BROWN
’’;’’..111’’ t’ !"
Doonella OPTIONS Analysis OPTIONS 2-4
B09182.W
BROWN Consulting: B09182.w, 14/03/2013, MS, IP
Below is a summary of the options investigations as requested by the client. It should be noted that
for Options 2-3, with the incorporation of additional basins, runoff of up to 100 Year ARI from their
corresponding catchments has to be diverted to the respective basins for the water quantity
strategies to be effective. Assumptions in this analysis are carried from Brown Consulting Report
B09182.W-02A dated October 2011.
OPTION 2:Strategy incorporates Basins B1A and Ble and original Twigrush Basin.
As required by Sunshine Coast Council the Dodonaea Basin is to be removed from the strategy. To
mitigate peaks flows, Basins B1A and B1C have been included. They are to mitigate the flow from
their corresponding developed catchment areas. Twigrush (original configuration) basin has also
been included 0 mitigate the flows from the removal of Dodonaea Basin. The basin design
requirements are shown in the Table 1 below; refer to sketches for sizing of basins. It should also be
noted that for this option runoff from Sub Catchment 2B2 bypasses the Twigrush Basin.
Table 1: Original Twigrush Basin Configuration
Twigrush Ba~in
OPTION 2 Basin B1A Basin B1C
(original size)
Upstream
B1A B1C 0,C3,C2
Catchment
Storage Volume
1080 1100 1,210
(m3)
Design Depth (m) 1.2 1.2 1.8
Basin Invert RL (m.
8.5 13 7.5
AHD)
Basin Top RL (m.
10 14.5 9.6
AHD)
As expected with the original sized Twigrush basin and the removal of Dodonaea basin, the strategy
does not meet the requirements of mitigating peak flows (apart for the 2 year ARI). Refer to Table 2
below.
Table 2: OPTION 2 Results
Existing WBNM Developed WBNM Change (%)from Existing
ARI
(Peak Flow m3/s) (Peak Flow m3/s) Scenario
2 0.89 0.88 -0.9%
5 1.42 1.56 10.1%
10 1.75 1.99 13.6%
20 2.20 2.51 14.1%
50 2.61 2.94 12.6%
100 3.07 3.42 11.3%
B09182.W_Options_2_3_40N LV _130314.docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further information re Request to Change Approval MCU 132003.221132.8Related documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.