Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.

of 37

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 32, section 1. The text section number identifies this passage in the reader.

 

‘00mm

WALTER HAY DRIVE

CONNECT TO
EXISTING GULLY PIT

PERMEABLE
150m? PAVERS

190mm HIGH KERB

PROPOSED 4m? ©
BIORETENTION BASIN

     
 

CONNECT TO
EXISTING GULLY PIT

  
 
 
 
  
 

PROPOSED 20m?
BIORETENTION BASIN

190mm HIGH KERB

 

 

 

 

 

 

|_ PROPOSED 100m
STORMWATER DETENTION

 

 

 

a

 

|

PERMEABLE
/ K 69m? PAVERS

J

 

   

 

LLL

 

 

  

 

 

 

 

 

 

 

 

VY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
   
 
 
 
  

 

 

 

 

LOT 1
SP228052

 
 

Eumy,
NDI No,
OSA R
OAD

 

é CONNECT TO

Le TINS GULLY PIT

 

 

 

£ %.
a .
\
\
7 \
Ly
ig Y,
>
. Be a
~, \ SS
—
=. '
.
.
© :
.

PROPOSED PIT TO
CAPTURE EXTERNAL
FLOWS

   
 
 

1:250ATA1 0 5 10 15 20m
1:500 AT A3.

NOTE:
FOR STORMWATER DETENTION AND.
BIORETENTION DETAILS REFER P010

LEGEND

®

STORMWATER CATCHMENT .D.

 

 

 

 

 

 

 

LPOD LAWFUL POINT OF DISCHARGE
= FLOW ARROW
swo PROPOSED STORMWATER DRAINA\
———swo——— EXISTING STORMWATER PIPE
———1-—— __ EXISTING TELSTRA
——-w-—— _ EXISTING WATER MAIN
———£-0/H——~ EXISTING OVERHEAD ELECTRICAL
—-—-s-—— _ _ EXISTING SEWER MAIN
TREES TO REMAIN
WH: PERMEABLE PAVEMENT
STORMWATER CATCHMENT
TABLE
STORMWATER 2
CATCHMENT I.D. AREA (mm?)
A 3578
B 1436
EXTC 449

 

 

 

 

STORMWATER CATCHMENT BOUNDARY

GE

 

REPORT ISSUE
NOT FOR CONSTRUCTION

 

 

 

 

 

CONTRACTOR TO CONFIRM AND

LOCATE ALL EXISTING SERVICES PRIOR

TO COMMENCEMENT OF WORKS

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

Rev.| Date _| Revision Details pm | Apo @ Builders Name’ Client Name Project Details Drawing Tite Oe Signed Date Scale [Beet see A
. Project Number
@ ® Odyssey Consulting Group Deswres) Sores Dae K4277
@ Structural and civil Engineers GOOD SHEPHERD PROPOSED CARPARK STORMWATER MANAGEMENT | ‘Alp
fener as foot Sue LUTHERAN COLLEGE NOOSAVILLE Oneced Sed Date
cna peongennatore — —
way eae fenroed Signed Date
A 14-03-18 | ISSUED FOR REPORT DKC AT P007 A

 

 

 

 

 

 

ZAK4277Preliminary\ DWG\K4277-POOT-A dwg, 14/03/2018 10:30:48 AM, DaleC, PDF995

 
Log in to download the original file

Stormwater Management Plan.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.