Appendix 4- SWMP

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                              ingeniir


 STORMWATER
 MANAGEMENT
 PLAN
245001-SMP-01

Proposed Duplex
20 Ventura Street
Sunrise Beach 4567
Lot 91 on RP132135




Ingeniir Pty Ltd
SEPTEMBER 25
Authored by: Daniel Kenna
for and on behalf of Ingeniir Pty Ltd.




                                                 Ingeniir Pty Ltd | 245001-SMP-01
                   ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                            Page 1 | 15
Log in to download the original file

Appendix 4- SWMP.pdf · 4.8 MB (large file)

The download may take up to a minute.

Full text of the other 26 pages

Page 2

                                                                                                              ingeniir



 DOCUMENT INFORMATION
 Document Reference      Date                   Author                     Reviewed                          Review Date
 245001-SMP-01           12/09/2025             Daniel Kenna               Daniel Kenna                      22/09/2025


© Ingeniir Pty Ltd (2025) All Rights Reserved. Copyright in the whole and every part of this document belongs
to Ingeniir Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any
manner or form or in or on any media to any person without the prior written consent of Ingeniir Pty Ltd.


 DOCUMENT DETAILS & CERTIFICATION
 Report Title                Stormwater Management Plan
 Document Reference          245001-SMP-01
 Street Address              20 Ventura Street, Sunrise Beach
 Legal Description           Lot 91 on RP132135
 Prepared for                Michael & Donna Grace
 Revision                    01
 Date                        12/09/2025
 Prepared By                 Daniel Kenna
 For and on behalf of        Ingeniir Pty Ltd
 Certified By                Daniel Kenna
 Qualifications              RPEQ 15522
 For and on behalf of        Ingeniir Pty Ltd
 Signed
 Date                        22/09/2025




                                                Ingeniir Pty Ltd | 245001-SMP-01
                  ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                           Page 2 | 15

Page 3

                                                                                                           ingeniir

EXECUTIVE SUMMARY

Ingeniir Pty Ltd (Ingeniir) have been engaged by Michael & Donna Grace to produce this Stormwater
Management Plan (SMP) in support of the Material Change of Use application for the Proposed Duplex at 20
Ventura Street Sunrise Beach 4567, Lot 91 on RP132135.

This report is comprised of stormwater quantity and quality assessments. The quantity assessment is
undertaken to confirm a ‘non-worsening’ discharge of peak flow from the developed site. The quality
assessment is undertaken to determine the required stormwater treatment measures to be implemented on
site to comply with Local and State Authority requirements.

Stormwater Quantity Calculations consider storm events up to and including the 1% AEP and 1% AEP at the
year 2100 storm event (adopted increase of 120%). The purpose is to ensure that the existing infrastructure
and/or downstream properties are not adversely affected by the proposed development.

The stormwater quantity assessment determined that a measurable increase to the impervious area will
occur due to the proposed development which would result in an increase to peak discharge rates if no flow
mitigation were implemented. On-site detention measures are proposed for this development to maintain or
improve on pre-development peak stormwater discharge rates.

Currently no quality stormwater management measures are in place for the existing subject site. As the
proposed development area is less than 2500m2; best-management practice for stormwater treatment
measures are to be implemented on site in accordance with current Industry Best Practice, WSUD Engineering
Guidelines and State and Local Stormwater Quality Objectives.

All relevant standards and guidelines are addressed in this Stormwater Management Plan including;
criteria from the Sunshine Coast Regional Council Planning Scheme Policy, Queensland Urban Stormwater
Quality Planning Guidelines (2010), Queensland Urban Drainage Manual (QUDM) and the Australian Rainfall
and Runoff Guidelines.




                                              Ingeniir Pty Ltd | 245001-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 3 | 15

Page 4

                                                                                                           ingeniir

1.    INTRODUCTION

Ingeniir Pty Ltd (Ingeniir) have been engaged by Michael & Donna Grace to produce this Stormwater
Management Plan in relation to the Proposed Duplex Development at 20 Ventura Street Sunrise Beach 4567,
Lot 91 on RP132135.

There are no current development approvals over the site.


2.    EXISTING SITE CONDITIONS
The site is legally described as Lot 91 on RP132135, with an allotment area of 607m2. The site is located
within the Noosa Shire Council local government area.




                                                  Plate 1: Site Locality



The site currently has an existing residential dwelling and driveway on site. The site elevation ranges from
31.70 in the rear (eastern side) to 36.50m at the front (Westernside) of the allotment. Currently the roof
water discharges to the ground and overland flow drains into the David Low Way Road Reserve. Once the
flow enters David Low Way, the flows travel North along Kerb and channel and is picked up by existing gully
pits into the existing underground network.

The lawful point of discharge for the site is the David Low Way Road Reserve.


                                              Ingeniir Pty Ltd | 245001-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 4 | 15

Page 5

                                                                                                             ingeniir

3.        DESIGN OBJECTIVES
The objective of this report is to demonstrate that the project can comply with the Noosa Shire Council’s
codes and policies in relation to stormwater management through the implementation of the following
objectives;

      •   Maintain stormwater quality in accordance with local and state policies
      •   Manage and Mitigate quantities of peak stormwater discharge
      •   Adopt Water Sensitive Urban Design (WSUD) principles throughout
      •   Stormwater Harvesting and re-use for landscaping and alternative uses
      •   Provide immunity and resilience from flooding

This report outlines the design requirements to achieve the above objectives in a site-specific context.


4.        STORMWATER STRATEGY
The site is situated approximately 140m from the low point/sag inlets within David Low Way (at
approximately Vernon Street) which discharges into a drainage reserve and then to the Pacific Ocean to the
East. There is stormwater infrastructure in David Low way approximately 140m North of the site however this
is deemed not required or suitable for direct connection as on site detention will be implemented to provide
acceptable kerb discharge rates in accordance with IPWEAQ RSD-201 (RS-081) of 25L/s in a 5% AEP event at
any singular location.

All properties on the Eastern side of Ventura Street are located below the Kerb and channel and flow towards
David Low Way. There are existing multiple dwelling developments immediately adjacent to the North of the
site which and two properties South which also maintain stormwater discharge into David Low Way.

Underground rainwater detention and retention will be provided by Garantia Li-Lo Rainwater Underground
Tanks (or similar tanks of equal storage volume) which will be located under the proposed outdoor area slabs
to maintain a small footprint and maximise deep planted landscaping available for the development and
provide rainwater irrigation to landscaping on the site, as well as hardstand wash down and pool top up.

The proposed roof water discharge to David Low Way is 17L/s for the 5% AEP design event which is well
below the acceptable discharge rate as per the IPWEAQ drawings for discharge to street via a kerb adapter.
Total site discharge rates are improved for all design events at the 5 minute duration which is the AS3500.3
design duration for roof water drainage.


5.        STORMWATER QUALITY
5.1       Construction Phase

The State Planning Policy (DILGP, 2017) Appendix 2 – Stormwater management design objectives
Table A: Construction phase – stormwater management design objectives outlines construction phase
requirements for stormwater quality.

The following manuals (as a minimum) should be read and implemented by any contractor proceeding with
the development construction;



                                                Ingeniir Pty Ltd | 245001-SMP-01
                  ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                           Page 5 | 15

Page 6

                                                                                                            ingeniir

    •   State Planning Policy Appendix 2 Table A – available here
    •   IECA Principles of Construction Site ESC – available here
    •   Water by Design ESC Factsheet Suite – available here
    •   For sites less than 2,500m2; Refer to the Department of Environment and Science Procedural guide,
        Releases to waters from building sites and small construction sites (less than 2,500m2) – available
        here
    •   For sites more than 2,500m2; Refer to the Department of Environment and Science Procedural guide,
        Releases to waters from land development sites and construction sites 2,500m 2 and greater –
        available here

Detailed Erosion and Sediment Control design and plans should be documented by a suitably experienced
professional in conjunction with any application, or prior to commencing with the Operational Works
associated with the proposed development on site.

5.1.1    Soil Cover

Disturbed areas are to be stabilised as soon as possible following construction. Clearing of existing soil cover
shall be limited to only the areas necessary to undertake building work; and cleared as close as possible to the
commencement of the works in that area.

Areas of bare soil not actively being worked on shall be covered to limit erosive actions with mulch (gravel,
straw or wood chip) or sheeting such as plastic or geo-textile.

5.1.2    Stockpile Protection

Stockpiles shall be protected by covering with plastic or geotextile sheeting when not in use, ensuring that
the stockpiles are not placed on top of sediment barriers such as sediment fences and ensuring stockpiles are
not located in overland flow paths.

If unavoidable, run-off is to be directed around the stockpile (not for sites less than 450m2) with a cut-off
drain.

5.1.3    Kerb to allotment groundcover

Exposed soil between the lot boundary and the kerb shall be covered as soon as possible with turf or
temporarily covered with mulch or sheeting.

Stockpiles shall be fully contained within the lot and not on the verge unless specifically approved by the
local authority.

5.1.4    Sediment Control of entry and exit areas

Measures shall be adopted to establish a formal stable entry/exit area such as a rock-pad or shaker grid. Any
formalised entry or exit sediment control point shall be well maintained and appropriate to prevent run-off,
and consist of a rock-pad or shaker grid that is at least 2m wide, and extending from the kerb to the building
pad.



                                               Ingeniir Pty Ltd | 245001-SMP-01
                 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                          Page 6 | 15

Page 7

                                                                                                            ingeniir

For lots with clayey soils, the entry/exit point shall incorporate a geofabric overlaid with 40-75mm diameter
rock laid at least 150mm thick or shaker grid with access to remove accumulated sediments underneath.

Any rock-pads used for construction entry or exits points that are subject to pedestrian movements are to be
covered with an additional layer of 25-50mm diameter gravel within the verge to make it safe for pedestrians.
The formalised access point shall include a bund to direct upslope run-off to a sediment trap within the lot
and be maintained to prevent clogging of the surface with sediment that has been deposited.

5.1.5     Stormwater inlet protection

For lots which the proposed development includes the installation of internal stormwater inlet pit(s), the
pit(s) and associated piped drainage shall be established as early as possible within the works program to
formalise the site drainage.

Internal and external stormwater pits (within 40m of the site) shall be protected to prevent entry of coarse
sediment into the pit by covering the grated inlet with a filter cloth and surrounding the pit with a sediment
collection pit; combined with the use of coir logs or similar for kerb inlets. The pit(s) should be maintained in
good working order.

5.1.6     Coarse Sediment Barriers

Sediment devices are to consist of a sediment fence for the entire downstream perimeter of the works as a
minimum. Sediment fences should incorporate the barrier fabric being buried 200mm minimum into the
ground and projecting 450mm above the ground; with supporting posts at 2m centres and upslope returns at
the end of the fence typical.

For smaller sites, alternative coarse sediment barriers such as mulch or rock berms, sediment socks, fibre
rolls, or low sediment fences can be considered.



5.2     Operational Phase

The site has a lot area of 607m2 and as such does not trigger local or state requirements for operational
treatment objectives for stormwater quality.

Noosa City Council (SC6.6.2) requires a minimum of 3,000kL per dwelling for retention and re-use which will
be provided in conjunction with underground rainwater detention tank. It is proposed that a 7,500L
underground tank be provided for each unit with 3,300L retention and 4,200L detention.

In accordance with the QDC MP4.3 – Supplementary Water Sources for buildings, and the applicable
performance requirements being P11 – P17, the rainwater tanks will be used for external purposes only such
as landscape drip irrigation, pool top up and hardstand wash down/communal uses.

A water balance assessment has been undertaken to determine an appropriate retention volume, using
rainfall records from Caloundra for a 10 year and 1 year period (Refer Appendix 2 | Water Balance




                                               Ingeniir Pty Ltd | 245001-SMP-01
                 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                          Page 7 | 15

Page 8

                                                                                                            ingeniir


Assessment). It is proposed that approximately 2,400L of retention volume be provided per unit, which will
provide more than 95% reliability and is deemed a suitable and practical outcome for installation.


6.    STORMWATER QUANTITY
The development is proposed to incorporate stormwater detention to mitigate the increase in peak discharge
from the site and maintain pre-developed stormwater performance.

The Bureau of Meteorology 2016 IFD service has been used for all analysis in this report.

A Rational Method estimation of the stormwater discharge has been used to estimate the pre-developed
runoff performance of the site. In accordance with Noosa Shire Council recommendations, the detention
analysis has been proportioned to match or improve on the pre-developed flows as determined by the
Rational Method. As it is only roof water that is proposed to be collected and detained, a linear methodology
has been employed with storage volumes calculated in accordance with AS3500.3.

Rational method and detention calculations are presented in Appendix 3 | Rational Method & Detention
Calculations.


6.1     Detention Sizing and Details

The required detention volume that was determined to maintain or improve the pre-development discharge
rates to Dvid Low Way is 7,500L per unit. This is proposed to be comprised of two Garantia Li-Lo Rainwater
Underground Tanks (or equivalent) with properties as listed in Table 1.

                                          DETENTION TANK PROPERTIES
                            Roof/Impervious Area Connected                        100%
                            Eaves Gutter Size                                 1% AEP
                            Number of Tanks                                        2
                            Storage Capacity                               7,500L
                                                                     1250mm (1565mm with
                            Height
                                                                            riser)
                            Length                                        3600mm
                            Width                                           2250mm
                                                                     Garantia Li-Lo Rainwater
                            Example Product
                                                                       Underground Tanks
                                             Table 1: Detention tank properties



The outlet configuration of the tanks is proposed to be constructed of an internal standpipe, with outlet
orifices drilled into the pipe prior to installation into the tank. The outlet details are presented in Table 2.




                                               Ingeniir Pty Ltd | 245001-SMP-01
                 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                          Page 8 | 15

Page 9

                                                                                                                   ingeniir


                                            DETENTION TANK OUTLET DETAILS
                           Feature                              Size                   Height from base
                  Top of Tank/Access                As per manufacturer                       1565mm
                  Top Outlet Overflow                 100mm diameter                   1380mm (in riser)
                  Middle Outlet                        50mm diameter                          970mm
                  Low Flow                             25mm diameter                          550mm
                                              Table 2: Detention tank outlet details

6.2     Detention Results

The peak water elevation achieved in the tanks by the analysis is 1230mm so falls short of discharging via the
top of tank overflow or access point.

The detention tanks are proposed to discharge to David Low way via a 100mm diameter pipes into 3.0m Long
subsoil dispersal outlets, peak discharge rates to David Low way are estimated at 25.80L/s for a 1% AEP
storm which improves the current estimated discharge of 26.36L/s.

                                      WHOLE OF SITE DETENTION SUMMARY
                                  Pre-Development       Post-Development
                  AEP                            Duration                          Duration       Performance
                                  Q (L/s)                              Q (L/s)
                                                  (min)                             (min)
                 63.20%             6.637                   5            6.417                5      -0.22 (97%)
                 39.35%             8.799                   5            8.421                5    -0.378 (96%)
                 18.14%            12.311                   5           11.657                5    -0.654 (95%)
                  10%              14.934                   5           14.061                5    -0.873 (94%)
                   5%              17.921                   5           17.060                5    -0.861 (95%)
                   2%              22.808                   5           22.779                5   -0.029 (100%)
                   1%              26.360                   5           25.432                5    -0.928 (96%)
                1% 2100            31.632                   5           30.686                5    -0.946 (97%)
                          Table 3: Comparison of pre and post development discharges to David Low Way

As demonstrated in Table 3, the proposed detention system successfully mitigates stormwater discharge to
David Low Way to achieve a non-worsening in peak discharge.


7.    FLOODING
The site is in raised elevation locally and has no known Council mapped flood risk. A review of the Noosa Shire
Council’s Intramaps system (accessed 08/09/2025) indicates that the site is not affected by riverine
Flooding or storm tide. Refer Plate 2 for an excerpt of the Council mapping.




                                              Ingeniir Pty Ltd | 245001-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 9 | 15

Page 10

                                                                                                                    ingeniir




                         Plate 2: Noosa Shire Council Flooding and Inundation Extents in the vicinity of the site



8.    CONCLUSION
The proposed development has been analysed to provide design requirements to meet local and state
authority guidelines for stormwater quality and quantity outcomes.

The development proposes to use on site water retention for landscape irrigation, hardstand wash down and
pool top up to satisfy Council’s water quality requirements.

The proposed development can achieve the required design outcomes of the planning scheme policy by
implementing an on-site detention system sized to improve site stormwater discharge rates for all events up
to and including the 1% AEP at 2100.

If you wish to discuss this report and analysis further, please contact Daniel Kenna.

Yours sincerely,




Daniel Kenna
Beng CPEng MIEAust RPEQ 15522 NER 3133685
for and on behalf of Ingeniir Pty Ltd


                                                 Ingeniir Pty Ltd | 245001-SMP-01
                   ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                            Page 10 | 15

Page 11

                                                                                                            ingeniir

9.    LIMITATIONS
This report has been written based on Ingeniir’s understanding of the required scope at the time of writing;
and is written for the purposes of Michael & Donna Grace and not to be used for any other purpose.

To the extent permitted by law, Ingeniir expressly disclaims and excludes liability for any loss, damage, cost or
expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information
contained in this report. Ingeniir does not admit that any action, liability or claim exist or be available to any
third-party, and disclaims any liability resulting from the inaccuracy of third-party information supplied to
Ingeniir for use in this report.




                                               Ingeniir Pty Ltd | 245001-SMP-01
                 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                          Page 11 | 15

Page 12

                                                                                                   ingeniir


Appendix 1 | BoM IFD Data




                                      Ingeniir Pty Ltd | 245001-SMP-01
        ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                 Page 12 | 15

Page 13

Copyright Commonwealth of Australia 2016 Bureau of Meteorology (ABN 92 637 533 532)

All Design Rainfall Depth (mm)
Issued: 5-Sep-25
Location Label:

Requested Latitude

Nearest gri Latitude

-26.41663 Longitude 153.1084
26.4125 (S) Longitude 153.1125 (E)

Exceedance Annual Exceedance Probability (AEP)

Duration Durationinmin  12EY 6EY AEY 3EY 2EY 63.20%
1min 1 1.36 1.54 1.84 2.05 2.35 2.88
2 min 2 2.38 2.65 3.14 3.49 3.99 4.89
3 min 3 3.31 3.71 441 4.91 5.63 6.9
4min 4 4.14 4.67 5.58 6.23 7.16 8.76
5 min 5 4.89 5.53 6.64 7.43 8.54 10.5
10 min 10 7.64 8.76 10.7 12 13.9 17.1
15 min 15 9.47 10.9 13.4 15.2 17.6 21.8
20 min 20 10.8 12.5 15.4 17.5 20.4 25.3
25 min 25 11.9 13.8 17 19.3 22.6 28.2
30 min 30 12.8 14.8 18.3 20.9 24.5 30.7
45 min 45 14.7 17.1 21.3 24.3 28.7 36.4
1 hour 60 16.1 18.8 23.4 26.9 31.9 40.8
1.5 hour 90 18.2 21.2 26.7 30.7 36.7 47.6
2 hour 120 19.8 23.1 29.2 33.7 40.4 52.9
3 hour 180 22.4 26.2 33.2 38.5 46.4 61.5
4.5 hour 270 25.4 29.8 37.9 44.1 53.6 71.8
6 hour 360 27.9 32.8 41.9 48.9 59.5 80.3
9 hour 540 32.1 37.8 48.4 56.7 69.3 94.1
12 hour 720 35.6 41.9 53.9 63.2 774 105
18 hour 1080 41.3 48.8 62.7 73.6 90.3 123
24 hour 1440 46 54.2 69.7 81.8 100 137
30 hour 1800 49.8 58.8 75.5 88.6 109 148
36 hour 2160 53.1 62.6 80.4 94.2 116 158
48 hour 2880 58.4 68.8 88.3 103 127 173
72 hour 4320 65.4 771 99 116 142 193
96 hour 5760 69.5 82.2 106 124 152 207
120 hour 7200 71.9 85.4 111 130 160 217
144 hour 8640 73 87.3 114 134 165 226
168 hour 10080 73.3 88.4 116 138 170 233

50% O.SEY
3.25
5.56
7.83
9.92
11.8
19.3
24.5
28.6
31.9
34.7
41.3
46.3
54.2
60.5
70.8
83
93.1
110
123
144
161
174
185
202
226
242
254
263
271

3.61
6.17
8.69
11
13.1
21.4
27.2
31.7
35.4
38.5
45.8
$1.4
60.2
67.2
78.6
92.1
103
122
137
160
178
193
205
225
251
269
282
292
301

20% 0.2EY
4.39
7.65
10.7
13.5
16.1
25.9
32.9
38.3
42.9
46.8
56.2
63.5
75.3
84.8
100
119
135
160
181
214
239
259
276
303
339
363
380
393
405

4.48
7.81
11
13.8
16.4
26.4
33.5
39.1
43.7
47.7
57.3
64.8
76.8
86.5
102
122
138
164
185
218
244
265
282
309
346
370
388
401
413

10%
5.13
9.1
12.7
16
18.9
30.2
38.3
44.7
50.1
54.7
66.1
75.2
89.8
102
121
145
164
197
223
264
296
322
343
378
424
454
476
493
506

5%
5.84
10.5
14.7
18.3
21.6
34.2
43.4
50.7
56.9
62.4
75.7
86.5

104

118

142

194
233
265
315
355
387
413
456
514
553
579
599
614

2%
6.75
12.5
17.3
21.4
25.1
39.3
49.8
58.4
65.7
72.2
88.4
102
123
141
171
206
235
284
323
386
436
477
512
568
646
697
732
755
771

1% 1in 200
7.43 8.28
14 15.9
19.3 21.7
23.8 26.7
27.8 31
43.1 47.9
54.5 60.6
64 71.2
72.2 80.4
79.5 88.6
98 110
113 127
138 155
159 178
193 215
234 259
268 296
323 357
369 407
442 490
501 558
550 625
592 681
660 767
756 879
818 949
859 995
886 1030
902 1050

1in 500
9.59
18.6
25.5
31.1

36
55.3
70
82.3
93.1
103
127
147
180
206
249
299
341
410
468
565
647
734
805
915
1060
1140
1200
1240
1260

1in1000 1in 2000

10.6
20.9
28.4
34.6
40
61.2
775
91.2
103
114
141
164
200
229
276

376
452
515
624
717
821
907
1040
1210
1310
1370
1410
1440

11.7
23.3
31.6
38.4
44.2
67.3
85.2
100
114
126
156
181
221
253
304
364
413
495
564
685
790
914
1020
1170
1370
1480
1560
1600
1630

Page 14

                                                                                                           ingeniir


Appendix 2 | Water Balance Assessment
  CALOUNDRA WATER BALANCE - 2.4kL Tank Volume
  Roof Area        113 sq.m                                                Landscape             55 sq.m
  Irrigation Rate           548 mm/yr
  3
                    10 Year Water Balance (Storage Volume vs Time)
2.5


  2


1.5

                                                                                                                        Vol
  1


0.5


  0
  Dec-96       Apr-98        Aug-99          Jan-01         May-02          Oct-03          Feb-05          Jul-06    Nov-07

  10 Year water balance reliability                          0.97974


                    1 Year Water Balance (Storage Volume vs Time)
 3


2.5


 2


1.5
                                                                                                                       VOL

 1


0.5


 0
 Jan-06       Feb-06          Apr-06          Jun-06          Jul-06          Sep-06          Oct-06         Dec-06

  1 Year water balance reliability                                     1

                                              Ingeniir Pty Ltd | 245001-SMP-01
                ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                         Page 13 | 15

Page 15

                                                                                                   ingeniir


Appendix 3 | Rational Method & Detention Calculations




                                      Ingeniir Pty Ltd | 245001-SMP-01
        ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                 Page 14 | 15

Page 16

Water Retention & Detention Discharge
Tank Dimensions
Volume
Height

7500 L
1250 mm
Roof Area 122 m*
Roof ToC 5 min
c 09

Retention Depth
Retention Volume
Detention Volume

Pre - Development
Catchment Details
0.03035 ha
fi oat fi
0.781054366 c10
752 ho

‘Area 0.02425
0.85
087

mmr 52

DETENTION TANK DISCHARGE ESTIMATES (L/s)

Smin
volume (L)

ceasom reawnatice cy yim) oy Us)

0.55 m
3300 L
4200 L

Post - Development
‘Tank Bypass Catchment Details

ha

smavhr

SminStage Outlet Flow

(a)

(us)

 

 

0.80
0.85
0.95
1.00

07
o77
0.855
0.90
105 0.945
1s. 1.00
1.20 1

120 1.00

126
35720
1968
22680
259.2
30120
3336
40032

3074
408
5.102
692
8301
1021
11.305
1357

9222
122250
an06
2075.10
24903
3062.10
33915
4069.80

6%
osey
o2ey
010
3%
0.02
1%

1%2100

0.704
075
0.835,
0.90
0.965,
06
1s
123

051
059

03)
om|
aan
2a9
2.96
an

 

Pre-Development Whole ite Peak Discharges

Y

‘Area (ha) ly (mh) ays) thers

Frequency
earthy

Outlet Rating Curve
2500

2000

°

° as 1 1s 2 25 3

—1ow MID. ——HGH —Weir QTOTAL

Post-Development Whole ite Peak Discharges

Y

Tank outfow

yim) TOMO Totals

Bypass Area (ha) Discharge (is)

ty (mv)

 

0.030
0.030
0.030
0.030
0.030
0.030
0.030
0.030

0.624843493
0.66
0.742001647
078
0820107084
0.90
0937265239
0937

1260
1s72
1968
268
259.2
3012
326
400.3

6637
8.799
aan
14934
anga
22,808
26.36
3162

63.20%

39.35%
18.14%
10%
o%
%

1%
1% 2100

 

 

0.80
0.85
0.95
1.00
105
1s.
1.20
120

 

 

0.024
0.024
0.024
0.024
0.024
0.024
0.024
0.024

0.70
074
0.83
07
oa

126.00
35720
196.80
22680
259.20
30120

333.600

400.320

591
103

10.96
1329
15.95
2029

22412

26.966

051
059
070
on
un
249
2.96
3720

6.417
az.
a.6s7
14.061
17.060

11.000
11.000

 

Outlet Rating Curve Calculations
Pipel - Pipe2_—SPipe3
Low MID HIGH

Invert 0.55 0.97 1.35

Height 0 0 ON/A
Width 0 0 0

Diameter 25 50 100 N/A

Area 490.87385 1963.4954 7853.9816 N/A
Number 1 1 1

H Q Q Q Q

0.05

oO.

0.15

02

0.25

03

0.35

04

0.45

05

0.55 0

0.6 0.2917129

0.65 0.4125444

0.7 0.5052616

0.75 05834258

0.8 0.652899

0.85 0.7145478

0.9 0.771798

0.95 0.8250887 0

1 0.8751387 0.9038394

1.05 0.924772 1.4759636

1.1 0.9675023 18814917

1.15 1.0105232 22139453

1.2 1.0517859 2.502618

1.25 1.0914898 2.761275

1.3 11297993 2.976962

1.35 1.168516 3.216788 0

14 1.2027631 34218807 4.6674066

1.45 1.2376331 3.6153576 6.6007097

15 12715471 3.7989937 8.0841854

155 13045798 3.9741535 93348132 0

1.6 13367965 4.1419125 10.436638 8.37261

1.65 1.3682548 4.303363 11.432765 31.6874

1.7 1399006 4.4585339 12.348797 63.4249

1.75 14290956 4.6086947 13.201419 101.746

1.8 14585646 4.7541151 14.0222 145.667

1.85 14874498 4.8952173 14.759636 194.548

1.9 15157848 5.0323648 15.480036 247.928

1.95 15435996 5.1658725 16.168371 305.457

2 15709221 5.2960156 16.828574 366.854

2.05 15977774 5.4230364 17.463836 431.888

2.1 1.6241888 5.5471494 18.076788 500.368

2.15 1.6501774 5.6685456 18.669626 572.127

2.2 1.6757631 5.787396 19.24421 647.023

2.25 1.700964 5.9038542 19.802129 724.928

2.3 1.7257969 6.0180593 20.344754 805.731

2.35 1.7502775 6.1301371 20873277 889.331

2.4 1.7744204 6.240202 21.388744 975.638

2.45 1.7982392 6.3483593 21.892077 1064.57

25 18217466 6.4547044 2.384096 1156.05

Weir

1.565
mm
750 mm
mm
mmé

Qrom

ecocococoe
ecco eococoe

0
0.29171
0.41254
0.50526
0.58343
0.65229
0.71455

0.718
0.82509
1.77898
2.39844
2.84899
3.22447

3.5544
3.85276

4.1275
4.38364
9.29205
11.4537
13.1547
14.6135,

24.288
48.7916
81.6312
120.985
165.882

215.69
269.956
328.335,
390.549
456.373
525.616
598.116

673.73
752.335,
833.819
918.085
1005.04
1094.61
1186.71

ecocesc occ coc ooo CoS

ecooo ee occ eC CoCo CC COCO OCCC OOS
ecoocecec occ eco c CCC COC CC OO COC OCCC OOS

 

 

Page 17

                                                                                                   ingeniir


Appendix 4 | Example Tank Details




                                      Ingeniir Pty Ltd | 245001-SMP-01
        ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                 Page 15 | 15

Page 18

               Installation and maintenance instructions for
                    Li-Lo Rainwater Underground Tank


1500 L         Order No. 200050
396 US-gal                  (07.1004)


3000 L         Order No. 200051
793 US-gal                  (07.1006)



5000 L         Order No. 200052
1,321 US-gal                (07.1010)



7500 L         Order No. 200053
1,981 US-gal



                                        Table of contents
The points described in these
                                        1.    GENERAL NOTES                                         13
instructions must be observed           1.1    Safety                                               13
under all circumstances. All            1.2    Labelling/Tagging obligation                         13
warranty rights are invalidated in
the event of non-observance.            2.    INSTALLATION CONDITIONS                               13
Separate installation instructions      2.1     Pedestrian weight resistant                         13
                                        2.2     Light traffic load resistant                        13
are enclosed in the transportation
                                        2.3     General                                             13
packaging for all additional articles
purchased from GARANTIA.                3.    TECHNICAL DATA                                        15
                                        3.1    GARANTIA Li-Lo Rainwater Underground Tank            15
                                        3.2    GARANTIA Extension riser                             15
Missing instructions must be            3.3    GARANTIA PE Cover                                    15
requested from us immediately.          3.4    GARANTIA Car Module                                  15

                                        4.    TANK STRUCTURE                                        16

The tank must be checked for any        5.    INSTALLATION AND ASSEMBLY                             16
                                        5.1     Construction site                                   17
damage prior to insertion into the
                                        5.2     Trench                                              17
trench under all circumstances.         5.3     Insertion and filling                               18
                                        5.4     Routing connections                                 19

Missing instructions can be             6.    ASSEMBLING GARANTIA EXTENSION RISER                    19
downloaded on www.garantia.eu           6.1    Assembly of extension riser                           19
or can be requested from                6.2    Assembly of PE Cover                                  19
                                        6.3    Assembly of Car Module with cast iron cover (Class B) 20
GARANTIA.
                                        6.4    Assembling the extension riser as adapter             20

                                        7.    INSPECTION AND SERVICING                              21




                                               12 / 56

Page 19

                                                   [email protected]
                                                   www.garantia.com


                                              1.    General notes

1.1       Safety
When working, the appropriate health and safety regulations must be followed. For safety reasons,
especially when entering the tank, it is important that a second person is present.
Furthermore, when carrying out assembly and installation work, inspection, maintenance and repairs, all
work regulations and norms must be followed. You will find the advice in the appropriate sections of these
instructions.
The complete system must always be out of operation and guarded against unauthorized use when
carrying out work on the plant or parts of the system.
GARANTIA offers an extensive range of accessories that are all compatible with one another and may be
used to construct a complete system. The use of accessories that have not been approved by GRAF
results in the exclusion of the warranty/guarantee.


1.2       Labelling/Tagging obligation
The water in these systems is not suitable for consumption or personal hygiene.
All pipe work and outlets of the water systems are to be labelled with the words “Not drinking water”
either in words or graphically (German norm DIN 1988 Part 2, paragraph 3.3.2.) so that after years of use,
an accidental connection to the drinking water system is excluded. Even when correctly labelled it may
possibly be mistaken, for example by children. For this reason, all the outlets of the systems process
water must be fitted with child safe valves.




                                         2.   Installation conditions

2.1       Pedestrian weight resistant
      •    The GARANTIA Li-Lo Rainwater Underground Tank with the PE cover may only be installed in
           traffic free areas. The amount of short-term load of the PE cover is max. 150 kg, the long-term
           area load max. 50 kg.

2.2       Light traffic load resistant
      •    The GARANTIA Li-Lo Rainwater Underground Tank with the cast iron cover (Class B) and
           cement support ring are suitable for installation in light traffic areas (max. total load 3.5 ton). The
           tanks are not to be installed in areas where heavy goods vehicles are driven.
      •    The areas driven by light traffic must have a compacted earth covering of not less than 700 mm
           (27.6 inch) and a maximum of 1000 mm (39.4 inch).
      •    Under no circumstances is the load caused by vehicles to be transferred to the tank.

2.3       General
      •    In the case of ground water or slope locations the special installation instructions must be
           followed (see page 17).
      •    For installation adjacent to areas traversed by heavy vehicles (see page 17).
      •    The maximum allowed earth coverage above the tank shoulder must not be more than 1200 mm
           (47.2 inch) – in green areas only – not under areas used by passenger cars (see page 14).




                                                        13 / 56

Page 20

                                            [email protected]
                                            www.garantia.com


                                 2.     Installation conditions


                                                                       335 mm
                                                                       13.2 inch
Approved earth coverage height with
GARANTIA PE-lid in green areas.




                                                                   535 - 865 mm
Feasible earth coverage height with                                21.1 - 34.1 inch           |

GARANTIA extension riser and PE-lid in
green areas.




Maximum allowed earth coverage height with
second GARANTIA extension riser as                                 max. 1200 mm
                                                                                          |
                                                                   max. 47.2 inch
adapter or extension and PE-lid.
(in green areas only – not under areas used
by passenger cars)




                                                                                                  max. 3,5 to




Cover heights with telescopic dome shaft
                                                                  >700 <1000 mm
and car-module in areas with car traffic (load                    >27.6 <39.4 inch
                                                                                      |

up to 3.5 tonnes).
(without groundwater and stratum water)




                                                                  >700 <1200 mm
Allowed earth coverage heights on                                 >27.6 <47.2 inch    |
installation in groundwater – the hashed area                   Max.                                      Max.

specifies the permissible immersion depth for
the tank.
(not under areas used by passenger cars)


                                                 14 / 56

Page 21

                                                                    [email protected]
                                                                    www.garantia.com


                                                               3.     Technical data

  3.1        GARANTIA Li-Lo Rainwater Underground Tank
                                                   600 mm                                                                   600 mm
                                                   23.6 inch                                                                23.6 inch
                                                       -                                                                        -

315 mm      185 mm |                                                | 185 mm | 265 mm                 | 185 mm
                                                                                                        7.28 inch                                      | 185 mm
12.4 inch | 7.28 inch                                                 7.28 inch
                                                                              10.43 inch                                                                 7.28 inch



                                                                                        Hges                                                                      Hges
        H                                                                               Htot                                                                    Htot




                                        L                                                                                       B


      Tank                   Order No.                 Weight                   L                      W                      H                      *Htot
      1500 L                  200050                                       2100 mm                  1250 mm                700 mm                  1015 mm
                                                       82 kg
      396 US-gal             (07.1004)                                      82.7 inch               49.2 inch             27.6 inch                40.0 inch
      3000 L                  200051                                       2450 mm                  2100 mm                735 mm                  1050 mm
                                                       180 kg
      793 US-gal             (07.1006)                                      96.5 inch               82.7 inch             28.9 inch                41.3 inch
      5000 L                  200052                                       2890 mm                  2300 mm               1000 mm                  1315 mm
                                                       250 kg
      1,321 US-gal           (07.1010)                                     113.8 inch               90.6 inch             39.4 inch                51.8 inch
      7500 L                                                               3600 mm                  2250 mm               1250 mm                  1565 mm
                                 200053                360 kg
      1,981 US-gal                                                         141.7 inch               88.6 inch             49.2 inch                61.6 inch
      *Htot = total height

  3.2        GARANTIA Extension riser
             (Order No. 202079 / 202057)

                                 220 mm / 220 mm                                         550 mm / 700 mm                                         420 mm / 620 mm
                             |                                                    |                                                         |
                                 8.7 inch / 8.7 inch                                    21.6 inch / 27.6 inch                                   16.5 inch / 24.4 inch



            minimum effective length                            maximum effective length                                maximum effective length
                                                                                                                          if using as extension

  3.3        GARANTIA PE Cover
             (Order No. 202803)



                                                   730 mm                                                                               79 mm
                                               |                                                                                    |
                                                   28.7 inch                                                                            3.1 inch




                                 Top view                                                                           Side view

  3.4        GARANTIA Car Module
             (Order No. 202059)
                                                                                                       670 mm
                                                                                                          -
                                                                                                       26.4 inch
                                                                                                       650 mm
                                                                                                          -
                                                   725 mm                                              25.6 inch
                                              |                                                                                         70 mm
                                                   28.5 inch
                                                                                                                                    |
                                                                                                       665 mm                           2.8 inch
                                                                                                          -
                                                                                                       26.2 inch
                                                                                                       725 mm
                                                                                                           -
                                                                                                       28.5 inch
                                 Top view                                                                           Side view

                                                                           15 / 56

Page 22

                                            [email protected]
                                            www.garantia.com


                                       4.    Tank structure



1. Cover (PE Cover or Car Module)                                       1


                                                                       2.1

2.1 Telescopic attachment




                                                 Extension riser
                                                                       2.2



                                                                       2.3
2.2 Telescopic conical nipple /
    Dome Shaft conical nipple
                                                                       2.2


                                                                        3
2.3 Dome Shaft



3. Li-Lo Rainwater
   Underground Tank




                                  5.   Installation and assembly


  Subsoil                                                          Covering layer
  Extension riser                                                  Li-Lo Rainwater Underground Tank
  Compacted foundation                                             Concrete layer for surfaces used by passenger
  Surrounding (round-grained gravel, max.                            cars
    grain size 8/16)                                               ß  DIN 4124 from 1250 mm (49.2 inch) depth of
                                                                             the trench



                                                                                   ß --> DIN 4124
     1                            4          7                                2            5          ß

                                                                                                          >> 100
                                                                                                             100 mm
                                                                                                                 mm 3.9 inch


                                                                                                          << 300
                                                                                                             300 mm
                                                                                                                 mm 11.8 inch

                                                                                                          << 300
                                                                                                             300 mm
                                                                                                                 mm 11.8 inch


                                                                                                          << 300
                                                                                                             300 mm
                                                                                                                 mm 11.8 inch


                                                                                                          << 300
                                                                                                             300 mm
                                                                                                                 mm 11.8 inch


                                                                                                          << 300
                                                                                                             300 mm
                                                                                                                 mm 11.8 inch
                                                                                                          >> 100
                                                                                                             100 mm
                                                                                                                 mm 3.9 inch




                                   6                                           3
                                                        16 / 56

Page 23

                                                       [email protected]
                                                       www.garantia.com


                                          5.    Installation and assembly

5.1       Construction site
Under all circumstances, the following points must be clarified prior to installation:
      •    The structural suitability of the ground according to DIN 18196
      •    Maximum groundwater levels which occur and drainage capability of the subsoil
      •    Types of load which occur, e.g. traffic loads
An expert ground report should be requested from the local planning authority to determine the physical
characteristics of the subsoil.

5.2       Trench
To ensure that sufficient space is available for working, the base area of the trench must exceed the
dimensions of the tank by > 100 mm (3.9 inch) on each side; the distance from solid constructions
(e.g. foundations of the house) must be at least 1000 mm (39.4 inch).
If the depth of the trench is > 1250 mm (49.2 inch) an embankment must be designed according to
DIN 4124. The construction site must be horizontal and plane and must guarantee sufficient load-bearing
capacity.
The depth of the trench must be dimensioned so that the max. earth coverage (see point 2 – installation
conditions) above the tank is not exceeded. To use the system throughout the entire year, it is necessary
to install the tank and those parts of the system which conduct water in the frost-free area. The frost-free
depth is usually approx. 600 – 800 mm (23.6 – 31.5 inch); precise information in this regard can be
obtained from the responsible authority.
A layer of compacted, round-grain gravel (grain size 8/16, thickness approx. 100 – 150 mm;
3.9 – 5.9 inch) is applied as the foundation.

5.2.1 Slope, embankment, etc.
On installation of the tank in the immediate vicinity (< 5 m;
196.9 inch) of a slope, earthen mound or slope, a statically
calculated supporting wall must be erected to absorb the soil
pressure. The wall must exceed the dimensions of the tank
by at least 500 mm (19.7 inch) in all directions, and must be
located at least 1000 mm (39.4 inch) away from the tank.


5.2.2 Groundwater and cohesive (water-impermeable)
      soils (e.g. clay soil)                                                                  >700 <1200 mm
                                                                                              >27.6 <47.2 inch   |

If it is anticipated that the tanks will be immersed deeper into
                                                                                         Max.                        Max.


the groundwater than is shown in the adjacent figure,
sufficient dissipation must be ensured. (See table for max.
immersion depth).
Dissipation of the drainage water (e.g. via an annular
drainage system) is recommended in the case of cohesive, water-impermeable soils.
                             1500 L              3000 L         5000 L         7500 L
 Tank
                           396 US-gal          793 US-gal    1.321 US-gal   1,981 US-gal
                              700 mm            735 mm         1000 mm       1250 mm
 max. immersion depth
                              27.6 inch         28.9 inch      39.4 inch     49.2 inch


5.2.3 Installation adjacent to surfaces used by vehicles
                                                                                         >H
If the underground tanks are installed adjacent to surfaces
which are used by heavy vehicles weighing over 3.5 ton, the
minimum distance away from these surfaces is at least the                                                            H

depth of the trench.



                                                            17 / 56

Page 24

                                                  [email protected]
                                                  www.garantia.com


                                  5.    Installation and assembly

5.2.4 Connection of several tanks
                                                                            > 500 mm
                                                                            > 19.7 inch
                                                                                 -



Two or more tanks are connected
via the assembly surfaces by
means of GARANTIA special seals
and basic pipes (to be provided at
construction site).
The apertures must be drilled to the
corresponding size using only the
GARANTIA special crown bit. It must be ensured that the distance between the tanks is at least 500 mm
(19.7 inch). The pipes must project at least 200 mm (7.9 inch) into the tanks.



5.3   Insertion and filling

                                                                          > 100 mm
                                                                      -
The tanks must be inserted, impact-free, into                             > 3.9 inch


the    prepared   trench    using    suitable
equipment. To avoid deformities, the tank is
filled 1/3 with water before backfilling the                                                       2. 3/3
excavation.                                                                               1. 1/3




Afterwards the surrounding (round grain
gravel, max. grain size 8/16) is then filled in
layers of max. 30 cm (11.8 inch) and is
compacted.
The individual layers as well as the
medial support column must be well-
compacted (manuel tamper). Damage to
the tank must be avoided during compaction.
Mechanical compaction machines must not
be used under any circumstances. The
surrounding towards the trench must be at
least 100 mm (3.9 inch) wide i.e. the
distance between each wall an the tank must
be ≥ 100 mm (3.9 inch).




                 Backfill material                                                  Suitability

Split (Type B) consisting of max. 16 mm stone                                               
particles capable of solid compaction                                        (recommended)
Round grain gravel to the top of the dome, top                                              
soil to the top of the shaft and lid
(max. grain size 8/16)                                                       (recommended)

Sand mixed with water                                                                     ()
                                                                                          ()
Good garden soil (sandy loam)
                                                           (only soil properties are similar to sand or gravel)
Fine clay soil                                                                            NO



                                                       18 / 56

Page 25

                                                [email protected]
                                                www.garantia.com


                                   5.     Installation and assembly

5.4   Routing connections
All feed and overflow pipes must be routed
with a decline of at least 1 % in the direction of
flow (possibly, subsequent settling must be
taken into consideration in this case). If the
tank overflow is connected to a public sewer,
this must be protected against reflux by
means of a lifting station (mixed sewer) or
reflux seal (pure rainwater sewer) according to                                                   >1%
DIN 1986.
All suction, pressure and control lines must be                     >1%
                                                       Kanal
                                                       Sewer
routed in an empty pipe, which must be routed
as straight as possible, without bending, to the
tank with a decline. Necessary bends must be
formed using 30° moulded sections.
Important: The empty pipe must be connected to an aperture above the max. water level.




                         6.     Assembling GARANTIA extension riser

6.1   Assembly of extension riser
                                                                                Telescopic
                                                                          Teleskopaufsatz
The extension riser enables infinite adaptation of the tank to the              attachment
given site surfaces between min. 535 mm (21.1 inch) and                   Dichtringring
                                                                          Sealing




                                                                                                        Extension riser
max. 865 mm (34.1 inch). The extension riser has 7 positions in
                                                                          Domschacht
                                                                          Dome shaft
2.0 inch steps (see sketch). To allow the minimum soil covering of
the tanks of only 535 mm (21.1 inch), the telescopic attachment
must be slightly shortened.
The sealing ring is placed in the highest remaining complete              Dichtringring
                                                                          Sealing
groove and the telescopic attachment is pushed on (first lubricate
the sealing ring). The telescopic attachment must be well
supported with back fill material to ensure that it will not sink when
under load.
For assembling, the extension riser is placed loosely on the tank
opening. It gains its final stability without further fastening when
the pit is filled up and compressed.




6.2   Assembly of PE Cover
                                                                             Schraube M 8 x 60
The PE Cover must remain locked (child proof) in position                               screw

except when working in the tank.
                                                                             Unterlegscheibe M8
                                                                                         washer
The three sleeves are guided and hammered from below into the
holes of the telescopic attachment and screwed from above with 5 -            Double walled
                                                                             doppelwandiger
                                                                             Deckel   cover
 6 turns. Finally place the cover in position and screw into place so
that it is child proof. The washers prevent the screws from cutting         Teleskopaufsatz
                                                                          Telescopic access
into plastic material of the cover.
                                                                                      sleeves
                                                                             Einschlaghülse M8




                                                     19 / 56

Page 26

                                              [email protected]
                                              www.garantia.com


                        6.     Assembling GARANTIA extension riser

6.3   Assembly of Car Module with cast iron cover
      (Class B)                                                                            Encasement
                                                                                                 Rahmen       Cover
                                                                  Beton                    für cover           Deckel
                                                                                                  f. Deckel
When the tank is installed in areas traversed by light               Concrete
                                                                  (für Befahrbarkeit)
traffic (max. total load 3.5 ton) the telescopic assembly
                                                                    Deckschicht
                                                                    Covering layer                               Telescopic
must be embedded and supported by reinforced                                                                   Teleskopaufsatz
                                                                                                                 access
concrete (Load classification B25 = 250 Kg/m²). The
concrete encasement must be uninterrupted, 300 mm                                                              Dichtung
                                                                                                                Seal
(11.8 inch) wide and approximately 200 mm (7.9 inch)
                                                                                                                Domschacht
                                                                                                                 Dome shaft
deep. Subsequently, the concrete frame as well as the                         Rollkies
                                                                             Chips
cast iron cover (class B) supplied with the product are
                                                                                                     Eisenarmierung
fitted. The earth covering above the tank must be not                                                 Reinforce
                                                                              Ø ca. 1000
less than 700 mm (27.6 inch) and a maximum of
1000 mm (39.4 inch).


Under no circumstances are occurring loads to be transferred directly to the tank.
The Li-Lo Rainwater Underground Tank may under no circumstances be installed in areas traversed by
heavy goods vehicles or heavy machinery (See point 5.2.3).

6.4   Assembling the extension riser as adapter
If a wider dome shaft  is used as shaft extension or adapter for larger earth coverage, it is fitted loosely
between the tank opening  and the top extension riser . The shaft extension gains its final stability
without further fastening when the pit is filled up and compressed.
The maximum effective length per shaft extension or adapter is 406 mm (16.0 inch). The dome shaft can
be shortened at 7 positions from top by 50 mm (2.0 inch) in each case (see sketch).
The maximum allowed earth coverage height in combination with a second GARANTIA extension riser is
1200 mm (47.2 inch) above tank shoulder (only in green areas – not in the areas used by passenger cars.


Adapter = Max. effective length 406 mm (16.0 inch)
Allowed earth coverage height = Max. 1200 mm (47.2 inch) above tank shoulder


 Cover (PE Cover or Car Module)                                                              1




 Extension riser
                                                                                              2




 Dome shaft (shaft extension or adapter)
                                                                                              3


 Dome Shaft conical nipple

                                                                                              4

 Li-Lo Rainwater Underground Tank
                                                                                              5




                                                   20 / 56

Page 27

                                               [email protected]
                                               www.garantia.com


                                  7.     Inspection and servicing

The entire system must be checked for leaks, cleanliness and stability at least every three months.
The entire system should be serviced at intervals of approx. 5 years. In this case, all parts of the system
must be cleaned and their function checked. Servicing should be carried out as follows:


    •   Drain the tank completely
    •   Clean surfaces and internal parts with water
    •   Remove all dirt from the tank
    •   Check that all internal parts are firmly seated.




                                               www.garantia.com



                                                                                                        2024-06
                                                    21 / 56

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.