Council archive · source document
Info Response · MCU19/0008
Item 2. The application states that the proposal plans detail the areas of non‐compliance with
regard to building height in storeys. It is noted that the proposal may also be non‐
compliant with regard to the building height definition in Noosa Plan. Building height is
measured from natural ground and finished ground levels.
‐ A contour and detail plan (show on site plan) that clearly details proposed RL’s.
Response
In response to this request, an amended set of plans have been prepared which clearly indicate
proposed RL’s.
Item 3. The application states that the proposal plans detail the areas of non‐compliance with
regard to building height in storeys. It is noted that the proposal may also be non‐
compliant with regard to the building height definition in Noosa Plan. Building height is
measured from natural ground and finished ground levels.
‐ Elevations and sections that clearly label the areas of non‐compliance relating to building
height and storeys relative to natural and finished ground levels relating to the
redevelopment of the site. Identify the third storey component of the building.
Response
In response to this request, an amended set of plans have been prepared which clearly indicate
areas of non‐compliance in terms of building height. In line with this, it is important to note that
following discussions between JRA and Council, these plans have been modified to feature a design
with a reduced height/bulk and scale.
Item 4. The application states that the proposal plans detail the areas of non‐compliance with
regard to building height in storeys. It is noted that the proposal may also be non‐
compliant with regard to the building height definition in Noosa Plan. Building height is
measured from natural ground and finished ground levels.
‐ Provide a visual analysis of how 3 storeys will be viewed from the beach.
Response
In response to this request, an amended set of plans have been prepared which clearly indicate how
the dwelling house will be viewed from the beach. In addition to this, these plans also indicate a
design with a reduced height/bulk and scale which has been developed following discussions
between JRA and Council.
COASTAL BUILDING LINE
Item 5. The proposal intends to extend eastward of the Coastal Building Line. Specific Outcome
O20 of the Natural Hazards and Natural Resources Overlay Code only allows uncovered
Bartley Burns Town Planning Pty Ltd ABN 36 413 954 407
1300 051 189 [email protected] www.bartleyburns.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Info Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 179 KB (small file)
- File type
No other editions are linked here.