Council archive · source document
09/0246 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlift) [As Published] · 142009.246
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
zou DATS Le eA sere
iW " Part E ar
RECEIVED,
26 FEB 2009
HG - Tewantin
Titre
‘ Building &/or operational works assessabl4
against a planning scheme
1, Nature of work that requires assessment against a planning scheme:
(L] Building work - Complete Table A DX] Operational work - Complete Table 8
Table B
(i) Whatis the nature of the operational work?
@ {J Roadworks (1 Stormwater (C Water infrastructure (C) Sewerage infrastructure
(J Landscaping (E) Earthworks [) Drainage Works (1) Signage os ly
[ Clearing vegetation under the planning scheme (Other - Specify below ayy
Extension to existing jetty and new pneumatic boat storage device
(ii) What type of approval is being sought? (NOTE: if you have Tndicated multiple operational works in question ()) above and your answers to this
question would be different for different operational work, it may be more appropriate fo provide these details in an attachment to this form)
Dd Development Permit LL Preliminary approval (Both (specify below)
{iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision/?
No ".([] Yes - Specify the number of lots'being created
* (iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot) . " . “
» BXyNo (1 Yes - Complete Table Bla)
@ 2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 15000
‘Ma informaugnl ie B
3. Confirm that the following mandatory information accompanies this application
aR ape
Coniemouen a
eg lodge tient a fies
Plans, andspecifications if applicable, showing the nature ‘and location of the proposed works (including the
extent of any cut and fil) & Confirmed
over the counter
OFFICE USE ONLY
Date Received Reference Numbers [ ‘ |
Advice for completing Part E
General advice
uy Part A must also be completed for all IDAS development applications.
° The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Q1 ‘A development permit authorises ‘development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0246 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlift) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.