Original source · versioned page text
Development Application IDAS Forms 1 & 6
Application details-IDAS form 1
(SustainablePlanning-Act2009 version 1.0 effective 18 Oecember 20(9)
liiiiiiiiii @
80495732
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
.
complete this form (Application details-I AS form 1)
.
complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable PlanningAct 2009or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Applicant details (note:the applicant is the person responsible for making the application and need not be the owner of
the land. The applicant is responsible for ensuring the information provided on allIDAS application forms is correct. Any
development permit or preliminary approval that may be issued as a consequence of this application will be issued to the
applicant.)
Name/s (Individual or company name In full) I pftVrO r~ S’Ak}<._
;
For companies, contact name
Postal address
’f\\ C-.)
Contact phone number
C\O,?f06 ,
Mobile number (no -m~d~~ry)
r.
St,"? 1\:)\
\\~
Fax number (non.ma
ocn’f
e-mail address (non-m
StOry)
\datOry)
"J\:
__
{O
__-----
----------
--------
C-
0...
,
( q ?t C-
-----
@ h"
"R; ""rP......... F;S
[OCR of page images]
OPW INZ/OZ%ZE
| | | Integrated Development Assessment System form
Application details—IDAS form 1 win @
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) B0495732
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
e complete this form (Application details—/DAS form 1)
e complete any other forms relevant to your application
e provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Applicant details (note: the applicant is the person responsible for making the application and need not be the owner of
the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any
development permit or preliminary approval that may be issued as a consequence of this application will be issued to the
applicant.)
Name/s (individual or company name in full) DAV, (0 £ C¥oMYer TSAR
For companies, contact name
Postal address ECKEV $7.
—_ Petes BEAT ¥S>2
oe MY Bu 2 LEY
Contact phone number
if \O
Mobile number (non-mandatory)
§ -
Fax number (non-ma eo : «oot fo —
e-mail address (non-mandatory) We" cal 1S FAC
@ b's pnd
OTM LM et ea aetteoM- Lb eT NLT -4
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Development Application IDAS Forms 1 & 6.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 12 pages
Page 2
I’
ODD
1. What is the nature of development proposed? (tick all applicable box/es)
D material change of use of premises
D }uilding work
~operational work
D reconfiguring lot a
2. What type of approval is being sought?
/
development permit D preliminary approval D both-provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
~
D Yes-complete table A and then go to question 5
Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
0.treet address/lot on the plan
L’1-e:f PQ3/1 2__
D street address/lot onplan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description Local government area
(e.g. Logan, Cairns)
Unit Street Street name and official suburb/ Post- Lot no. Plan type
no. no. locality name code and plan no.
I ~&1L s.~ 2OJ7 rq]1/2- ~4,vt!ji//r.lC ~
4-<)"73
2 Application details-IDAS form 1
Version 1.0 18December 2009
[OCR of page images]
LIL
1. What is the nature of development proposed? (tick all applicable box/es)
[_]__ material change of use of premises
EL] Auilding work
operational work
| reconfiguring a lot
2. What type of approval is being sought?
ry development permit CL preliminary approval LE] both—provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
4
LE] Yes—complete table A and then go to question 5
Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises _
- . Aa ra)
[7 street address/lot on the plan CUA ? P A S/ / a
| street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description | Local government area
Unit | Street | Street name and official suburb/ | Post- Lot no. Plan type (e.g. Logan, Calrns)
no. no. locality name code and plan no.
( | €erer 67. G573 277 PRil2| S9~SH/NE corto
2 Application details—IDAS form 1
Version 1.0 18 December 2009
Page 3
DDD
Table C-premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)
Coordinates Zone Datum Local government
(note:place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
D GDA94
D WGS84
D other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
c/Jy.lDp~ Itf)lX-?
6. Current use/s of the premises (e.g.vacant land, house, apartment b
fb11 v-
7. Provide a brief description of the proposal (ey-six unit apartm~uilding, 30 lot residential subdivision etc.)
I "
I .-,--
~t-’G-
(~)"’.
8. Is owner’s consent required for this application? (refer to notes at the end of this form for more information)
r
D No Do~ )1/VovJ Cf -7" /tno ;t/f
D Yes-complete either table D, table E or table F as applicable
67-v/\/{ye
Table D
Name of owner/s of the land
7-- ~6L ;
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
/2-
3 Application details-IDAS form 1
Version 1.0 18Oecember 2009
[OCR of page images]
LIL
Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)
Coordinates Zone Datum Local government
(note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
C] GDA94
[_] wese,
LC] other
wh Total area of the — on which the development is proposed (indicate hectares or m?)
[i THEE) EB-P7 Shor? B SO L(WEY Nik) TA9-A 2G ws,
LK 2s Der)
6. Current use/s of the premises (e.g. vacant land, house, apartment bbilding, cane farm, etc.)
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
| *< ( bep)
8. Is owner’s consent required for this application? (refer to notes at the end of this form for more information)
LT Dont HW hae (vw 7 Ho
LE] Yes—complete either table D, table E or table F as applicable OWN
Table D
Name of owner/s of the land DAY (2 Can CHREL LA LVI
1/We, the above-mentioned owner/s of the land, consent to the making of this application.
Le.
Signature of owner/s of the land
a 2 bye
f f f—
Date Z/ [3 fie
2 Application details—IDAS form 1
Version 1.0 18 December 2009
Page 4
DDD
Table E
Name of owner/s of the land
I
D The owner’s written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
I
D By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.
9. Does the application involve a state resource? (e.g.the application involves state land, or taking quarry materials.
Refer to
;he notes at the end of this form for more information)
~o D Yes-complete table G
Table G-state owned resources (provide details for each state resource in a separate table)
Nature of state-owned resource
Nature of evidence required (tick the
applicable box and attach a copy of the
evidence to this form)
D Evidence of an allocation of, or an entitlement to, the resource
Evidence the chief executive of the department administering the
D
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource
D Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource
10. Identify if any of the following apply to the premises (tick applicable box/es)
D adjacent to a water body, watercourse or aquifer (e.g.creek, river, lake, canal)-complete table H
D on strategic port land under the Transport Infrastructure Act 1994-complete table 1
D in tidal water area-complete table)
a
Table H Name of water body, watercourse or aquifer
~
-.....,.
4 Application details-/DAS form 1
Version 1.018 December 2009
[OCR of page images]
LIL
Table E
Name of owner/s of the land
| The owner’s written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
| By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials.
Refer to the notes at the end of this form for more information)
ne LE] Yes—complete table G
Table G—state owned resources (provide details for each state resource in a separate table)
Nature of state-owned resource
Nature of evidence required (tick the
applicable box and attach a copy of the Cl
Evidence of an allocation of, or an entitlement to, the resource
evidence to this form)
Cl Evidence the chief executive of the department administering the
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource
LJ Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource
1o. Identify if any of the following apply to the premises (tick applicable box/es)
| adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H
| on strategic port land under the 7ransport /nfrastructure Act 1994—complete table |
| in a tidal water area—complete table J
Table H Name of water body, watercourse or aquifer
4 Application details—IDAS form 1
Version 1.0 18 December 2009
Page 5
ODD
Table I Lot on plan description for strategic port land Port authority for the lot
Table J Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
11. Are there any existing easements on the premises? (e.g.for vehicular access, electricity, overland flow, water, etc.)
D Yes-ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any services)
BNO D Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to notes at the end of this
form
fO’)rlore information)
~O-gO to question 15
DYes
14. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information)
D Yes-complete table K and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form
Table K Amount paid Date paid QLeave Project Number (6digit number starting with A, B,
E, Lor P)
15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of
the
SUtalnable PlanningAct 2oo9?
6NO
D Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
5 Application details-IDAS form 1
Version 1.0 18December 2009
[OCR of page images]
LILI
Table | Lot on plan description for strategic port land Port authority for the lot
Table J Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.)
[no | Yes—ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any services)
7 No [| Yes—ensure the nature, location and dimension of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to notes at the end of this
form for more information)
[H No-e0 to question 15 | Yes
14. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information)
F
[A v0
Yes—complete table K and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form
Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B,
E, L or P)
15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of
the Sustainable Planning Act 2009?
Aw
| Yes—please provide details below
Name of local government Date of written notice given | Reference number of written notice given
by local government by local government (if applicable)
5 7 Application details—IDAS form 1
Version 1.0 18 December 2009
Page 6
DDD
16. List below all of the forms and supporting information that accompany this application (include alllDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
does not apply for applications made on.line using Smart eDA)
Description of attachment or title of attachment Method of lodgement to
~ssm~t manager
fblLh .
(f?6 -/)
""--
/
17. Applicant’s declaration
L
By making this application, I declare that all information in this application is true and correct (note:it is unlawful to
provide false or misleading information).
Notes for completing this form
Question 8:
Section 263 of the Sustainable PlanningAct 2009sets out when the consent of the owner of the land is required for an
application. Section 260(1)(e) of the Sustainable PlanningAct 2009 provides that if the owner’s consent is required
under section 263,then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.
. Owner’s consent is not required for a mobile and temporary ERA.
Question 9:
. Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.
Question 13:
. The Building and Construction Industry (Portable Long Service Leave)Act 1991 prescribes when the portable long
service leave levy is payable.
. The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
. The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
. Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further
information contact QLeave on 1800 803481 or www.qleave.qld.gov.au.
6 Application details-IDAS form 1
Version 1.0 18December 2009
[OCR of page images]
LILI
16. List below all of the forms and supporting information that accompany this application (include all IDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
does not apply for applications made on-line using Smart eDA)
Description of attachment or title of attachment Method of lodgement to
assessment manager
tOLAy LZ ( [S7)
17. Applicant’s declaration
(7 [ey making this application, | declare that all information in this application is true and correct (note: it is unlawful to
provide false or misleading information).
Notes for completing this form
Question 8:
¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an
application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.
© Owner’s consent is not required for a mobile and temporary ERA.
Question 9:
e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.
Question 13:
e The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
e The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
e Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further
information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au.
6 Application details—IDAS form 1
Version 1.0 18 December 2009
Page 7
DDD
Privacy-the information collected in this form will be used by the Department of Infrastructure and Planning (DIP)in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009)or as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To
I I Cou ncH. I have been engaged as the pdvate certifier for the buHd Ing work referred
to in this application
Building
Date of engagement Name BSA Certification license number
classificationjs
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount paid form sighted by Name of officer who
Description of the work Date paid
Number ($) assessment sighted the form
manager
The Sustainable PlanningAct 2009(SPA)is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
7 Application details-IDAS form 1
Version 1.0 18December 2009
[OCR of page images]
LIL
Privacy—the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to /nformation Act 2009) or as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To
Reference numbers
Council. | have been engaged as the private certifier for the building work referred
to in this application
Date of engagement
Name
BSA Certification license number
Building
classification/s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Description of the work
QLeave Project
Number
Amount paid
($)
Date receipted
form sighted by
assessment
manager
Date paid
Name of officer who
sighted the form
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Application details—IDAS form 1
Version 1.0 18 December 2009
Page 8
111111 Integrated Development Assessment System form
Building or operational work assessable against
a planning scheme-IDAS form 6
(SustainablePlanningAct 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against a
planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
.
complete Application details-IDAS form 1
.
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable PlanningAct 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
D building work-complete table A iperational work-complete table B
Table A
What is the nature of the building work made assessable in the planning scheme (e.g.building, repairing, altering,
underpinning, moving or demolishing a building)?
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
D development permit D preliminary approval
Are there any current approvals associated with this application? (e.g. material change of use)
List of approval referencejs Date approved Date approval lapses
Department of Infrastructure and Planning Qplan ll\\... Queensland
’l.\’" Government
[OCR of page images]
| | | | Integrated Development Assessment System form
Building or operational work assessable against
a planning scheme—IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against a
planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
e complete Application details—/DAS form 1
e complete any other forms relevant to your application
e provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic port land under the 7ransport Infrastructure Act 1994.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
| building work—complete table A [serena work—complete table B
Table A
What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
[_] development permit L] preliminary approval
Are there any current approvals associated with this application? (e.g. material change of use)
List of approval reference/s Date approved Date approval lapses
Government
Department of Infrastructure and Planning Ween
Page 9
DDD
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
D road works
D stormwater
D water infrastructure
D drainage works D earthworks D sewerage infrastructure
D landscaping D signage ~Iearing vegetation under the planning scheme
D other-provide details
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
atta~ent this form detail each approval request)
to to
~ development permit D preliminary approval D both-specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
~NO D Yes-specify the number of lots being created
Are there any current approvals associated with this application? (e.g.material change of use)
~ D Yes-provide details below
List of approval reference/s Date approved Date approval lapses
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ S ()
3. Confirm that the following mandatory supporting information accompanies this application
Confirmation of Method of
lodgement lodgement
All applications for operational works
/
site plans drawn to scale which show the following: ~onfirmed
. the location and site area of the land to which the application relates
(relevantland)
. the north point
. the boundaries of the relevant land
. the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note:numbering is required
for all lots)
2 Building or operational work assessable against a planning scheme-IDAS form 6
Version 1.0 18December 2009
[OCR of page images]
LILI
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
| road works | stormwater | water infrastructure
L] drainage works | earthworks CE] sewerage infrastructure
| landscaping | signage [oY clearing vegetation under the planning scheme
C] other—provide details
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
development permit CJ preliminary approval LE] both—specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
PT No | Yes—specify the number of lots being created
Are there any current approvals associated with this application? (e.g. material change of use)
[wo | Yes—provide details below
List of approval reference/s Date approved Date approval lapses
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ S S 6
3. Confirm that the following mandatory supporting information accompanies this application
Confirmation of Method of
lodgement lodgement
All applications for operational works
site plans drawn to scale which show the following: [confirmed
e the location and site area of the land to which the application relates
(relevant land)
e the north point
e the boundaries of the relevant land
e the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is required
for all lots)
2 Building or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009
Page 10
a _ tGhe7 SZ AJ ee SICZTC O7 272 CI 7E PLAY | EGQLEZ ST. PuLeaIA~ BEI 2d nah 4b bb) SYM IWdSP P¥YOQAY <_— 4
Page 11
DDD
.
any existing or proposed easements on the relevant land and their function
.
any access limitation strips
. all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local D confirmed
government’s planning schemes and any other planning documents relevant to
the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing: D confirmed
.
existing and proposed contours
.areas to be cut and filled
. the location and level of any permanent survey marks or reference stations
used as datum for the works
. the location of any proposed retaining walls on the relevant land and their
height
. the defined flood level (if applicable)
. the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing: D confirmed
.
existing and proposed contours
. the centre line or construction line showing chainages, bearings, offsets if the
construction line is not the centreline of the road and all intersection points
. information for each curve including tangent point chainages and offsets,
length, tangent length, superelevation (if applicable) and
curve radii, arc
curve widening (if applicable)
. kerb lines including kerb radii (where not parallel to centreline) and tangent
point changes (where not parallel to centreline)
.
edge of pavement where kerb is not constructed
.
position and extent of channelisation
. location and details of all traffic signs, guideposts, guardrail and other street
furniture
.
pavement markings including details on raised pavement markers
. catch pit, manhole and pipeline locations
.
drainage details (if applicable)
.cross road drainage culverts (if applicable)
. concrete footpaths and cycle paths
. location and details for access points, ramps and invert crossings
.
changes in surfacing material
3 Building or operational work assessable against a planning scheme-/OAS form 6
Version 1.0 18 December 2009
[OCR of page images]
LILI
¢ any existing or proposed easements on the relevant land and their function
e any access limitation strips
e all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government’s planning schemes and any other planning documents relevant to
the application
| confirmed
Applications for operational works involving earthworks (filling and excavatin
8)
drawings showing:
e existing and proposed contours
© areas to be cut and filled
e the location and level of any permanent survey marks or reference stations
used as datum for the works
e the location of any proposed retaining walls on the relevant land and their
height
e the defined flood level (if applicable)
e the defined fill level (if applicable)
| confirmed
Applications for operational works involving roadworks
drawings showing:
e existing and proposed contours
e the centreline or construction line showing chainages, bearings, offsets if the
construction line is not the centreline of the road and all intersection points
e information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
e kerb lines including kerb radii (where not parallel to centreline) and tangent
point changes (where not parallel to centreline)
e edge of pavement where kerb is not constructed
e position and extent of channelisation
e location and details of all traffic signs, guideposts, guardrail and other street
furniture
e pavement markings including details on raised pavement markers
e catchpit, manhole and pipeline locations
e drainage details (if applicable)
© cross road drainage culverts (if applicable)
e concrete footpaths and cycle paths
e location and details for access points, ramps and invert crossings
e changes in surfacing material
EL] confirmed
3 Building ore operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009
Page 12
;_.. .... ’_._’._"---’~’--,! Il ~’’’’ ’-t-
-
~_-
~"’1-t i
or" ~ ..
l
,.. ",
1
.-
-:: :
i~
" ~
~ "
r
~, ,
~, I:
III’; , r-
...
.. ’-;’ ..;. f
> ’1
f .... l!’ ~
" .~
"; f’ 0: J
"
i: e:
"
0; ~,
.
!
.
~ "
’I ’~ ." j ..
~. ~ ,;
.""- ~
<<
:l ’..I.
-<.
.. 1:.; .!
, i\
, J’
Ie
"
,5 .,
~
~ ~ ..
., .". ’: { ~
~. , ~ ,
~
.3 ~ h. ...
I.’:
~,-. ~ 17. ’.
V: ~ ,
., ’;;
~
.
~ ll~ ;;" ~
.r; "
"
..
~. J" ~ It\
.. .1<(
~; ~ fl "
:;
I.
;.
.
~
~ l?
,
~,
Ie
’; .’.
~ .. ~
i ;-to _,
.
I’
~’ I~
r
,
t.~ ~.."
.. ( ~.
I~ "
ti f t;,
l’"
,.
-,
Page 13
DDD
Applications for operational works involving public utility services
drawings showing:
D confirmed
.
any existing light poles and power poles
.
any existing underground services
. details of proposed services
. alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
D confirmed
. the location of proposed plant species
.a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
.
planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
. the location and type of any existing trees to be retained
. construction details of planter boxes, retaining walls and fences
. the proposed maintenance period
.
irrigation system details
,J_i.:
:.~
Notes for completing this form:
’.
,-
.~
. This form can also be used for development applications for building works or operational works assessable against
;t)
the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to
mean the land use plan for the airport land.
~~I
Privacy-please refer to your assessment manager for further details on the use of information recorded in this
form.
OFFICE USE ONLY
Date received Reference numbers
c
The Sustainable PlanningAct 2009 is administered by the Department of Infrastructure and Planning. This form and all other
required application materials should be sent to your assessment manager and any referral agencies.
5 Building or operational work assessable against a planning scheme-IDAS form 6
Version 1.0 18December 2009
[OCR of page images]
LiL
Applications for operational works involving public utility services
drawings showing: Cl confirmed
e any existing light poles and power poles
e any existing underground services
e details of proposed services
e alternation to existing services
Applications for operational works involving landscaping works
drawings showing: | confirmed
e the location of proposed plant species
¢ aplant schedule indicating common and botanical names, pot sizes and
numbers of plants
e planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
e the location and type of any existing trees to be retained
¢ construction details of planter boxes, retaining walls and fences
e the proposed maintenance period
e irrigation system details
Notes for completing this form:
e This form can also be used for development applications for building works or operational works assessable against
the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to
mean the land use plan for the airport land.
Privacy—please refer to your assessment manager for further details on the use of information recorded in this
form.
OFFICE USE ONLY
Date received Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other
required application materials should be sent to your assessment manager and any referral agencies.
5 Building or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009