Council archive · source document
22854-s285 Concurrence agency response With conditions · OPW15/0121
Attached to the e-mail OPW15/0121 Concurrence Agency Response with conditions.
SDA-0715-022854 Our reference: SDA-0715-022854 Your reference: OPW15/0121 Attachment 1—Conditions to be imposed No. Conditions Condition timing Operational works 7.2.15 Tidal works, or development in a coastal management district—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. Provide written notice to: When the Regional Harbour Master development Maritime Safety Queensland authorised under this Macarthur Avenue East approval has started, Pinkenba Qld 4008 and when it has been completed. when the development authorised under this approval has: a) started; and b) when it has been completed. These notices must state this permit number, the location and name of registered place and the condition number under which the notice is being given. 2. "As Constructed" drawings must be provided to: Within two (2) weeks Regional Harbour Master of the completion of Maritime Safety Queensland the works. Macarthur Avenue East Pinkenba Qld 4008 3. The construction, operation or maintenance of the structure, and At all times. any ship moored at this structure, must not impede the safe navigation of other ships or restrict safe access to or from neighbouring structures. 4. Any ship, dry berth or device (including Air Lifting Pontoons) At all times. berthed, moored or attached to the structure must not exceed the following sizes: Wet berth — length overall: 5.0m; Maximum vessel mass: 1500kg 5. The jetty must be constructed totally within the approved quayline. At all times. 6. No part of any structure or any ship berthed at the approved At all times. structure is to encroach within 1.5 metres from the side boundaries of the allocated water space as shown on the submitted water allocation plan 25251-J1 as attached. 7. Any debris or similar obstruction encountered whilst undertaking Prior to the the work must be suitably disposed of at the applicant’s cost. completion of the works. Department of State Development, Infrastructure and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
22854-s285 Concurrence agency response With conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 276 KB (small file)
- File type
No other editions are linked here.