Council archive · source document
Decision Notice - Approved by Delegation of Authority MCU25 0038 & OPW25 0056 (As Published) · MCU25/0038
Document Set ID: 23750098 2504-45768 SRA Attachment 1—Referral agency conditions [Under section 56(1)(b)(i) of the Planning Act 2076 the following conditions must be attached to any development approval relating to this application) (Copies of the docurnents referenced below are found at Attachment 5) No. | Conditions Condition timing Development Permit - Operational Work Schedule 10, Part 17, Division 3, Table 2, Item 1 — Tidal works or work in a coastal management district—The chief executive administering the Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: Approved plan 1. The development must be carried out generally in accordance with At all times the following plan: « Site plan and water allocation prepared by Marine Structures dated 4 March 2025 reference MS-05063-01, Revision C « Layout plan prepared by Marine Structures dated 4 March 2025 reference MS-05063-02, Revision B Lighting 2. (a) Light/mark all vessels, structures, plant and equipment For the duration of associated with: works and for i. the works, in accordance with the following operation to be specifications: maintained at all times *® any anchors deployed must be marked with yellow buoys and fitted with FL yellow lights fitted * lighting provided must not obscure, disguise or otherwise interfere with the effectiveness of navigational lighting. ii, operations, in accordance with the following specifications: * section 3 of AS4282-1997 Contro! of the obtrusive effects of outdoor lighting (b) Lighting provided must not obscure, disguise or otherwise interfere with the safe navigation of other vessels, including the effectiveness of navigational lighting. Protection of navigable waterways 3. The construction, operation and maintenance of the pontoon and any | For the duration of ship berthed, moored or attached to the structure, must not: works, and at all times (a) encroach into, pass over or under a navigation corridor (b) be located in a high-risk maritime zone (c) impede the safe navigation of other ships or boats (d) restrict safe access to or from neighbouring structures. 4 Remove and dispose of any debris or similar obstruction For the duration or encountered whilst undertaking the work at an appropriately licensed | works facility. 5. All piles and/or structure to be demolished both above and below the | Prior to the completion waterline must be completely extracted/removed. of the works State Assessment and Rederral Agency Page 3 0f7 Version: 4, Version Date: 21/05/2025 Page 8 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU25 0038 & OPW25 0056 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 553 KB (small file)
- File type
No other editions are linked here.