Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
‘00mm WALTER HAY DRIVE 1:250 AT A1 0 5 10 15 20m 4:500 AT AS ORB LEGEND —-— STORMWATER CATCHMENT BOUNDARY ® STORMWATER CATCHMENT LD. LPOD LAWFUL POINT OF DISCHARGE TREES TO REMAIN => FLOW ARROW EXTERNAL STORMWATER CATCHMENT |.D. STORMWATER CATCHMENT TABLE T 2 CATCHMENT iD. | AREA (@ A 3578 B 1436 EXTA 449 REPORT ISSUE NOT FOR CONSTRUCTION CONTRACTOR TO CONFIRM AND LOCATE ALL EXISTING SERVICES PRIOR TO COMMENCEMENT OF WORKS Rev.| Date _ | Revision Details @ é Odyssey Consulting Group Structural and Civil Engineers Cayssey Consuting Goup ABNEY 246954126 Telephone: #6175575 748 e Focsiil: +817 5841 7952 ‘odeconsuling coma ral [email protected] GOOD SHEPHERD LUTHERAN COLLEGE A_| 14-03-18 | ISSUED FOR REPORT PROPOSED CARPARK 115 EUMUNDI ROAD NOOSAVILLE Drawing Tile POST DEVELOPMENT CATCHMENT PLAN Drawn’ ‘Signed Date Scale: [Set ‘Size DKC Project Number Designed | Signed Date as K4277 Checked | Signed Date AT Drawing No! Rev. Approved — | Signed Date ZAK4277\Preliminary\ DWG\K4277-POOE-A dwg, 14/03/2018 10:30:41 AM, DaleC, PDF995 Tanne) eG yds
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.