Appendix 4- SWMP

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                            ingeniir

    •   State Planning Policy Appendix 2 Table A – available here
    •   IECA Principles of Construction Site ESC – available here
    •   Water by Design ESC Factsheet Suite – available here
    •   For sites less than 2,500m2; Refer to the Department of Environment and Science Procedural guide,
        Releases to waters from building sites and small construction sites (less than 2,500m2) – available
        here
    •   For sites more than 2,500m2; Refer to the Department of Environment and Science Procedural guide,
        Releases to waters from land development sites and construction sites 2,500m 2 and greater –
        available here

Detailed Erosion and Sediment Control design and plans should be documented by a suitably experienced
professional in conjunction with any application, or prior to commencing with the Operational Works
associated with the proposed development on site.

5.1.1    Soil Cover

Disturbed areas are to be stabilised as soon as possible following construction. Clearing of existing soil cover
shall be limited to only the areas necessary to undertake building work; and cleared as close as possible to the
commencement of the works in that area.

Areas of bare soil not actively being worked on shall be covered to limit erosive actions with mulch (gravel,
straw or wood chip) or sheeting such as plastic or geo-textile.

5.1.2    Stockpile Protection

Stockpiles shall be protected by covering with plastic or geotextile sheeting when not in use, ensuring that
the stockpiles are not placed on top of sediment barriers such as sediment fences and ensuring stockpiles are
not located in overland flow paths.

If unavoidable, run-off is to be directed around the stockpile (not for sites less than 450m2) with a cut-off
drain.

5.1.3    Kerb to allotment groundcover

Exposed soil between the lot boundary and the kerb shall be covered as soon as possible with turf or
temporarily covered with mulch or sheeting.

Stockpiles shall be fully contained within the lot and not on the verge unless specifically approved by the
local authority.

5.1.4    Sediment Control of entry and exit areas

Measures shall be adopted to establish a formal stable entry/exit area such as a rock-pad or shaker grid. Any
formalised entry or exit sediment control point shall be well maintained and appropriate to prevent run-off,
and consist of a rock-pad or shaker grid that is at least 2m wide, and extending from the kerb to the building
pad.



                                               Ingeniir Pty Ltd | 245001-SMP-01
                 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                          Page 6 | 15
Log in to download the original file

Appendix 4- SWMP.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.