND EXTENTS. { PLAN FOR LOCATION AND EXTENTS.
x
os CUENT . . DESIGN DRAWN, APPROVED TE & PROJECT NO.
kecosi Contino | KNOBEL CONSULTING PTY LTD | steve RACKEMANN 1 - EL pT ¢{ SEDIMENT AND EROSION CONTROL
ENGINEERS - PROJECT MANAGERS [prover GWHAGER-RPEQ HUMBER (558 LAYOUT PLAN & DETAILS SHEET K1595
Phone: 07 5578 4168 6H08 West Road PROPOSED DUPLEX I DWGNO. | ISSUE
a | mans | ESRD FORAPORONAL fee oy ger 8 Buricigh 51 ELANDA STREET, ‘a
mem] one = Emak eo@sncbelconat com sa Ri sa on 425 202 SUNSHINE BEACH, QLD ( r 02-06-09 cue {260 aS a ee SEOO01| A
4 |

Used in these records

About this file

File size
526 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Approved Plans (Preliminary Approval) [As Published].pdf · 526 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.