Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

DA Form 1 - 11 Robert St

of 12

Page text shows just the words. Original shows the document exactly as it was published.

10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:
Intended use of lots created               Residential              Commercial             Industrial               Other, please specify:


Number of lots created

10.2) Will the subdivision be staged?
    Yes – provide additional details below
    No
How many stages will the works include?
What stage(s) will this development application
apply to?

11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
    parts?
Intended use of parts created              Residential              Commercial             Industrial               Other, please specify:


Number of parts created

12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
                             Current lot                                                                 Proposed lot
Lot on plan description               Area (m ) 2
                                                                           Lot on plan description               Area (m2)



12.2) What is the reason for the boundary realignment?



13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)
Existing or               Width (m)        Length (m)        Purpose of the easement? (e.g.                     Identify the land/lot(s)
proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
  14.1) What is the nature of the operational work?
                                                                                                    Water infrastructure
     Road work                                   XStormwater
                                                                                                    Sewage infrastructure
     Drainage work                               XEarthworks
                                                  Signage                                           Clearing vegetation
     XLandscaping
   Other – please specify:
14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
    Yes – specify number of new lots:
   X No
Log in to download the original file

DA Form 1 - 11 Robert St.pdf · 290 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.