Kimlin Enterprises Pty Ltd - 03997 TR . Page 5

20.

21.

22.

23.

24.

25.

document36

19.2.5 Headworks shall be calculated as the value of headworks
assessed at the time prescribed by the Local Government
(Planning and Environment) Act 1990, plus interest
charged at the rate set by the Queensland Treasury
Corporation for Local Government borrowings as they
apply to Noosa Shire. The interest rate used shall be the
rate current at the "time prescribed" above;

19.2.6 Should the contributions not be paid at the due time,
Council shall call upon the security lodged; and

19.2.7 in the case of a building permit, if a permit expires the
securities held will be returned.

Construction of roadworks, drainage and footpath improvements across
the full frontages of the development to the satisfaction of the Shire
Engineer. Such works shall involve the construction of kerb and channel,
bitumen widening, associated drainage, hot mix correction to the existing
pavement, where required and footpath upgrading works. In this regard,
plans prepared by a registered Civil Engineer are to be submitted to and
approved by the Shire Engineer, prior to the issue of Building Approval.

A design prepared by a registered Civil Engineer is to be submitted
outlining the indented carparking proposed in both Gympie Terrace and

Weyba Road. This plan is to conform to AS2890.1.

Any existing vehicle crossovers superfluous to the approved design are to
be broken out-and replaced with kerb to match the surrounding.

The footpath across the frontages of the site is to be upgraded by the
provision of a 1.2 metres wide concrete footpath and the forming, grassing
and topsoiling of the remaining area to the standards and requirements of
the Shire Engineer. The applicant is to contact Council's Engineering
Department to determine the footpath alignment prior to the
commencement of any works. A meandering footpath is desirable.

The developer shall bear the cost of alteration of any public utility or other
facilities necessitated by the development of the land or associated
construction works external to the site.

Connection to Council's existing water supply and sewerage reticulation
systems at the developer's expense to the standards and requirements of
Council's Shire Engineer.

The developer shall provide metered water connections from the water
supply system to the proposed development, in accordance with Council's
standards and to the satisfaction of the Shire Engineer.

Used in these records

About this file

File size
364 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment A - Existing approval (00019209).pdf · 364 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.