Original source · versioned page text
Appendix 4- SWMP
ingeniir
Appendix 2 | Water Balance Assessment
CALOUNDRA WATER BALANCE - 2.4kL Tank Volume
Roof Area 113 sq.m Landscape 55 sq.m
Irrigation Rate 548 mm/yr
3
10 Year Water Balance (Storage Volume vs Time)
2.5
2
1.5
Vol
1
0.5
0
Dec-96 Apr-98 Aug-99 Jan-01 May-02 Oct-03 Feb-05 Jul-06 Nov-07
10 Year water balance reliability 0.97974
1 Year Water Balance (Storage Volume vs Time)
3
2.5
2
1.5
VOL
1
0.5
0
Jan-06 Feb-06 Apr-06 Jun-06 Jul-06 Sep-06 Oct-06 Dec-06
1 Year water balance reliability 1
Ingeniir Pty Ltd | 245001-SMP-01
ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
Page 13 | 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.