Bushfire Risk Assmt & Risk Mngt Plan for house at 297 Lawnville Rd, Black Mountain Revision 1 December 2020 ENAM
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Ecological Natural Area Management
8 Bushfire risk management solutions and recommendations
8.1 Bushfire hazard mitigation recommendations: Considerations
As shown above, the house:
• Is in a Potential Bushfire Impact Buffer area on The Noosa Plan Bushfire Overlay,
• Is in a Potential Bushfire Impact Buffer area on Queensland potential bushfire intensity
mapping,
• Is deemed as being in a Bushfire Prone Area and
• Is assessed as with a construction requirement of BAL 12.5 for all building elevations
Accordingly, this section will recommend bushfire mitigation requirements for the above
assessments with reference to legislative requirements detailed in:
• The Noosa Plan 2020 Bushfire Overlay Code,
• Australian Standard AS 3959 Construction of Buildings in Bushfire Prone Areas and
• State Planning Policy 2017.
8.2 Recommendations for the Noosa Plan 2020 Bushfire Overlay Code
It is recommended that:
• The house is sited in a low hazard area in the lot and achieves a setback of 10 metres from
any retained vegetation and
• There is a reliable reticulated water supply to the lot for fire fighting purposes.
As there is no reticulated water supply to the lot for fire fighting purposes, it is recommended that
• The dwelling to have an on-site water volume of not less than 5,000 litres available for fire
fighting purposes, provided in a separate tank, a reserve section in the bottom part of the
main water supply tank, a swimming pool installed immediately upon construction of the
dwelling or a permanent dam.
8.3 Recommendations for Australian Standard AS3959
Australian Standard AS3959 Construction of buildings in bushfire-prone areas specifies Deemed to
Satisfy bushfire resistant methodologies based on the assessed Bushfire Attack Level.
It is recommended that:
• The building solution for all building elevations to address the Deemed to Satisfy
requirements of Sections 3 and 5 of Australian Standard AS3959-2018 Construction of
buildings in bushfire-prone areas
Bushfire Risk Assessment and Management Plan for a house at 297 Lawnville Rd, Black Mountain December 2020
18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.