Skip to the record
Beware of cheap imitations.

Council archive · source document

Further information re Request to Change Approval MCU 132003.221132.8

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (39.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 39, section 1. The text section number identifies this passage in the reader.

INTRODUCTION                                                                                                    1-1



1            INTRODUCTION

             For the Doonella Noosa project, stages A, Band D have been approved and are in differing phases

             of construction.        The process which has been utilised in obtaining these approvals (in respect of

             stormwater management) for these earlier stages has included a process of review and checking.

             Generally, Stockland’s civil designer would firstly integrate the requirements of the approved
             ’Doonella Noosa Stormwater and Water Quality Management Plan’ (Final Report), R.B14640.001.04

             (September2005), into their civil design drawings for the respective stages. At this stage, BMT WBM
             would review the designs for consistency with the Doonella Noosa Storm water and Water Quality

             Management Plan (WBM, 2005). Any shortcomings would be addressed prior to issue of final
             designs for approval by Council.

             BMT WBM commenced review work of Stage C designs in August 2009, however due to external

             factors Stockland Developments postponed the completion of the designs. In August of 2010, BMT

             WBM recommenced assessment of Stage C, but with the inclusion of the "Link Road" which was

             added within the Stockland owned           portions of the site after discussions with Sunshine Coast
             Regional Council (SCRC). The effect of the addition of the Link Road within the Stockland owned
             portions of the site was that several hundred square metres of dedicated storm water treatment land
             was lost to accommodate road and related infrastructure.



             The effect of the loss was critical to stormwater management of the Stage C site, in that the lost area

             for stormwater treatment meant that the previously established water quality objectives (discussed

             further below) were unable to be met. This matter was discussed at length with SCRC, and as a

             result of specific statements included within the court order which provides for development approval,

             SCRC were unable to accept any of the             options presented to them   in   respect of stormwater
             management.

             As such, Stockland Development has proposed to make amendments to the court order to address

             these issues relating to stormwater management.




G:\ADMINIB15573.G.BAD’R.B15573.002.00.DOC

                                                                                                (f!. BMTWBM

Used in these records

About this file

File size
39.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Further information re Request to Change Approval MCU 132003.221132.8.pdf · 39.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.