Council archive · source document
22854-s285 Concurrence agency response With conditions · OPW15/0121
Attached to the e-mail OPW15/0121 Concurrence Agency Response with conditions.
SDA-0715-022854 Our reference: SDA-0715-022854 Your reference: OPW15/0121 Attachment 2—Reasons for decision to impose conditions The reasons for this decision are: To facilitate the monitoring of the development works for compliance purposes. To ensure the development does not encroach on the navigable waterway in a way that impedes the safe passage of vessels. To ensure the development does not adversely affect navigable access to neighbouring premises. To ensure that at all times, all lights on or above the development site do not interfere with safe navigation in surrounding waterways. Department of State Development, Infrastructure and Planning Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
22854-s285 Concurrence agency response With conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 276 KB (small file)
- File type
No other editions are linked here.