Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
Good Shepherd Lutheran College Odyssey Consulting Group Proposed Unit Development Conceptual Stormwater Management Plan Lot 30 on SP170751 Project No: K4277 115 EUMUNDI NOOSA ROAD, NOOSAVILLE 3.3 Post Development 3.3.1 Catchment Definition and Lawful Point of Discharge The post development scenario consists of two internal catchments that convey the stormwater to the south and west of the site. Catchment A discharges into existing Council stormwater infrastructure on Eumundi Noosa Road on the western site boundary. Catchment B discharges into existing Council stormwater infrastructure on Walter Hay Drive off the southern corner of the site. These discharge points represents the Lawful Points of Discharge (LPOD) for the site. The post development catchment area and lawful point of discharge is shown on the Odyssey Consulting Group, Post Development Catchment Plan (Ref: K4277/P006/A) included as Appendix D. 3.3.2 Coefficient of Runoff The post development coefficient of runoff (C year) was determined based on the fraction impervious 2 (fi) method as specified in QUDM. The proposed development has a total impervious area of 4,513 m 1 which equates to a fraction impervious value of 0.9. Using a one hour, ten year rainfall intensity ( I10) of 72.3 mm/hr, a C10 value of 0.88 has been adopted for the post development scenario. With reference to QUDM Table 4.05.3, applying the frequency factors for the standard storms of 2, 10, 20 and 100 years results in the following post development coefficients of runoff as shown in Table 5. Table 5: Post Development Catchment Impervious Properties 2 2 Catchment Impervious Area (m ) Catchment Area (m ) Fraction Impervious C10 A 3,220 3,578 0.90 0.88 B 1,292 1,436 0.90 0.88 With reference to QUDM Table 4.05.2, by applying the frequency factors for the standard storms of 2, 5, 10, 20, 50 and 100 years result in the following pre development coefficients of runoff as shown in Table 6. Table 6: Post Development Coefficients of Runoff Catchment 2 5 10 20 100 A&B 0.75 0.84 0.88 0.92 1.06 3.3.3 Time of Concentration Both post development catchments will have a standard time of concentration of five (5) minutes for paved areas. 3.3.4 Design Flow Rates Design storm flow rates have been calculated for standard storms with an ARI of 2, 5, 10, 20, 50 and 100 years for the post development case using design rainfall intensities from the Bureau of Meteorology. The Rational Method (Q = 2.78 x 10-3 CIA) has been used to calculate the required design flow rates for the subject site. The calculated post development peak flows for this subject site are presented in Table 7. K4277-0002 14 March 2018 Page 5 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.