Council archive · source document
Decision Notice OPW20 145 06 (As Published) · OPW20/0145.06
Site Access and Driveways
36. Driveway crossovers must be constructed generally in accordance with Council’s Standard
Drawing RS-051
37. Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf, and must be maintained by the developer until established.
38. The following must be complied with during the construction of the required
crossovers/driveways:
a. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete.
b. The driveway must be constructed so as not to concentrate stormwater runoff onto
neighbouring properties
c. Underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway
d. Where there is an existing pedestrian path, a matching crossfall must be provided for
the driveway on the alignment of the path, for the full width of the path
Earthworks and Retaining Walls
39. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical testing
undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing
the Plan of Survey.
40. Fall protection must be provided to retaining walls that are over 1m high.
41. Slope and batters are a maximum grade of:
a. 1 in 6 where in proximity to waterbodies
b. 1 in 4 for grassed areas.
c. 1 in 3 for planted areas
d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
42. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
43. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (eg by blocking or interfering with natural overland flows).
44. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Bioretention Basins - Construction
45. The bioretention devices must be constructed in accordance with the document Construction
and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
Design, 2009). Option 1 of the staged construction and establishment methods is to be
followed as documented in the guidelines
Page 17 of 35
Document Set ID: 24395463
Version: 4, Version Date: 03/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW20 145 06 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 957 KB (small file)
- File type
No other editions are linked here.