Sian Davis
~-
From: Sian Davis
Sent: Friday, 15 March 2013 9:19 AM
To: ’Denis Wallace’
Cc: Kerri Coyle; Mark Lewis; Joshua Sondergeld; ’Barry Kearney’
Subject: FW: Doonella Stormwater Dicussion
-
Attachments: B09182.w _Options_2_3_40NLY_130314 B.PDF; B09182.w-02A_120514.pdf; Doonella
WBNM Model_130314.zip
Hi Denis,
Further to our recent discussions, please find attached various stormwater options that Browns have been
investigating for Doonella Noosa. It is noted that some of the information attached was discussed at our meeting of
20 February, and I apologise for not getting this material through to you sooner. The hydraulic modelling (refer
attached data) had to be reviewed prior to sending through to Council.
You will note that the report references options 2 _
4. Option 1 has been removed as it was identified as being
unviable for all parties.
It would be appreciated if you could send through to Councils hydraulic engineers for review prior to discussion at
our next meeting. Can you please advise the next available date that yourself and Mark (and / or Leon or Rob) will
be available to meet? I understand that Kerri is on leave from Wednesday next week, and appreciate that we may
not be able to meet prior to her departure. In this regard, I can confirm that the tentative meeting time we had
convened for Tuesday at l1am is no longer suitable from our side, but we are available at 3pm if that suits. If not,
please let me know when you are free.
As you know, we are keen to have this matter resolved such that Stockland is in a position to commence detail
design and lodgement of operational works applications over Stage C.
I look forward to hearing back from you.
Many thanks,
Sian Davis
Senior Planner
RPS Australia Asia Pacific
1 Innovation Parkway, Birtinya, OLD, Australia, 4575
PO Box 149, Wurtulla, OLD 4575
Dir: +61 754367807
Tel: +61 754367888
Fax: +61 754936630
Email: [email protected]
www: http://rpsgroup.com.au
This e-mail message and any attached file is the property of the sender and is sent in
confidence to the addressee only.
Internet communications are not secure and RPS is not responsible for their abuse by third
parties. any alteration or corruption in transmission or for any loss or damage caused by a virus
or by any other means.
From: Denis Wallace [mailto:[email protected]]
Sent: Thursday, 7 March 2013 3:52 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further information re Request to Change Approval MCU 132003.221132.8Related documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.