Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.

of 37

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

Good Shepherd Lutheran College                                                                Odyssey Consulting Group
Proposed Unit Development                                                      Conceptual Stormwater Management Plan
Lot 30 on SP170751                                                                                   Project No: K4277
115 EUMUNDI NOOSA ROAD, NOOSAVILLE




1.0 INTRODUCTION
1.1     Background
        Odyssey Consulting Group (ODC) has been commissioned by Good Shepherd Lutheran College to
        prepare a Conceptual Stormwater Management Plan (CSWMP) for the Proposed Car Park at 115
        Eumundi Noosa Road, Noosaville.
                                                                                2
        The subject site is described in Table 1 and has a total area of 5,014 m .

        Table 1:       Site Description

                       Developer                Lot and Property Description               Street Address

                                                                                     115 Eumundi Noosa Road,
             Good Shepherd Lutheran College          Lot 30 on SP170751
                                                                                            Noosaville


        In preparing the CSWMP ODC has considered the applicable requirements for the management of the
        stormwater quantity measures appropriate for the subject site and proposed development.

1.2     Scope
        This CSWMP details the conceptual planning, layout and design of the stormwater management
        infrastructure for both the construction and operational phases of this development.

        This CSWMP aims to:

                  Establish the required performance criteria for the proposed stormwater quantity and
                   quality management systems;
                  Provide a conceptual design of stormwater infrastructure including stormwater quantity and
                   quality management controls where required;
                  Provide guidelines for stormwater quality during construction and operational phase;
                  Ensure stormwater runoff is conveyed through the site to a lawful point of discharge in
                   accordance with QUDM and Council’s Planning Scheme Policy; and
                  Provide reporting and monitoring mechanisms whereby the performance of this system can
                   be measured enabling identification of corrective actions/alterations required to ensure the
                   above mentioned objectives are maintained.

        This CSWMP has been prepared in accordance with the IEAust, (National Committee on Water
        Engineering), Australian Runoff Quality (Draft), Queensland Urban Drainage Manual (QUDM) and
        Noosa Shire Council, Noosa Plan 2006.




K4277-0002                                        14 March 2018                                           Page 1 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.