Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 35, section 1. The text section number identifies this passage in the reader.
‘00mm WALTER HAY DRIVE SP228052 1:250ATA1 0 5 10 15, 20m 1:500 AT A3. a ———————— LEGEND —_—— Fs SEDIMENT FENCE STABILISED ENTRY/EXIT POINT WATER QUALITY MONITORING STATION DRAINAGE STRUCTURE PROTECTION sw PROPOSED STORMWATER DRAINAGE ———swo— — — EXISTING STORMWATER PIPE —--1--— EXISTING TELSTRA —--w--— EXISTING WATER MAIN a EXISTING OVERHEAD ELECTRICAL —--s--— EXISTING SEWER MAIN TREES TO REMAIN REPORT ISSUE NOT FOR CONSTRUCTION CONTRACTOR TO CONFIRM AND LOCATE ALL EXISTING SERVICES PRIOR TO COMMENCEMENT OF WORKS ZAK4277\Preliminary\ DWG\K4277-P008-A dwg, 14/03/2018 10:30:54 AM, DaleC, PDF995 Rev.) Date | Revision Detais e Builders Name Client Name Project Details, Drawing Tite: Pam Signed Date Scale: [see ‘Size Al . Project Number Odyssey Consulting Group Designed | Sred Dat ) Structural and Civil Engineers GOOD SHEPHERD PROPOSED CARPARK SEDIMENT AND EROSION JP K4277 2 Constng op 1 2469041 Telshone 6175575744 115 EUMUNDI ROAD CONTROL PLAN 5 ert encat oe ren LUTHERAN COLLEGE NOOSAVILLE wT me ket ieeagacones Saran a ‘Approved | Signed Date A 14-03-18 | ISSUED FOR REPORT P008 A beer) be bo ‘tne
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.