7 ae

FILECOPY > IDAS C6 CLM

3.2 Any person employed to work on any part of the site that has not been cleared through the
satisfying of Condition 3.1, is to be forewarned in writing by the applicant: This waming is
to explain that information available to the EPA indicates a risk of residual UXO
contamination exists on the site and work, particularly that involving excavation, earthworks
or other soil disturbance, should proceed with due caution. It is to state the procedure to be
followed by any person finding an object suspected of being explosive ordnance or

component thereof:

Do not disturb the object.

Take action, where appropriate, to prevent it being disturbed by another person.
Note its approximate dimensions and general appearance.

Safely and clearly mark its location.

Note the route to its location.

Advise the Police as soon as possible.

°3.3 Prior to the signing and sealing of any plan of survey resulting from development of the site,

an assessment is to be provided to the Noosa Council by the EPA that any lot to which such
plan of survey applies has been remediated or does not need remediation. A report, prepared
in accordance with current guidelines, is to be submitted to the EPA by the applicant on the

investigation and any remediation conducted, including any conducted to satisfy Condition
3.1, to provide for such assessment.

3.4 No gravel, rock, sand or soil is to be removed from the site without written approval of the
EPA.

3.5 The applicant is to advise the above responsibilities to any occupier of the site and, if the
applicant or the occupier is not the owner of the site, to the owner.

4 _Reasons for including condition(s) or refusal
State full reasons for including condition(s) listed above:

The site is part of an area of land within which the Department of Defence has assessed a substantial
risk of residual UXO contamination exists.

Defence has advised that development and/or land usage re-zoning proposals conceming land parcels
within the area should only proceed following the conduct of UXO investigation and clearance
activities. Defence maintains a list of commercial UXO search contractors that can carry out this

work,

As the EPA has no record of the site being further investigated or remediated, it is considered that
there remains a possibility of UXO being found on the site.

§ Additional comments or advice
A report submitted in accordance with Condition 3.3 above may include a plan or plans to
remediate part or parts of the site by taking action other than remedial searching, ie. where remedial

searching may be unwarranted or impracticable. Management plans for large developments may
provide for investigation and remediation to be implemented by stages.

Applicants may contact either the EPA’s Contaminated Land Unit on (07) 3224 5644 or the
Defence UXO Project Office on (07) 3332 5193 for details of UXO contractors listed by Defence.

Used in these records

About this file

File size
407 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

04_4386 - Request to change an existing approval - 40 Avocet pd [As Published].pdf · 407 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.