Energex).
Should you require any further information on the above matter, please contact Harriet
Veal on 0427 293 604 or via email at [email protected].au-
Yours faithfully,
WarreatVeak
Harriet Veal
Town Planner
Have you seen our fact sheets?

Document Set ID: 24395463

General Advice:

= Compliance with the Electrical Safety Act 2002, including any Code of Practice
under the Act and the Electrical safety Regulation 2013 including any safety
exclusion zones defined in the Regulation is mandatory

Should any doubt exist in maintaining the prescribed clearance to the overhead

conductors and electrical infrastructure then the applicant is obliged under the
Act to seek advice from Energex.

= Any costs incurred by Energex as a result of the works on the easement are to
be met by the property Developer / owner.

= This response does not constitute an approval to commence any works within
the easement. Consent to commence works relevant to the conditions of the
easement is required. All works on easement (including but not limited to

earthworks, drainage and detention basins, road construction, underground and

overhead services installation) require detailed submissions, assessment, and
consent (or otherwise) by Energex.

= All works proposed to be undertaken in close proximity to overhead or

underground electrical lines are to be undertaken in accordance with Energex's

Works Practice Manual WP1323. This document refers to various standards,
guidelines, calculations, legal requirements, technical details, and other
information relevant to working near high voltage infrastructure. A copy of

WP1323 can be found online via Energex's document library (Document library

‘See the ‘considerations when developing around electricity infrastructure’ section of our website
Jawa energex. com aulreferralagency

Version: 4, Version Date: 03/02/2026

Page 32 of 35

Used in these records

About this file

File size
957 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice OPW20 145 06 (As Published).pdf · 957 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.