Council archive · source document
Attachment A - Existing approval (00019209) · MCU15/0091
Attached to the e-mail MCU15/0091 Development Application - 287 Gympie Terrace Noosaville.
Kimlin Enterprises Pty Ltd - 03997 TR . Page 5 20. 21. 22. 23. 24. 25. document36 19.2.5 Headworks shall be calculated as the value of headworks assessed at the time prescribed by the Local Government (Planning and Environment) Act 1990, plus interest charged at the rate set by the Queensland Treasury Corporation for Local Government borrowings as they apply to Noosa Shire. The interest rate used shall be the rate current at the "time prescribed" above; 19.2.6 Should the contributions not be paid at the due time, Council shall call upon the security lodged; and 19.2.7 in the case of a building permit, if a permit expires the securities held will be returned. Construction of roadworks, drainage and footpath improvements across the full frontages of the development to the satisfaction of the Shire Engineer. Such works shall involve the construction of kerb and channel, bitumen widening, associated drainage, hot mix correction to the existing pavement, where required and footpath upgrading works. In this regard, plans prepared by a registered Civil Engineer are to be submitted to and approved by the Shire Engineer, prior to the issue of Building Approval. A design prepared by a registered Civil Engineer is to be submitted outlining the indented carparking proposed in both Gympie Terrace and Weyba Road. This plan is to conform to AS2890.1. Any existing vehicle crossovers superfluous to the approved design are to be broken out-and replaced with kerb to match the surrounding. The footpath across the frontages of the site is to be upgraded by the provision of a 1.2 metres wide concrete footpath and the forming, grassing and topsoiling of the remaining area to the standards and requirements of the Shire Engineer. The applicant is to contact Council's Engineering Department to determine the footpath alignment prior to the commencement of any works. A meandering footpath is desirable. The developer shall bear the cost of alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site. Connection to Council's existing water supply and sewerage reticulation systems at the developer's expense to the standards and requirements of Council's Shire Engineer. The developer shall provide metered water connections from the water supply system to the proposed development, in accordance with Council's standards and to the satisfaction of the Shire Engineer.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Existing approval (00019209).pdfRelated documentApplication case desk ↗
About this file
- File size
- 364 KB (small file)
- File type
No other editions are linked here.