Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Further information re Request to Change Approval MCU 132003.221132.8

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (39.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

    The times for Dodonaea Basin to empty for different ARI events are
                                                                                          present in Table 6 below.




    In summary the Option 3 strategy incorporating new Basins BIA, B1C and the
                                                                              reconfiguration of the
    Twigrush and Dodonaea Basins will still mitigate peak flow increases from the
                                                                             proposed development.
    The reduction in WSL’s in the Dodonaea Basin compared to the previous
                                                                          strategy is significant. The
    time in which the Dodonaea Basin takes to empty has also reduced.


    The peak flow management strategy has been updated to achieve
                                                                                       non-worsening objectives while the
    Dodonaea Basin configuration allows for the installation of a fauna
                                                                                         crossing under Dodonaea Close.
    We     trust     this information is acceptable and
                                                 respectfully request the new stormwater management
    strategy for Lake Doonella, Noosa Stage C Development be approved.

    Should you require any further information, please do not hesitate to contact Andrew McPhail or the
    undersigned on.
    (07)3895 3444.

    Yours sincerely,
    Brown Consulting (QLD)Pty Ltd

.




            ~
                ~)t\(
    Andrew McPhail
    P17ncipa/Engineer- Water and Environmellt

    ATIACHMENTS
    1.   Email from SCRC Senior Development Planner Dennis Wallace
    2.   Drawing,;




    Level 6, 199 Grey Street South Brisbane QLD 4101 Australia       Brown Consulting (QLD)Pty Ltd
    PO Box 10349 Adelaide Street Brisbane QJ..D 4()OO Australia      ABN 36 109 428 506
    Telephone +61 738953444            Facsimile +61 738953400       brownconsulting.com.au

Used in these records

About this file

File size
39.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Further information re Request to Change Approval MCU 132003.221132.8.pdf · 39.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.