Development Application IDAS Forms 1 & 6
DDD
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
D road works
D stormwater
D water infrastructure
D drainage works D earthworks D sewerage infrastructure
D landscaping D signage ~Iearing vegetation under the planning scheme
D other-provide details
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
atta~ent this form detail each approval request)
to to
~ development permit D preliminary approval D both-specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
~NO D Yes-specify the number of lots being created
Are there any current approvals associated with this application? (e.g.material change of use)
~ D Yes-provide details below
List of approval reference/s Date approved Date approval lapses
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ S ()
3. Confirm that the following mandatory supporting information accompanies this application
Confirmation of Method of
lodgement lodgement
All applications for operational works
/
site plans drawn to scale which show the following: ~onfirmed
. the location and site area of the land to which the application relates
(relevantland)
. the north point
. the boundaries of the relevant land
. the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note:numbering is required
for all lots)
2 Building or operational work assessable against a planning scheme-IDAS form 6
Version 1.0 18December 2009
[OCR of page images]
LILI
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
| road works | stormwater | water infrastructure
L] drainage works | earthworks CE] sewerage infrastructure
| landscaping | signage [oY clearing vegetation under the planning scheme
C] other—provide details
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
development permit CJ preliminary approval LE] both—specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
PT No | Yes—specify the number of lots being created
Are there any current approvals associated with this application? (e.g. material change of use)
[wo | Yes—provide details below
List of approval reference/s Date approved Date approval lapses
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ S S 6
3. Confirm that the following mandatory supporting information accompanies this application
Confirmation of Method of
lodgement lodgement
All applications for operational works
site plans drawn to scale which show the following: [confirmed
e the location and site area of the land to which the application relates
(relevant land)
e the north point
e the boundaries of the relevant land
e the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is required
for all lots)
2 Building or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Development Application IDAS Forms 1 & 6.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.