Skip to the record
For the highest quality transcripts.

Council archive · source document

planning report 73 southern cross · MCU22/0197

of 17

Text shows just the words. Original shows the document exactly as it was published.

•   the garages have a substantial setback of 9.61m from the front boundary;

•   the upper floor level pergola protrudes forward of the garage build line with dual architectural posts
    used to help reduce the garages appearance;

•   a lightweight natural timber vertical batten finish is used and softens any impact of the garage doors;

•   the front elevation is asymmetrical and uses a mix of materials to provide an interesting street facing
    elevation and not dominated by garaging;

•    the centrally located driveway allows for the fence and landscaping to screen most of the garage doors;

•    the front fence covers nearly three quarters of the southern garage door and dense landscaping is
     provided in the front of the fence to screen both the fence and garages as shown below in Figure 8;




•

Figure 8 - dense screening vegetation to the front of the site.




                                                                                            Page 11 of

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

planning report 73 southern cross.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.