2504-45768 SRA

Attachment 1—Referral agency conditions

 

[Under section 56(1)(b)(i) of the Planning Act 2076 the following conditions must be attached to any development
approval relating to this application) (Copies of the docurnents referenced below are found at Attachment 5)

 

No. | Conditions Condition timing
Development Permit - Operational Work

Schedule 10, Part 17, Division 3, Table 2, Item 1 — Tidal works or work in a coastal management
district—The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:

 

 

 

 

Approved plan
1. The development must be carried out generally in accordance with At all times
the following plan:

« Site plan and water allocation prepared by Marine Structures
dated 4 March 2025 reference MS-05063-01, Revision C

« Layout plan prepared by Marine Structures dated 4 March
2025 reference MS-05063-02, Revision B

 

 

Lighting
2. (a) Light/mark all vessels, structures, plant and equipment For the duration of
associated with: works and for
i. the works, in accordance with the following operation to be
specifications: maintained at all times

*® any anchors deployed must be marked with yellow
buoys and fitted with FL yellow lights fitted

* lighting provided must not obscure, disguise or
otherwise interfere with the effectiveness of
navigational lighting.

ii, operations, in accordance with the following

specifications:

* section 3 of AS4282-1997 Contro! of the obtrusive
effects of outdoor lighting

(b) Lighting provided must not obscure, disguise or otherwise
interfere with the safe navigation of other vessels, including the
effectiveness of navigational lighting.

 

Protection of navigable waterways

 

3. The construction, operation and maintenance of the pontoon and any | For the duration of
ship berthed, moored or attached to the structure, must not: works, and at all times
(a) encroach into, pass over or under a navigation corridor
(b) be located in a high-risk maritime zone
(c) impede the safe navigation of other ships or boats
(d) restrict safe access to or from neighbouring structures.

 

 

 

 

 

 

 

4 Remove and dispose of any debris or similar obstruction For the duration or
encountered whilst undertaking the work at an appropriately licensed | works
facility.

5. All piles and/or structure to be demolished both above and below the | Prior to the completion
waterline must be completely extracted/removed. of the works

State Assessment and Rederral Agency Page 3 0f7

Version: 4, Version Date: 21/05/2025

Page 8 of 13

Used in these records

About this file

File size
553 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority MCU25 0038 & OPW25 0056 (As Published).pdf · 553 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.