Acknowledgement Notice - 010.2010.00000545.001 [As Published] · 132010.545

of 4

Text shows just the words. Original shows the document exactly as it was published.

                                              Officer:          Denis Wallace
                                              Direct Telephone: 5449 5179
                                              Response Address: Locked Bag 72
                                                                Sunshine Coast Mail Centre QLD 4560
                                              Email:            [email protected]
                                              Our Reference:    2010/545

23 April 2010

Des Crawford
169 The Avenue
PEREGIAN SPRINGS 4573




Dear Sir

                                 Acknowledgment Notice
                                 Sustainable Planning Act 2009
Council acknowledges receipt of your application.
This Acknowledgment Notice has been prepared in accordance with the SustainablePlanning Act
2009 and contains information relevant to the processing and assessment of the application.
The following details are confirmed:

1        APPLICATION DETAILS

    Application No:                2010/545
    Street address:                1 Hill Street and 162 Edwards Street SUNSHINE BEACH
    Real property description:     LOTS 106 & 107 RP: 94566
    Planning Scheme:               The Noosa Plan

2        TYPE OF DEVELOPMENT

The application seeks development approval for:
        Development Permit for a Material Change of Use - Multiple Housing Type 4 - 6 units
3        IMPACT ASSESSMENT

    Will Impact Assessment be required?                    Yes




C:\DOCUME~1\Tsweeney\LOCALS~1\Temp\BCL    Technologies\Easypdf    5\@BCL@B4084D2B\@[email protected]
                                    Version 1 January 2010                          Page 1 of 4
Full text of the other 3 pages

Page 2

                                                 -2-                                   2010/545


4      PUBLIC NOTIFICATION DETAILS

 Is Public Notification Required?                         Yes
 Refer to the Explanatory Note for the Public Notification Stage.
 Please note that Public notification procedures must not commence until the information and
 referral stage has been satisfied.
 Details of adjoining landowners will be provided on request at the time of commencement of
 public notification.

5      REFERRAL AGENCIES
Based on the information accompanying the lodged application, referral is required to the following
IDAS referral agencies. Accordingly, you are required to forward a copy of the application, this
Acknowledgement Notice and any applicable referral agency application fee, to the referral agency
within twenty (20) business days. After complying with the above the applicant must give the
assessment manager written notice of the day the applicant referred the application to each referral
agency.
Schedule 7, Table 2
     Reason for            Relevant          Referral        Referral        Agency Address
      Referral            Regulation          Type           Agency
 Material change      Sustainable          Concurrence     DERM          Department of
 of use -             Planning                                           Environment and
 Contaminated         Regulation 2009 -                                  Resource Management
 land (unexploded     Schedule 7, table                                  Ecoaccess Customer
 ordnance)            3, item 11                                         Service Unit
                                                                         PO Box 15155
                                                                         CITY EAST QLD 4002

6      INFORMATION REQUEST
A further information request will not be made by the assessment manager.
Regardless of this advice, any concurrence agency for the application may make an information
request.

7      OTHER DETAILS
You can follow the progress of this application online at www.sunshinecoast.qld.gov.au . The “PD
Online” page can be accessed via "Quick Links" on the left hand side of the screen. A disclaimer will
appear, upon clicking “agree”, a search for a development application or property address can be
carried out.

If you have any further queries in relation to the above, please contact Denis Wallace on the above
number.
Yours faithfully,



Denis Wallace
SENIOR DEVELOPMENT PLANNER

C:\DOCUME~1\Tsweeney\LOCALS~1\Temp\BCL    Technologies\Easypdf   5\@BCL@B4084D2B\@[email protected]
                                    Version 1 January 2010                         Page 2 of 4

Page 3

                                                             -3-                                           2010/545




                                                 Explanatory Note - Public Notification Procedures
                                                 SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
                                                 REGULATION 2009 (PLEASE NOTE THAT THIS IS AN EXPLANATORY
                                                 NOTE ONLY AND SHOULD BE READ IN CONJUNCTION WITH THE
                                                 ABOVE STATED ACTS)


1      INTRODUCTION
                                                                   296 (1) If there are no concurrence agencies and the
The purpose of this explanation sheet is to provide                assessment         manager     has      stated     in  the
guidance to applicants on the public notice procedures             acknowledgment notice that the assessment manager
under Chapter 6, Part 4 ‘notification stage’ of the                does not intend to make an information request, the
Sustainable Planning Act 2009 (SPA). The SPA and its               applicant may start the notification stage as soon as
Regulations, sets out the requirements for the giving of           the acknowledgment notice is given.
public notice. These guidelines quote much of the
relevant SPA and Regulation material.                              (2)         If no information requests have been made
                                                                   during the last information request period, the
If there is doubt about a particular public notice aspect,         applicant may start the notification period as soon as
the applicant should refer to the SPA or have the public           the last information request period ends.
notice procedures undertaken by a consultant who is
                                                                   (3)         If an information request has been made
familiar with the SPA requirements.
                                                                   during the information request period, the applicant
Whilst every care has been taken in preparation of this            may start the notification period as soon as the
explanation sheet, finally it is the applicant's                   applicant gives-
responsibility to ensure that the procedures are                   a. all information request responses to all information
correctly followed. Council cannot accept any                           requests made; and
responsibility for incorrect giving of public notice.
                                                                   b. copies of the responses to the assessment
2       PURPOSE OF PUBLIC NOTIFICATION                                  manager.
Section 294 of the SPA indicates as follows:                       5        WHAT IS PUBLIC NOTICE
294     The notification stage gives a person -                    The following is extracted from Section 297 of the
a. the opportunity to make submissions, including                  SPA:
    objections, that must be taken into account before             297 (1) The applicant or, with the applicant’s written
    an application is decided; and                                 agreement, the assessment manager must-
b. the opportunity to secure the right to appeal to the            (a) publish a notice at least once in a newspaper
    court about the assessment manager’s decision.                 circulating generally in the locality of the land; and
3       OVERVIEW OF PUBLIC NOTIFICATION                            (b) place a notice on the land in the way prescribed
        PROCEDURES (PUBLIC NOTICE)                                 under a regulation; and
There are three distinct tasks to be undertaken in                 (c) give a notice to the owners of all land adjoining the
carrying out the public notice requirements:                       land.
                                                                   (2) If the assessment manager carries out notification
a. Placement of a notice or notices on the land.
                                                                   for the applicant, the assessment manager may
b. Notification by letter to adjoining owners.                     require the applicant to pay a fee, of not more than the
c. Placing a notice in a local newspaper.                          assessment manager’s reasonable costs for carrying
After the notification period has ended, the applicant             out the notification.
must give the assessment manager written notice that               (3) For subsection (1)(c), roads, land below high-water
the applicant has complied with the requirements of                mark and the beds and banks of rivers are taken not
the public notification (public notice) provisions of the          to be adjoining land.
SPA.                                                               (4) In this section owner, for land adjoining the land
One key aspect to note is that an application can                  the subject of the application, means-
automatically lapse if the public notification period is           (a) if the adjoining land is subject to the Integrated
not commenced within 20 business days of the                       Resort Development Act 1987 or the Sanctuary Cove
completion of the relevant preceding stage.                        Resort Act 1985—the primary thoroughfare body
                                                                   corporate; or
4       WHEN CAN NOTIFICATION STAGE START
                                                                   (b) if the adjoining land is subject to the Mixed Use
Section 296 of the SPA indicates when the notification             Development Act 1993—the community body
period can start. Where Council is the assessment                  corporate; or
manager, advice will be forwarded to the applicant,                (c) subject to paragraphs (a) and (b), if the adjoining
wherever possible, confirming that the notification                land is subject to the Building Units and Group Titles
period may be commenced.                                           Act 1980—the body corporate; or



C:\DOCUME~1\Tsweeney\LOCALS~1\Temp\BCL    Technologies\Easypdf                5\@BCL@B4084D2B\@[email protected]
                                    Version 1 January 2010                                      Page 3 of 4

Page 4

                                                           -4-


(d) if the adjoining land is, under the Body Corporate           (a) the boundary between the land and any road
and Community Management Act 1997, scheme land                   adjoining the land; or
for a community titles scheme—                                   (b) if the only access to the land is across other land—
(i) the body corporate for the scheme; or                        the boundary between the other land and any road
(ii) if the adjoining land is scheme land for more than          adjoining the other land at the point of access.
1 community titles scheme—the body corporate
for the community titles scheme that is a principal              7       NOTICE IN THE NEWSPAPER & NOTICES
scheme; or                                                               TO ADJOINING OWNERS
(e) if there is a time share scheme, as defined under
the Local Government Act, for a structure on the                 The following is an extract from Section 299 of the
adjoining land—the person notified to the local                  SPA:
government concerned as the person responsible for               (2)       Each notice given to the owner of adjoining
the administration of the scheme as between the                  land must be given at about the same time as the
participants in the scheme; or                                   notice is published in the newspaper and placed on
(f) if the adjoining land is land being bought from the          the land.
State for an estate in fee simple under the Land Act             (Refer to the approved form of the notice at
1994—the buyer; or                                               www.dip.qld.gov.au/spa)
(g) if the adjoining land is land granted in trust or
reserved and set apart and placed under the control of           (3)       All actions mentioned in subsection (2) must
trustees under the Land Act 1994—the trustees of the             be completed within 5 business days after the first of
land; or                                                         the actions is carried out.
(h) if paragraphs (a) to (g) do not apply—the person
for the time being entitled to receive the rent for the          8       NOTIFICATION PERIOD
land or who would be entitled to receive the rent if the         Section 298 of the SPA indicates as follows:
land were let to a tenant at a rent.
                                                                 298 Notification period for applications
Please ensure that all public notices that are                   (1) The notification period for the application must
published in the newspaper, placed on the land,                  be at least—
and given to adjoining land owners clearly state                 (a) 30 business days starting on the day after the last
that:                                                            action
(a)       written submissions        may    be   made            under section 297(1) is carried out, if any of the
          electronically; and                                    following apply for the application—
                                                                 (i) there are 3 or more concurrence agencies;
(b)       electronic submissions are to be sent to               (ii) all or part of the development—
          mailto:[email protected]                   (A) is assessable under a planning scheme; and
                                                                 (B) is prescribed under a regulation for this
6        NOTICE ON LAND                                          subparagraph;
(1) The following is an extract from the Sustainable             (iii) all or part of the development is the subject of an
Planning Regulation 2009 and prescribes, for section             application for a preliminary approval mentioned
297(1)(b) of the SPA, requirements for the placing of a          in section 242; or
notice on land:                                                  (b) if paragraph (a) does not apply—15 business days
                                                                 starting on the day after the last action under section
(2) The notice must be—                                          297(1) is carried out.
(a) placed on, or within 1500mm of, the road frontage            (2) The notification period must not include any
for the land; and                                                business day
(b) mounted at least 300mm above ground level; and               from 20 December in a particular year to 5 January in
(c) positioned so that it is visible from the road; and          the
(d) made of weatherproof material; and                           following year, both days inclusive.
(e) at least 900mm in height and 1200mm in width.
(3) The lettering on the notice must be as stated on
the approved form of the notice. (Refer to the                   9      COMPLETION OF NOTIFICATION PERIOD
approved form of the notice at                                   Section 301 of the SPA indicates as follows:
www.dip.qld.gov.au/spa)
(4) If the land has more than 1 road frontage, a notice          If the applicant carries out notification, the applicant
must be placed on each road frontage for the land.               must, within 20 business days after the notification
(5) The applicant must maintain the notice from the              period ends, give the assessment manager written
day it is placed on the land until the end of the                notice that the applicant has complied with the
notification period.                                             requirements of this division.
(6) In this section—
road frontage, for land, means—




C:\DOCUME~1\Tsweeney\LOCALS~1\Temp\BCL Technologies\Easypdf 5\@BCL@B4084D2B\@[email protected] of 4
      Version 1 January 2010

Used in these records

About this file

File size
48 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Acknowledgement Notice - 010.2010.00000545.001 [As Published].pdf · 48 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.