Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 24, section 2. The text section number identifies this passage in the reader.
23
90 PROPOSED
ti
75
exis
ck re
123 51 DATE:
new stormwater pit 89 CARPARK 24
15/3/18
g blo
76
124 50
n
88
existi
77
125
w
49 25
87
78
126 48 26
86
79
proposed 47
new trees 27
boundary line 127
80
s
46 28 existing sewer manhole
128 81
45 29
e
82
nc
129
fe
44 30 general services
in k
alignments refer
existi
83
l
engineer for details
ain
w
43
ch
130 31
n
g kerb
g
84
in
ist
42 32
ex
131
& cha
85
41 33
nnel
132
40 34
133
17 SHORT ST SOUTHPORT QLD 4215 AUSTRALIA
PO BOX 930 SOUTHPORT QLD 4215 AUSTRALIA
39 35
proposed permiable
P +61 7 5532 2044 / ABN 35 071 453 257
paving
134
e
38 36
lin
ry
135
da
w
un
37
bo
s
136
bo
EXISTING
un
137
da
BUILDING
ry
lin
138
[email protected]
e
139
BURLINGBROWN.COM
140
w
proposed
bioretention
line of existing trees 141 basin
to be retained
142
ex existing sewer manhole
existing ist in bo
kerb ramp g un
W co
nc
da
ry
AL re
te lin
e nda
ry li
ne
N TE fo
ot
p bou
R at
PROPOSED LANDSCAPE PLAN
h
HA _PRELIMINARY
s
Y new PROPOSED CARPARK SCALE 1:500@A3
ISSUE
DR stormwater
pit
NOT FOR
IV
CONSTRUCTION
GOOD SHEPHERD LUTHERAN COLLEGE E
PROPOSED CARPARK
existing
kerb ramp 0 5 10 15 25m
ISSUE
LOCATION: 115_EUMUNDI ROAD_NOOSAVILLE_QLD_4566. P3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.