Council archive · source document
04/4386 - Request to change an existing approval - 40 Avocet pd [As Published] · 152004.4386.02
: 2 7 ae FILECOPY > IDAS C6 CLM 3.2 Any person employed to work on any part of the site that has not been cleared through the satisfying of Condition 3.1, is to be forewarned in writing by the applicant: This waming is to explain that information available to the EPA indicates a risk of residual UXO contamination exists on the site and work, particularly that involving excavation, earthworks or other soil disturbance, should proceed with due caution. It is to state the procedure to be followed by any person finding an object suspected of being explosive ordnance or component thereof: Do not disturb the object. Take action, where appropriate, to prevent it being disturbed by another person. Note its approximate dimensions and general appearance. Safely and clearly mark its location. Note the route to its location. Advise the Police as soon as possible. °3.3 Prior to the signing and sealing of any plan of survey resulting from development of the site, an assessment is to be provided to the Noosa Council by the EPA that any lot to which such plan of survey applies has been remediated or does not need remediation. A report, prepared in accordance with current guidelines, is to be submitted to the EPA by the applicant on the investigation and any remediation conducted, including any conducted to satisfy Condition 3.1, to provide for such assessment. 3.4 No gravel, rock, sand or soil is to be removed from the site without written approval of the EPA. 3.5 The applicant is to advise the above responsibilities to any occupier of the site and, if the applicant or the occupier is not the owner of the site, to the owner. 4 _Reasons for including condition(s) or refusal State full reasons for including condition(s) listed above: The site is part of an area of land within which the Department of Defence has assessed a substantial risk of residual UXO contamination exists. Defence has advised that development and/or land usage re-zoning proposals conceming land parcels within the area should only proceed following the conduct of UXO investigation and clearance activities. Defence maintains a list of commercial UXO search contractors that can carry out this work, As the EPA has no record of the site being further investigated or remediated, it is considered that there remains a possibility of UXO being found on the site. § Additional comments or advice A report submitted in accordance with Condition 3.3 above may include a plan or plans to remediate part or parts of the site by taking action other than remedial searching, ie. where remedial searching may be unwarranted or impracticable. Management plans for large developments may provide for investigation and remediation to be implemented by stages. Applicants may contact either the EPA’s Contaminated Land Unit on (07) 3224 5644 or the Defence UXO Project Office on (07) 3332 5193 for details of UXO contractors listed by Defence.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
04/4386 - Request to change an existing approval - 40 Avocet pd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 407 KB (small file)
- File type
No other editions are linked here.