Original source · versioned page text
2017-07-20 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 20 JULY 2017
Total Nitrogen 45% reduction compared
to an unmitigated
development
Where proprietary water quality treatment devices are included within the
stormwater quality treatment strategy, evidence of a signed contract for a
minimum period of 10 years for maintenance of the proprietary stormwater
quality treatment device must be provided to Council prior to
commencement of use.
B. Delete condition 27 k).
4 152006.1999.01 APPLICATION FOR EXTENSION TO THE RELEVANT PERIOD
RELATING TO DEVELOPMENT PERMIT FOR RECONFIGURATION OF A LOT (52 LOTS
& PARK) FOR 191 HOLLETT ROAD, NOOSAVILLE
Item not dealt with by Planning & Environment Committee. Referred to General
Committee for consideration.
Reason for referral – Awaiting receipt of legal advice.
5 PLANNING AND ENVIRONMENT COURT APPEAL D59 OF 2017 REFUSAL OF
DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE (DETACHED HOUSE X
19) AT 90 BEACH ROAD NOOSA NORTH SHORE
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 11 July 2017 regarding Planning and Environment Court Appeal
D59 of 22 May 2017 and agree to defend the appeal.
6 LOCAL GOVERNMENT INFRASTRUCTURE PLAN (STORMWATER NETWORK PFTI &
SOW)
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 11 July 2017 regarding the review of the Stormwater
network required for the new Local Government Infrastructure Plan (LGIP) under The Noosa
Plan 2006 and approve:
A. The Plans for Trunk Infrastructure (PFTI) Maps provided in Attachment 2 to the report
noting the service catchments being limited to the Priority Infrastructure Area (PIA) area
for preparing the SOW model;
B. The Stormwater Network Future Projects for including in the LGIP Schedule of Works
(SOW) provided in Attachment 1 noting that the base costs estimates will be refined
following completion of the excel SOW Model; and
C. Note that further amendments will be made to the SOW and incorporated in a
subsequent LGIP to be prepared for the new Planning Scheme that reflects Council’s
further network planning.
Page 7 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.