Original source · versioned page text
Minor Change - MCU17 0568 01 & OPW17 0602 01 [As Published]
46. Removal of any existing redundant property accesses and reinstatement of the kerb &
channel and verge area to match the balance of the site frontage and inconsistent with
approved plans and layout, including the provision of topsoil and turf where the existing verge
is grassed.
47. Any existing kerb & channel and concrete footpath sections requiring removal due to the new
works must be saw-cut and removed to allow for a smooth and neat finish with the new
works.
Works within Road Reserve and Reinstatement Works
48. Safe pedestrian access on all streets in the vicinity of the development must be maintained
at all times. Should footpath/road closures be necessary to carry out construction works,
Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
49. Where required, any reinstated road pavement must be in accordance with IPWEA standard
drawing RS-170 with road pavement resurfacing to consist of a minimum depth of 50mm of
an approved hot mixed asphaltic concrete.
50. Removal of any existing redundant property accesses and reinstatement of the kerb &
channel and verge area to match the balance of the site frontage and inconsistent with
approved plans and layout, including the provision of topsoil and turf where the existing verge
is grassed.
51. Replacement of any damaged, irregular or substandard sections of kerb & channel.
Earthworks
52. All earthworks must be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical supervision
and testing undertaken in accordance with Section 8 of the Standard, and to a minimum of
‘Level 2’ as defined in Appendix B.
53. All Earthworks and construction works must be carried out taking into consideration the
protection of any existing above and below surface services, and the stability and protection
of fences and any buildings and structures on the adjoining properties.
Stormwater Drainage
54. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties including road and public footpath by blocking or interfering
with overland flow path.
55. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
56. The site must be provided at all times with the stormwater drainage system connecting to a
lawful point of discharge as detailed on the Approved Plans listed in this Decision Notice.
57. All primary stormwater quality treatment devices must be routinely checked, serviced and
cleaned in accordance with the manufacturer’s recommendations Records of all
maintenance activities undertaken must be kept and made available to Council upon request.
Stormwater Harvesting
58. Operating rainwater collection tanks must be provided as shown on the Approved Plans listed
in this Decision Notice. The tanks must be provided in accordance with a Building Works
approval.
Page 8 of 15
Document Set ID: 22608628
Version: 4, Version Date: 05/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original