23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published] · 132003.221199
Plans and drawings: the text below has words only, no drawings.
Queensland Hat ys Government Hon Desley Boyle MP Member for Cairns MC06.1189 — TPA23569 Minister for Environment Minister for Local Government ne - 338 “B and Planning Mr Bruce Davidson Minister for Women Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 Dear Mr Davidson Notice of Decision of Development Application - Integrated Planning Act 1997 Pursuant to section 3.6.7 of the Integrated Planning Act 1997, | hereby give notice ‘that the development application made by Attunga Heights Pty Ltd at 27 Attunga Heights Roads, Noosa Heads and called in by me on 1 December 2005, was approved in part and refused in part on 6 March 2006. A copy of the decision notice is attached. | also wish to take this opportunity to thank Council officers for the co-operation and substantial assistance provided to officers of the Department of Local Government, Planning, Sport and Recreation during the call in process. The professionalism of Mrs Kerri Coyle, Ms Jane Davissen and Mr Shane Adamson was greatly appreciated. If any further information is required, please contact Mr Brett Raguse of my office on telephone number 322 78819. Yours sincerely Desley Boyle MP Minister for Environment Minister for Local Government and Planning Minister for Women Att. Level 18 41 George Street Brisbane PQ Box 15031 City East Queensland 4002 Australia Telephone +61 7 3227 8819 Facsimile +61 7 3221 9964 Email [email protected] Website www.qlid_gov.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 58 pages
Page 2
DECISION NOTICE Ministerial Call-in Integrated Planning Act 1997 s3.6.7 DECISION DATE 6 March 2006 APPLICANT DETAILS Name: Attunga Heights Pty Ltd Postal address: c/- Victor G Feros Town Planning Consultants 195 Dornoch Terrace HIGHGATE HILL QLD 4101 Phone no: 3844 2882 Fax no: 3846 1840 PROPERTY DESCRIPTION Street address: 27 Attunga Heights Road Suburb/locality Noosa Heads Real property Lot 27 RP 89506, Lot 112 SP 151410, County of March, Parish of description: Weyba APPLICATION TYPE Development Development Details Type of Approval sought Material Change of Multiple Dwelling (30 Dwelling Units) Development Permit Use and Accommodation Building (12 Accommodation Units) Reconfiguring a 1 lot into 2 Development Permit Lot REFERRAL AGENCIES Referral Agency Address Jurisdiction Environmental GPO Box 2771 Advice agency pursuant to Protection Agency BRISBANE QLD 4001 section 3.6.7(1)(d) of the Integrated Planning Act 1997 Contaminated Land
Page 3
DECISION DETAILS Development Decision Development permit or preliminary approval Material Change of Use for Approved subject to Development permit Multiple Dwelling (30 Dwelling conditions Units) and Accommodation Building (12 Accommodation Units) Reconfiguring a Lot Refused - 4 lot into 2 Reasons for refusal of development application for development permit for reconfiguring a lot - 1. | The proposed reconfiguration is contrary to the minimum lot areas envisaged by the Schedule to the Planning Scheme and the Strategic Plan and there are not sufficient grounds to justify approving the application despite the conflict with the Strategic Plan. 2. The proposed reconfiguration will bisect and fragment a State wildlife corridor and will adversely impact on the protection and management of the biodiversity and environmental values of the State wildlife corridor. This refusal is solely at the direction of the assessment manager. CONDITIONS The approval of the Development Permit for Material Change of Use is subject to conditions. The conditions of the Minister, as assessment manager, are attached. OTHER NECESSARY DEVELOPMENT PERMITS Listed below are other development permits that are necessary to allow the development to be carried out— Type of Development Subject of the required Development Permit Permit required Development Permit for Clearing native vegetation made assessable under Schedule 8 Operational Works Part 1 Table 4 Item 1A of IPA Development Permit for Landscaping, car parking and access, frontage works, Operational Works stormwater drainage, earthworks, water and sewer reticulation Development Permit for All Building Works Building Works
Page 4
SUBMISSIONS Thirty two (32) properly made submissions were received on the application. In accordance with section 3.5.15(2)(i) of the IPA, the name and address of the principal submitter for each properly made submission is attached. . RIGHTS OF APPEAL Under section 3.6.7(1)(e) of the Integrated Planning Act 1997 (IPA), this decision is taken to be the original assessment manager's decision, but may not be appealed. CURRENCY PERIOD The standard currency period stated in section 3.5.21(2) of IPA applies to development in this approval. Desley Boyle MP Minister for Environment Minister for Local Government and Planning Minister for Women
Page 5
-4. ASSESSMENT MANAGER'S CONDITIONS INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development, as may be amended by the conditions of this approval. The approved plans for this development approval are listed in the following table— Plan/Document | - .Plan/ Document Name =~ .° | Date Number : : . : : 978 DA0000 Issue K | Locality Plan Cover Sheet prepared by JMA 2/03/2006 Architects Queensland Pty Ltd 978 DA0001 Issue K | Site Plan prepared by JMA Architects Queensland 2/03/2006 Pty Ltd : 978 DA0002 Issue K | Site Setout Plan - Part A prepared by JMA Architects | 2/03/2006 Queensland Pty Ltd 978 DA0003 Issue K | Site Setout Plan — Part B prepared by JMA Architects | 2/03/2006 Queensland Pty Ltd 978 DA0004 Issue K | Site Setout Plan - Part C prepared by JMA Architects | 2/03/2006 Queensland Pty Ltd 978 DAQ005 Issue K | Site Setbacks prepared by JMA Architects 2/03/2006 Queensland Pty Ltd 978 DAOO06 Issue K_ | Site Setout Plan — Basement prepared by JMA 2/03/2006 Architects Queensland Pty Ltd 978 DA0007 Issue K | Site Sediment Erosion Conto! prepared by JMA 2/03/2006 Architects Queensiand Pty Ltd 978 DA1001 Issue J | General Arrangement Lodge — Basement prepared 27/09/2005 by JMA Architects Queensland Pty Ltd 978 DA1002 Issue J | General Arrangement Lodge — Ground prepared by 27/09/2005 JMA Architects Queensland Pty Ltd 978 DA1003 Issue J | General Arrangement Lodge — First prepared by JMA | 27/09/2005 Architects Queensland Pty Ltd 978 DA1004 Issue J General Arrangement Lodge - Cabins prepared by 27/09/2005 JMA Architects Queensiand Pty Ltd 2. All development, including decked car parking areas, shall be setback a minimum of 10 metres from the centre line of the creek. This condition does not apply to the cantilevered balconies of dwelling units, unless the balconies would result in the clearing of remnant vegetation. This condition is subject to any development permit for operational works for clearing vegetation which is granted after the date of this approval’ , 3. The waste vehicle collection trailer shall not be stored/parked within the car parking spaces required for the Accommodation Building (Lodge). Increased setbacks from the creek may be required for development which involves clearing remnant vegetation to which the Vegetation Management Act 1999 applies.
Page 6
10. 14. 12. 13. 14. 15. 16. -5- A vegetated wildlife corridor shall be maintained clear of all development through the site. All development shall be setback a minimum of 30 metres from the western boundary of the site, with the exception of proposed mid cabin pods 7C, 8C, 1A, 2A, 3A and 2B, which shall be setback a minimum of 24 metres from the western boundary of the site and the lift and footpath to the west of pods 8C, 1A, 2A, 3A, which shall be setback a minimum of 20 metres from the westem boundary of the site. The wildlife corridor, the buffer to the creek and land outside of the ‘Development Areas’ pursuant to condition no. 7, must be made the subject of an environmental covenant by the registration of an instrument of covenant under section 97A of the Land Title Act 1994. The Noosa Shire Council will be the covenantee. The environmental covenant shall cater for the requirements of the conditions of approvat including protecting the site's flora and fauna. The development’s external finishes, including roofing materials, shall be in natural hues so as to blend in with the site’s vegetation with zinc alumina not permitted. The development shall be constructed in a manner that minimises site impacts, including a predominant building form of raised elevated structures, minimal earthworks and site works limited to not extend past the proposed retaining walls in accordance with the development plans referred to in condition no. 1. Land disturbance including clearing of vegetation and other works must not extend more than 1.5 metres beyond the footprint of the built structures. Vehicular access for works associated with construction of the multiple dwellings shall be from Alma Way utilising the approved driveways for the development The open space and setback areas between the Accommodation Building (Lodge) and Attunga Heights Road are to be landscaped in accordance with Council's Planning Scheme Policy PSP1 - Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter. Any fence to the Attunga Heights Road frontage shall be setback at least 1 metre from the front property boundary, with at least half of the fencing setback 2 metres. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing from the street. All fencing (other than the fence to the Attunga Heights Road frontage) shall be fauna friendly. A verification survey of all buildings is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the maximum building height above natural surface and finished surface level, as indicated on the approved plans and calculated in accordance with the provisions of the Noosa Shire Council transitional planning scheme. Existing trees on the site and within road reserves are to be retained, except where required to be removed within the approved development envelope. These landscape plans for the area between the Lodge and Attunga Heights Road required to be prepared under condition 8 are to denote areas of existing vegetation or existing trees proposed or required to be retained. The 3 mature Hoop Pines in the vicinity of the Lodge Development shall be protected. Any advertising sign or device is to comply with Council's Local Law No. 16 - Control of Advertising. © All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems (LPG or natural). Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures. All kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per minute. Dishwashers and washing machines are excluded from this requirement. .
Page 7
17. 18. 19, -6- To secure performance of all conditions of this approval, security in the form of a cash bond or trading bank guarantee to the sum of $250,000 for the Multiple Dwelling and $50,000 for the Accommodation Building (Lodge) must be submitted to Council, prior to the issue of a Development Permit for Operationa! Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval tess any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. The applicant must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. Amenity - General 20. There shall be no substantial detrimental effect upon the amenity of the neighbourhood, including the Viridian Development, by reason of the creation of excessive noise, lighting nuisance or other emissions by or from the Development, including that caused by cars accessing either along Alma Way or manoeuvring within the development. Noise 21. a) Swimming pools (if any) are to be used only between 7:00am and 9:00 pm daily. b) Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner that prevents a noise nuisance beyond the site in accordance with the environmental nuisance provisions of the Environmentai Protection Regulation 1998. c) The applicant must ensure that no builder or building contractor carries out building work on a building site in a way that makes or causes audible noise to be made from the building work on:- i) Monday to Saturday, before 7:00am or after 6:30pm; and ii) Sunday or public holiday, at any time. Lighting 22. a) The level of illumination, at a distance of 1.5 metres outside the boundary of the Site, resulting from direct, reflected or other incidental light emanating from the Site shall not exceed eight lux measured at any level upwards from ground level. b) Lighting is to be directed downwards so as to minimise any adverse effects of glare or direct light nuisance on all adjacent allotments (including Lot 106 on SP 151408- the Viridian development), but must achieve a minimum level of iltumination consistent with the safety of pedestrians and vehicles. c) Lighting to any walkways, where required, is to be low level bollard type lighting, down lighting or foot lights that achieve the minimum of illumination and light spillage consistent with safety for pedestrians and vehicles. Buildings and Other Structures 23. a) The colours of the buildings shall be muted tones of browns, greens, ochres, blues and greys selected from a suitable colour palette. b) The project is not to be staged (other than the Lodge component in Attunga Heights). ¢c) Air conditioning units for the dwellings/cabins shall be located so as to not face the Viridian development where the dwellings / cabins are located east of the creek and adjacent to the eastern shared boundary with the Viridian development. d) Any spoil from construction activities to be removed from the site shall be by means other than through Lot 106 on SP 151408 (except that such removal shall be allowed whilst construction activity is under way on Lot 106 — the Viridian development). e) The applicant shall construct at its cost pedestrian access connections to the public pathway to be constructed on Lot 106 adjacent to Alma Way. An easement for this purpose to be agreed with the owners of Lot 106 and duly executed.
Page 8
-7- f) Rubbish storage areas constructed adjacent to Alma Way shall be suitably screened and there shall be an obligation to immediately return bins from their collection point after emptying. The collection area shall be maintained in a clean and tidy state. g) — There shall be no roof top terraces to any of the 30 dwellings. Revegetation / Landscape / Fauna Considerations 24, a) ‘The area adjacent to Lot 106 shail be densely landscaped in accordance with Council's Planning Scheme Policy PSP1 - Landscaping Guidelines in order to provide additional screening of Alma Way with such plantings to be initially of advanced stock including at a minimum 20 x 45 litre native trees adjacent the dwelling units and car parking areas. b) In conjunction with the developer / owner of Lot 106 on SP 151408 — the Viridian site, the applicant will on completion of its works remove the dividing fence between Lots 106 and 27 so as to allow free movement of fauna except in location where retention of the fence - is necessary for reasons of public safety. Management Plans 25. The Applicant shall prepare various management plans that relate to the design, construction and operational phases of the development. These plans are to be prepared by appropriately qualified persons and submitted to Council prior to issue of a Development Permit for Operational Works. The plans are to address specific matters detailed in the conditions of this approval. The plans to be submitted are: 25.1. Environmental Management Plan; 25.2. Ecological Restoration Plan and Specifications; 25.3. Vegetation Management Plan; 25.4. Weed Management Plan; 25.5. Fauna Management Plan; 25.6. Fire Management Plan; 25.7. Construction Management Plan (including Traffic Management Plan); 25.8. Stormwater and Water Quality Management Plan; and 25.9. Acid Sulphate Soils Management Plan. Fees Payable 26. 27. The Applicant shall pay Council all reasonable costs for the assessment of the management plans and also the costs associated with ensuring the development complies with the requirements of this approval. These costs shall be limited to a maximum of $30,000 including the cost of external consultants should they be required. The further approvals required to allow development to occur shall be subject to the fees contained in Council's Fees and Charges Schedule. Environmental Management Plan 28. 29. An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that the impact of the development on the environment is minimised and that the environmental values of the site are protected and enhanced. The EMP is to: 28.1. Comply with AS14000. 28.2. Demonstrate a high level of environmental care and responsibility and be consistent with best practice for developments of this type in similar environments. 28.3. Detail the applicant's environmental policy and the proposed environmental management system for the site. The Environmental Management Plan shall specify to the reasonable satisfaction of Council: 29.1. the performance targets, including those derived from the conditions and other requirements arising from legislation and other approvals;
Page 9
30. 31. 32. 33. -8- 29.2. how the performance targets are to be achieved, 29.3. when the performance targets will be satisfied; 29.4. how performance will be monitored: 29.5. corrective actions and contingency measures to be undertaken; 29.6. reporting arrangements (including monthly reports to Council during construction), 29.7. auditing arrangements; 29.8. how the requirements are to be incorporated into construction and works contracts; 29.9. how the developers employees, contractors and the contractor's employees will be informed and trained with respect to the environmental protection requirements; and 29.10.enforcement. The Environmental Management Plan shall apply to all works and activities on all areas of the site and adjacent road reserves. In particular, but without limitation, the Environmental Management Plan shall address the following issues in relation to the construction and operational phases of the development: 31.1. legislative compliance; 31.2. vegetation protection, 31.3. fauna and fauna habitat protection; 31.4. weed control; 31.5. pest control; 31.6. soil erosion and sediment control; 31.7. water quality protection; 31.8. groundwater protection; 31.9. air quality protection; 31.10.storage and handling of hazardous substances, 31.11.noise and vibration management, 31.12.waste management; 31.13. cultural heritage management, 31.14. visual amenity protection; 31.15. bushfire control; 31.16.environmental emergencies; and 31.17.community liaison. The Environmental Management Plan shall incorporate the requirement for monthly environmental compliance monitoring and audit reports to be submitted to Council for the construction stages of the development. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following: 32.1. Include tables of the monitoring results (digital form should be in Excel). 32.2. Include individual charts plotting the results for alf parameters required in the monitoring. 32.3. Include a brief written discussion of the results and recommend any necessary actions. The Applicant and ail future owners of the site shall comply with the relevant components of the Environmental Management Plan. This requirement will be included in the Community Management Statement for the units and the Lodge. Ecological Restoration Plan and Specifications 34, Prior to preparation of an Ecological Restoration Plan a quantitative survey shall be undertaken to identify the vegetative dynamics of the site.
Page 10
35. 36. -9- An Ecological Restoration Plan and Specifications shall be prepared for the site by a specialist restoration ecologist and submitted to Council prior to issue of a Development Permit for Operational Works. The applicant shall implement the Plan and Specifications. It shall apply to all areas covered by the Environmental Covenant as per Condition 5 and plantings surrounding the buildings shall be included as Ecological restoration works and not landscaping works (except around the Lodge where landscaping may be undertaken). It shall specify actions and works necessary to result in robust, self-sustaining viable plant communities and habitat. The following shail be addressed and included in the Plan and Specifications: 35.1. Document the current status of the areas requiring ecological restoration in terms of structure, floristics, missing elements, health, vigour, etc. 35.2. Formulate structural and floristic models for the plant communities requiring ecological restoration. 35.3. Specify the required works and actions for each area in terms of: 35.3.1. site preparation (this may include thinning, weed removal and control, etc.), 35.3.2. establishment of the missing floristic and structural elements, 35.3.3. habitat creation and reinforcement for native fauna and reinforcement of habitat linkages and corridors, 35.3.4. creating opportunities for regeneration from the seed bed, natural recruitment and the establishment of wildlings, 35.3.5. planting and mulching procedures, 35.3.6. — fertilizing procedures noting the low nutrient status of these ecosystems, 35.3.7. watering procedures, 35.3.8. protection from wildfire, particularly during the establishment phase, 36.3.9. erosion and sediment control, 35.3.10. on-going maintenance, 35.3.11. environmental safeguards, and 35.3.12. incorporation of the relevant requirements of all the management plans required by this approval, particularly the Fauna Management Plan, Fire Management Plan and the Environmental Management Plan. 35.4. The Ecotogical Restoration Plan and Specifications shall include all parts of the site where vegetation will be retained on the site. 35.5. The Ecological Restoration Pian will exclude the areas fronting the Lodge and Attunga Heights Road as these areas will be landscaped in accordance with Council's Planning Scheme Policy PSP1 - Landscaping Guidelines. All the relevant ecological restoration works and actions shall be undertaken by the applicant and completed prior to commencement of the use. Fauna Management Plan 37, 38. A Fauna Management Plan (FMP) shail be prepared and implemented prior to commencement of any works on the site. The FMP shall be submitted to Council for approval prior to issue of a Development Permit for Operational Works. The Fauna Management Pian shall specify the numbers and types of forage and habitat trees (particularly for Koalas and Glossy Black Cockatoos) to be planted in the vegetation areas . outside the ‘Development Area’, Particular attention shall be paid to the following areas: 38.1. The State Wildlife Corridor and the use of the area as a corridor for koalas. 38.2. Planting of Allocasuarina littoralis (for Glossy Black Cockatoos) and also appropriate hollow developing trees throughout all areas of retained vegetation and areas to be rehabilitated. 38.3. Protection and maintenance of the Burrowing Skink (Ophioscincus truncates) habitat. This information shall be included in the Ecological Restoration Specifications.
Page 11
39. 40. 41. 42. 43. -10- Nesting boxes of a range of sizes shall be installed in nominated trees. The number, type, size, location and purpose of the nesting boxes is to be specified in the Fauna Management Plan. The manner in which these nesting boxes are to be maintained shall also be specified. The Fauna Management Plan shall specify actions that shail be undertaken to protect and maintain the Burrowing Skink (Ophioscincus truncates) population and its habitat. Maintenance and protection of a closed-canopy rainforest community with wet understorey, damp leaf litter, loose soils and hollow logs must be addressed in the Fauna Management Plan. Consideration shall be given to the facilitation of fauna movement/linkages within and across the site when designing buildings and roads and placement of fences. No domestic pets shall be permitted on the site during construction. Residents and guests shall not be permitted to keep cats or dogs on the site. The owner shall prepare an environmental guideline for residents that explains the intent of the State Wildlife Corridor and how it shall be maintained and protected and this guideline shall be included in the Community Management Statement for all bodies corporate having control of any part of the site. Fire Management Plan 45. 46. 47. 48. 49. 50. 51. A Fire Management Plan shall be prepared for the site and submitted to Council for approval prior to issue of a Development Permit for Operational Works. The Fire Management Plan shall address: 45.1. Fire management and protection within the development. 45.2. Bushfire management and control in all the areas of Vegetation. 45.3. Provision of some firebreaks and fire hydrants, if required. 45.4. The need to retain, maintain and protect habitat for the Burrowing Skink (Ophioscincus truncates), which is wet understorey, thick damp leaf litter, loose soil and logs. The use of control burns will not be appropriate on this site. The Fire Management Plan for the developed areas shall address the following: 46.1. setback zones from retained native vegetation; 46.2. access between structures and vegetated areas; 46.3. proposed building construction methods, materials and designs to reduce fire risks; 46.4. gutter treatments to avoid the collection of leaves and other fire-prone material; 46.5. location of fire hydrants and water points, 46.6. access for fire fighters and emergency workers; 46.7. fire suppression and evacuation procedures; 46.8. ecological restoration measures to reduce fire risk; 46.9. owners and operators training and responsibilities; and 46.10.implementation procedures. The Fire Management Pian shall demonstrate a high level of environmental care and responsibility and be consistent with best practice for developments of this type in similar environments. The Fire Management Plan shall meet the provisions of the Queensland Fire and Rescue Service Act 1990 and shall be endorsed by the Queensland Fire & Rescue Service. The Fire Management Plan is to be implemented by the applicant and future owners of the site. The development shal! comply with the fire management plan, which shall be included in the Community Management Statement for the bodies corporate. The Developer shall provide a bushfire information kit to purchasers of the multiple dwellings on the site. The bushfire information kit shall be submitted to Council for approval as part of the Fire Management Plan.
Page 12
-ll- 52. The Fire Management Pian shall incorporate all the relevant requirements of, and be consistent with, all the other management plans required by this approval. Sediment and Erosion Control Plan sedinent aoe —e——— 53. Detailed staged Sediment and Erosion Control Plans shall be prepared for the site and implemented by the applicant. The Plans shall be in accordance with the Institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June 1996) and in particular using Checklist No. 3 from that document. The Sediment and Erosion Control Plans shall cover all development on site (during the construction, establishment and operational phases), ecological restoration and remediation works. All recommendations of the Plans shall be implemented. 54. The Sediment and Erosion Contro! Plans shall also ensure the protection of the areas of retained and enhanced vegetation and shall: 54,1. identify existing erosion problems, and 54.2. specify appropriate remedial actions. §5. All necessary erosion and sediment control devices shall be incorporated within the development precincts. The applicant must ensure that any person acting on this permit shall prevent erosion and sediment export from leaving the site or entering the creek. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Stormwater and Water Quality Management Plan 56. A Stormwater and Water Quality Management Plan for the site shall be prepared and implemented by the applicant prior to the issue of a Development Permit for Operational Works. 57. The Stormwater and Water Quality Management Plan shall take into account matters specified in section 19(4) of the Environmental Protection (Water) Policy 1997. 58. Key water quality objectives to be reflected in the Stormwater and Water Quality Management Plan are for the protection of aquatic ecosystems in the waterways of the site, areas adjoining the site, and the receiving waters of Noosa Inlet and the Noosa River. The low nutrient environment of the site and areas adjoining the site are the key factors in determining appropriate performance targets. Specifically, water quality objectives shall include the following performance targets, subject to the constraints of the catchments external to the site: 58.1. Total nitrogen tevels — 0.34 mg/l 58.2. Total phosphorous levels — 0.035 mg/l 59. The Stormwater and Water Quality Management Plan shall comply with and address the following issues in relation to the construction, establishment and operation phases of the development: 59.1. Identify all necessary stormwater treatment and water quality devices associated with the development, which shall be located within the approved boundaries of the development areas. §9.2. During the construction phase, monthly water quality monitoring and monitoring after significant rainfall events (at least two per year) shall be undertaken for: 59.2.1. suspended solids and turbidity, 59.2.2. temperature, 59.2.3. salinity, 59.2.4. total nitrogen, 59.2.5. total phosphorous, 59.2.6. pH, 59.2.7. trash and gross pollutants, and
Page 13
60. -12- 59.2.8. dissolved oxygen. 59.3. During the establishment and operation phases, water quality monitoring shall be undertaken every third month and monitoring after significant rainfall events (at least two per year) shall be undertaken for: 59.3.1. total nitrogen, 59.3.2. total phosphorous, 59.3.3. suspended solids and turbidity, 59.3.4, pH, 59.3.5. salinity, 59.3.6. temperature, 59.3.7. dissolved oxygen, 59.3.8. trash and gross pollutants, and 59.3.9. faecal coliforms. 59.4. The applicant shall continue this water quality monitoring for a period of 3 years from completion of the final stage of construction. In addition, the applicant shall undertake inspections for erosion and deposition, the build- up of trash and gross pollutants, and other water pollution. These inspections will be carried out every third month as well as after significant rainfall events, for a period of 3 years from completion of the final stage of construction. 59.5. An operational phase Water Quality Management Plan shall be prepared to the reasonable satisfaction of Council and address water quality performance targets, water treatment devices, water quality maintenance, requirements for stormwater management measures and devices. The plan shall demonstrate compliance with the prescribed water quality objectives. 59.6. Responsibilities under the Stormwater and Water Quality Management Plan shalt be clearly delineated. 59.7. Non-compliance with prescribed water quality standards will trigger the implementation of measures to rectify the problem(s). Reports on monitoring, incidents, corrective action and plan updates shall be submitted to Council every month during construction with Council being notified if any incident is recorded. These reports shall include information collected during the monthly monitoring program, shall highlight any non-standard results, and be submitted in a form acceptable to Council. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following: 60.1. including tables of the monitoring results (digital form should be in Excel); 60.2. include individual charts plotting the results for all parameters required in the monitoring (digital form should be in Excel); and 60.3. include a brief written discussion of the results and recommend any necessary actions. After completion of the construction stage of the development, these reports shall continue every three (3) months for a period of two (2) years, Water Quality Devices 61. Water quality control devices shall be installed generally in accordance with the Stormwater and Water Quality Management Plan. Detailed staging plans and specifications, based on and generally in accordance with the Plan shall be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works.
Page 14
-13- Drainage Works 62. 63. The applicant shall complete the drainage works progressively in conjunction with development of the site and generally in accordance with the approved Stormwater and Water Quality Management Plan. Detailed drainage plans and specifications, based on and generally in accordance with the approved Drainage Plan, the EMP and these Conditions, shail be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. Ail drainage works as required by the Drainage Plan shall be provided by the applicant at their own cost. Roadworks Contributions 64. A roadworks contribution of $19,045 towards the upgrading of the local traffic area of Noosa Hill shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the.date of payment. The money will be used to assist Council with the cost of intersection improvements at Viewland Drive/ Noosa Drive and the addition of traffic calming devices along Nairana Rest and the Quarter Deck. Vehicle Access 65. 66. Vehicular access driveways from Alma Way to serve the units shall be a minimum width of 5.5 metres. Plans and cross-sections of the proposed driveways shall be submitted prior to approval of a development application for Operational Works. These drawings will demonstrate that the driveways are designed to Council's design standards and AS2890.1 at grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any level difference. : Vehicle Access Easement 67. Avehicle access easement shall be created over Alma way to service the units. In this regard, plans submitted for Operational Works approval shall accurately show the location of the easement. A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Carparking Off Street 68. The carparking area shall be designed to comply with the provisions of AS 2890. 1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. The design shall consider the requirements of Conditions 2 and 3. 69. A minimum of 39 carpark spaces and 3 additional motorbike/bicycle parking spaces for the Multiple Dwellings, and 10 carpark spaces in tandem shall be provided for the Lodge with 2 bicycle spaces. 70. Car parking arrangements at the Accommodation Building (Lodge) may be in tandem. All other spaces shall comply with the requirements of AS2890.1-2004, Traffic Management for Morwong Drive and Viewland Drive (30 Dwelling Units) 71, a) Access is to be via Viewland Drive from 7:00 am to 7:30 pm and from Morwong Drive from 7:00 pm to 7:30 am. b) Owners and guests are to be informed of the site access arrangements. c) Local taxi companies are to be informed of the access arrangements on site. d) In conjunction with the developer / owner of Lot 106 on SP 151406 (the Viridian Site), the Developer is to provide sufficient information at the Morwong Drive entrance and at the Viewland Drive entrance to Alma Way to enable a person seeking vehicular access to the multiple dwellings to locate the alternative access if the access initially chosen by the person is closed.
Page 15
-14- e) Vehicles of Owners and Visitors must not be driven on Alma Way South after 7:00pm or parked on Alma Way at any time. f) Garbage removal vehicles are to be limited to standard garbage trucks. g) Service garbage and delivery vehicles may operate only between the hours of 8.00am and 5.00pm Monday to Saturday. Vegetation Protection 72. 73. 74, 75. 76. 77. 78. 79. 80. Vehicular pavements within the drip zone of any of the existing trees on site to be retained shall be designed as a pervious pavement (such as grass paving cells or similar), as this will allow water that falls on this surface to penetrate to the trees root system. The pavement shall be constructed so as not to damage the tree or their root system and in this regard temporary fencing shall be provided around the trees during construction to help protect them. Plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious pavement and the temporary fencing prior to obtaining a Development Permit for Operational Works. Vegetation removal, tree felling and lopping shall be undertaken in an environmentally sensitive manner to avoid damaging surrounding vegetation, trees and habitat. Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos, possums) by a qualified wildlife spotter. If wildlife species are present, the tree shall not be felled or lopped until the wildlife has left the tree. All cleared vegetation shall be suitably processed or removed from the site by a method approved by Council. Environmental weed species cleared from the site shall not be mulched. Vegetation material from environmental weed species shall be removed from the site and disposed of in a Council approved refuse tip. ‘ Burning off is not considered an acceptable means of disposal and is not to take place. During construction, the boundaries of areas of retained and protected vegetation of and adjoining the site shall be clearly marked for the purpose of preventing access into these areas thereby protecting the vegetation and habitat values. All underground services, drainage, footpaths, bikepaths, roads and other works shalt be located to minimize adverse impacts on retained vegetation, particularly their root system. Weed and Pest Species Control 81. 82. 83. 85. 86. Alt plants listed as environmental weeds by the Queensiand Herbarium or listed as Undesirable Plant Species by Noosa Council shall be removed and/or treated prior to commencement of the use, Prior to entering the site or Lot 106 on SP 151406 (the Viridian Site), all construction machinery and vehicles shall be washed down to remove soil that may contain weed seeds, soil pathogens and pest species. Ail nursery stock shall be weed, pest and disease free and certified as such by the supplier. The certificates are to be obtained prior to the commencement of any landscaping works on site and shall be made available to Council upon request. All mulch produced on site by mulching cleared vegetation and trees shall specifically exclude material (particularly seeds) from environmental weed species (eg. lantana, asparagus and umbrella trees). Soil disturbance shall be kept to a minimum to avoid weed proliferation. The eradication and control of environmental weeds will be an integral part of both the Ecological Restoration Plan. Vegetation used in restoration work shall exclude environmental weed species.
Page 16
-15- Park Contributions 87. A Park contribution of $81,120 towards the acquisition of additional parkland or the improvement of existing parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit for Operational Works in accordance with Council's Planning Scheme Policy PSP24 Park Requirements. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the date of payment. Frontage Works 88. 89. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Attunga Heights Road frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds. Ail redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council's Standard specifications prior to commencement of the use permitted by this permit. Pathway Contributions 90. An estimated pathway contribution of $18,234.00 towards external major pathways, in accordance with Planning Scheme Policy PSP41, shall be paid to the Council prior to obtaining a Development Permit for Operational Works, The amount shall be calculated in accordance with the policy current at the time of payment and will be subject to variations in the Consumer Price Index, Ail Groups Brisbane from March 2005 until the date of payment. Stormwater Drainage 91. 92. 93. 94. All stormwater drainage shall be collected on-site and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged to the existing waterway traversing the site. The stormwater shail be discharged so as not to cause any scour or damage to the waterway. Roof runoff shall be directed to an approved rainwater storage system or tank (minimum storage 2000 litres per dwelling and 8500 litres for the Lodge). To ensure that polluted run-off does not enter Council's stormwater drainage system, stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in a gross pollutant trap provided on site prior to being permitted to discharge into Council's drainage system. All other clean stormwater, such as roof water, shall be collected on site and discharged through a single underground drain line directly into the existing drainage system, bypassing the gross pollutant trap. To this end, a detailed maintenance plan shall be prepared for the proposed gross pollutant trap, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. The approved maintenance plan shall be incorporated in the Community Management Scheme for the development and a copy of this shall be provided for Council's records prior to commencement of the approved Use. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. All site stormwater drainage shall be by means of a gravity system. Water & Sewer Infrastructure 95. 96. 97. The applicant shall provide written evidence of approval to construct both the sewer connections and water connections, through the adjacent Viridian Noosa Site, that are required to service the proposed development. The applicant shall demonstrate that the advance construction of conduits in the adjacent Viridian Noosa Site to facilitate connection of water and sewer to the proposed development has been completed and correspond with the drawings to be submitted for operational works. The applicant's approved contractors shall construct all water supply and sewer lines in the adjacent Viridian Noosa Site with due care and reinstate any and all areas disturbed to the satisfaction of Council and Viridian Noosa.
Page 17
98. 99. 100. 101. 102. -16- Council will permit only one (1) metered water connection to be provided from the existing 150mm Council water main, along Alma Way in the Viridian Noosa Site, to service the development. A separate metered connection from the Council main in Attunga Heights will be permitted to service the separate allotment accessed from Attunga Heights. The points of sewer discharge from the site into the existing Council system in Alma Way shall be to the standards and requirements of Council’s Planning Scheme Policy PSP6 - Engineering Design Standards Water & Sewerage. The points of discharge shall be a minimum of 20 metres from the nearest house connection branch. Any internal sewerage pump station shall be constructed to the standards and requirements of Council’s Planning Scheme Policy PSP6 - Engineering Design Standards Water & Sewerage and shall include magnesium hydroxide dosing to minimise odour from rising main discharge. Any modifications to existing sewers required to accommodate pump flows including but not limited to poly-lined manholes, gas check manholes and boundary traps shall be constructed at the applicant's expense. Concept master plans to be submitted indicating the location of the proposed sewerage pump station(s), sewer main and water supply infrastructure for preliminary approval prior to lodgement of plans for Operational Works. These plans are to include but not be limited to — location of sewerage pump Stations, rising mains, gravity sewers and water mains. Plans are also to indicate the area to be disturbed by construction, method of crossing creek and methods to be utilised to stabilise slopes and batters. Sewer Mains 103. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in accordance with Council's standards and requirements at no cost to Council. Town Water Supply 104. 105. The site shall be connected to Council's existing town water supply and be constructed in accordance with Council's standards and requirements at no cost to Council. Fire hydrants are to be provided throughout the development in accordance with Council Engineering Design Standards and in accordance with Queensland Fire Service Standards. Service Easements 106. A registered easement shall be created over the zone of influence of all sewers within the subject site and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0m wide. In this regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary width of the easement, which shall be shown on any plans submitted for Operational Works / Building Works approval. To this extent the surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to be created. In addition to this the Applicant's Solicitor shall give Council's Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. . A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Any changes required by Council's Solicitor must be corrected immediately. Headworks Contributions 107, Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates under the current policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from March 2005 until the date of payment.
Page 18
-17- Water Supply $150,085 Sewerage $113,401 TOTAL $263,486 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. Earthworks 108. 109. 410. Alt earthworks carried out on site for construction activities shall be undertaken in accordance with the “Geotechnical Investigation: Proposed Housing Development — 26 Attunga Heights, Noosa Heads, Queensland” dated November 2003 and the further report dated 7 July 2004. The applicant shall ensure the building designs and the type of foundation system(s) are certified by a Geotechnical Engineer or similar qualified expert. This information shall be submitted to the Council prior to obtaining a Development Permit for Operational Works. In the sand dune area, unsupported temporary excavations are not to exceed 1.0 metres in height and are to be formed no steeper that 30 degrees. General 411. 112. 413, Prior to undertaking any excavation, the applicant must ensure that any the person acting on this permit shall contact public utility service providers to ascertain the location of their underground services. The applicant must ensure that any person acting on this permit applies for and obtains all other necessary permits including crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals required under any other Act or local law. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath, kerb and gutter, or other Council property damaged as a result of construction of the proposed development. The applicant must ensure that if any person acting under this permit damages any Council property or facilities (such as underground drainage, water supply and sewerage), through any cause whatsoever in the course of, directly or indirectly carrying out development, that person notifies the Manager - Land Development of the Council and rectifies the damage at its cost and to the satisfaction of the Manager - Land Development of the Council. Alternatively, the Applicant may request the Council to carry out the rectification works, at the applicant's cost Any damage to a water main shall be rectified by Council, at the applicant's cost. Any damage to a sewer main shall be undertaken by either Council or a Council approved contractor, at the applicant's cost. In all cases, Council reserves the right to carry out rectification works in an emergency and where no reasonable attempt has been made to complete the rectification works as part of the development. : All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of the Plan of Survey. Building 114. The Geotechnical report submitted as part of the application has been appraised and approved subject to the following conditions:- 114.1. There is to be no uncontrolled discharge of water onto the slope; 114.2.Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it should be reinstated immediately after construction is completed;
Page 19
-18- 114.3.Additional load due to fill, construction equipment or stockpiled materials should not be located on the dune slope; 114.4. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating, earthmoving or demolition machinery or other similar construction techniques; 114.5. The construction management plan is to be adhered to; 114.6.Copies of all inspection reports by engineers are to be submitted to Council within 5 business days of the inspection taking place; 114.7.Boundary wall movement shall be monitored throughout construction by a Registered Professional Engineer of Queensland (RPEQ) and if movement occurs construction is to be stopped immediately and appropriate action is to be taken to arrest the movement. Further work shail only take place after a re-assessment of the conditions on site; 114.8.4 RPEQ is to be engaged by the client to oversee the piling works and copies of all inspection reports are to be submitted to Council within 5 business days of the inspection taking place; 114.9. The applicant’s Geotechnical engineer will be required to be on site for the whole of the time during any excavation. The construction of the whole of the foundations is to be supervised and directed on site by a consulting Geotechnical engineer. No work of any such kind relating to the foundations shall be carried out if a geotechnical engineer is not on the site and supervising and directing this work. Such works shail only be carried out during dry weather conditions and if there is a risk of sand movement occurring, all work shall be suspended until such steps, approved by the applicant's Geotechnical engineer and the Council's Building Surveyor, have been taken to ensure that no further slippage will result. Environmental Health 115. 116. 117. An annual licence and registration of the premises is required under the Food Hygiene Regulation 1989 from Council's Environmental Health Section for the guest house kitchen. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner which prevents a noise nuisance beyond the subject land in accordance with the environmental nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines may apply for such offences. Noise emission from air conditioning equipment shall comply with the following requirements: 117.1. The equipment shall be installed and located in a manner which prevents noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 and Council's Local Law No. 12 - Control! of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences. 117.2.Submission of written certification from a suitably qualified person confirming that the noise levels comply when measured at the nearest residential boundary. This is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. 117.3. Subject to the Environmental Protection Regulation 1989, the applicant must ensure that equipment is not used on any day if it makes or causes noise to be made — 417.3.1. Before 7am or after 10pm: More than the lower of either — © 40 d(B)A ¢ 3 d(B)A above the background noise level 117.3.2. From 7am to 7pm: More than the lower of either ~— « 50 d(B)A . 5 d(B)A above the background noise level 117.3.3. From 7pm to 10pm: More than 3 d(B)A above the background noise level.
Page 20
118. 119. 120. 121. 422. 123. 124. -19- The beauty treatment room shall not perform skin penetration operations unless an approval is obtained under the Public Health (Infection Control for Personal Appearances Services) Act 2003. The developer must provide screened imperviously paved areas large enough for all refuse and recycling bins throughout the development. Suitably designed wash down areas are required with cold-water tap, hose and drain outlet connected to sewer for the cleaning of bins and the refuse transport trailer. The drain outlet is to be designed to prevent stormwater entry to the sewerage system. The storage areas shall be setback a minimum of 10 metres from the high bank of the creek. A plan of the service area for waste bins along Alma Way and storage location of the waste collection vehicle is required to be submitted for assessment with the application for a Development Permit for Operational Works. This service area shall be setback a minimum of 410 metres from the high bank of the creek. : A Trade Waste Permit is required to discharge each type of Trade Waste. The hydraulic drawings are to show all the Trade Waste requirements in accordance with the Noosa Trade Waste Policy. The bin washing area is to be roofed and the floor is to fall toa bucket trap with the waste pre- treated by a grease arrestor prior to discharge to the sewer. Rain water is to be excluded from the bin washing area. Bin washing is to take place only at the bin washing area. Full truck access is to be provided to each grease arrestor and/or pre-treatment device for cleaning and servicing. Where access is restricted, a pump out line is required. A nominated car wash down area is to be provided showing adequate pretreatment of trade waste. Contaminated Land 125. At all times while the subject land is on the Environmental Management Register (EMR) the applicant must comply with the approved Site Management Plan (SMP) for Lot 1 on RP 136508 issued under the Environmental Protection Act 1994 by the Environmental Protection Agency (Contaminated Land Unit).
Page 21
ADVICE LOCAL LAWS, POLICIES & STATE REGULATION REQUIREMENTS INTEGRATED PLANNING ACT 1997, (DAS DEVELOPMENT APPLICATION 10. A Development Permit for operational works for clearing vegetation is required in accordance with Schedule 8, Part ,1 Table 4, Item 1A of IPA. It is recommended this approval be sought prior to seeking other necessary development permits for the site. Prior to lodging a development application for clearing vegetation, a determination from the Chief Executive of the Department of Natural Resources, Mines and Water should be sought to confirm the purpose of the clearing is a relevant purpose under section 22A of the Vegetation Management Act 1999 (VMA). An application for clearing vegetation must demonstrate compliance with the Regional Vegetation Management Code for Ongoing Clearing Purposes — South-East Region (VM Code). In particular any clearing involving ‘of concem’ remnant vegetation requires a suitable offset to meet the performance requirements of the VM Code. The application will also need to demonstrate the proposed setback to the creek complies with the relevant performance requirements of the VM Code and demonstrate viable networks of wildlife habitat will be maintained on the site. Taking of protected flora and fauna requires a permit under the Nature Conservation Act 1992. Approval of this development application will trigger an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of $50,995.00. This amount is subject to variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the integrated Planning Act 1997. Payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit or for infrastructure charge notices issued separately. Please note that Council will not seal a Standard Building Format Plan / Building Format Plan / Volumetric Plan until all conditions of approval have been satisfied. The Environmental Protection Regulation 1989 and Local Law No. 12, prevent a builder or building contractor carrying out building werk on a building site in a way that makes or causes audible noise to be made from the building work:- 6.1. Ona Sunday or public holiday, at any time; or 6.2. On a Saturday or a business day, before 7.00am or after 6.30pm. A maximum penalty of $1,500 applies to an offence under under the Environmental Protection Regulation 1989. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Commonwealth Disability Discrimination Act 1992 in regard to the installation of disabled access and the provision of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia. Pursuant to the Building and Construction industry (Portable Long Service Leave) Act 1997 if the cost of operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. The applicant is to submit two (2) sets of professionally drawn scale plans in compliance with Council's Code controlling food establishments for approval by Council's Environmental Health Section, for any food premises proposed to be included in the development. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a water course. On the spot fines may apply for such offences.
Page 22
LIST OF SUBMITTERS INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Name ALLAN MILLER QLD BILL WATSON BRENDAN & RUTH MOY BW & DIM SMYTH RICHARD HACK C/- JONES FLINT & PIKE, DAVID & MARGARET TREZISE DG & RM BANNEY ELIZABETH MCGOWN ERNST & MARY LOUISE WILLHEIM HEIDI ROTH IAN BEGLEY, MANAGING DIRECTOR, BEGLEY EQUITIIES IVY POCOCK JEFF & SUE SCOUGALL JO ANDERSON JOHN & MARY LOU LITTLE JOHN & PATRICIA ELDRIDGE JOHN BURGE JOHN MORRIS KAYE MORRIS LEON GEYSHEN & JUDITH GARDEN MARGARET PRICE MAUREEN KENT, PRINCIPAL SUBMITTER SECRETARIAT, NOOSA PARKS ASSOCIATION PETER & ANNE LAMBERT R & M BARRINK S DAVIES S DAVIES STEVEN NAPIER STUART LAUDER SUSAN SCOUGALL, PRINCIPAL SUBMITTER SUSAN SCOUGALL BOB BORGER, DIRECTOR, VIRIDIAN NOOSA PTY LTD Address 6/ 17 ATTUNGA HEIGHTS ROAD NOOSA HEADS 4/18 WILLIAM STREET MUNNA POINT QLD 4566 4/200 BAROONA ROAD PADDINGTON QLD 4064 3/4 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 PO BOX 6 MAROOCHYDORE QLD 4558 3 ATTUNGA HEIGHTS NOOSA HEAOS QLD 4567 PO BOX 306 NEW FARM QLD 4005 TINDERBOX FARM TINBERBOX TAS 7054 77 EMPIRE CIRCUIT FORREST ACT 2603 23 MORWONG DRIVE NOOSA HEADS QLD 4567 PO BOX 1837 GEELONG VIC 3220 11 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 9 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 56 MARTINS ROAD EUMUND! QLD 4562 1/ 28 VIEWLAND DRIVE NOOSA HEADS QLD 4567 2/29 VIEWLAND DRIVE NOOSA HEADS QLD 4567 1885 MALVERN ROAD MALVERN EAST VIC 3145 23 MORWONG DRIVE NOOSA HEADS QLD 4567 17 EUGARIE STREET NOOSA HEADS QLD 4567 22 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 PO BOX 1292 NOOSA HEADS QLD 4567 141 THE QUARTERDECK NOOSA HEADS QLD 4567 PO BOX 836 NOOSA HEADS QLD 4567 1 NAIRANA REST NOOSA HEADS QLD 4567 24 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 32 ANGLER STREET NOOSA HEADS QLD 4567 32 ANGLER STREET NOOSA HEADS QLD -4567 2/10 ATTUNGA HEIGHTS NOOSA HEADS QLO 4567 9/41 GRIFFITH STREET NEW FARM QLD 4005 9 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 9 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 GPO BOX 2955 BRISBANE QLD 4001
Page 23
AMENDMENTS
oare: | DESCRIPTION: tsSUED BY:
REVISED TOW PLARNING
1205.05 | REVISED TOWN PLANNING
21.08.05 | RESPONSE TO NSC [email protected]}
10.07.95 | RESPONSE TONSC PRELIM APP.
10.08.08 |FOR NSC FOUL APP.
Feepenes to Prelim approval (21.07.05)
- |= fo =|» [a
E
8/2 |2 (2 |2
2} 2810.05 [FoR NSC DIAL APP.
& [ozoses [GENERAL T REVISION GH
NOTES:
‘rity al dimensions on site before the commencement
of any new constuction work, elssations or shop drawings -
taka measured dimersions in preference to any sceled
dimensions
Conply to tha folowing or any other relevant codes:
- Baking Code of Resa
+ Local Autharties Rules end Guidelines
-Loval suburt covenants manual
- Apply oll eppbicabie AUSTRALIAN STANDARDS whore.
ralevent induding:
Agoass and Mobilty Codes AS 1428.1 & 1428.2
Larges Scale Drewings Tako Procedence to erator acete
J M A
ARCHITECTS
QUEENSLAND PTY LTD
Lev 1 457 Uppor Edward et, Keniyon Cenivo,
Brisbane Quvendiand, 400, Australie
0, Box 380 Spring Hit 4
Email: jmag@jm
ACN: 101 185271 ABN:
TEL: 07 38353794
MOBILE PHONE;
FAX: 07 38306112
0418 744 110
(¢) COPYRIGHT
THESE DESIGNS, PLANS AND SPECIFICATIONS
ANO COPYRIGHT THEREIN ARE THE PROPERTY OF
‘SMA ARCHITECTS QLO PTY LID
AND MUST NOT BE USED, COPIED OR REPRODUCED
WHOLLY OR IN PART WITHOUT THE WRITTEN
PERMISSION OF THE COMPANY
AMA ARCHITECTS QLD PTY LID
CUENT HARDING
08 HARDING RESORT
Locanion —_ATUNGA HEIGHTS
NOOSAHEADS QLD
PROPERTY | LOT 27 RP 89506
DESCRIPTION
08 No, 978
pare. JULY 2005
SONE 1:2000@ A1 1 1:4000@ A3
we NATIONAL PARK
~ Fesemend 6 on RPS —— 7 Eexemert aon RAS Bs
a
aTPRocaty
eg] |
amy g wos
2
s BAYVIEW NOOSA ae ao me
= S EVI MENT } : =
toon, 4 a
02 RP 136508 =
me wm Be
ie | Ey | Bhs
oy
re
a
DRAWING INDEX SCHEDULE OF AREAS
GFA No. TOTAL
DA-0000 LOCALITY PLAN & DRAWING INDEX 1:2000@A1 1:4000@A3 lobar GASEMENT ‘oom
GROUND FLOOR 690m?
DA-0001 — SITE PLAN 4:500@A1 1:1000@A3 FIRST FLOOR 435m
DA-0002 SITE SETOUT PLAN - PARTA 4:200@A1 1:400 @A3 TOTAL WaiaarINo Than
DA-0003 SITE SETOUT PLAN - PART B 4:200@A1 1:400 @A3 can Wea cnouno Flom om
DA-0004 —- SITE SETOUT PLAN - PART C 1:200@A1 1:400 @A3 GROUND FLO 75a
DA-0005 SETOUT PLAN - SITE SETBACKS 1:250@A1 1:500 @A3 LOFT FLOOR samt
DA-0008 © SETOUT PLAN - BASEMENT 4:200@A1 1:400 @A3 On Gare wan
DA1001 GENERALARRANGEMENT-LODGE- BASEMENT 1:100@A1 1:200 @A3 CABIN TYPE 8 GROUND FLOOR te
DA-1002 GENERALARRANGEMENT-LODGE-GROUND 1:100@A1_—1:200 @A3 FIRST FLOOR Jor
DA-1003 GENERALARRANGEMENT - LODGE - FIRST 1:100@A1 1:200 @A3 = a aa
DA-1004 GENERAL ARRANGEMENT - CABINS 4:100@A1 1:20 @A3
CABIN TYPE C GROUND Fagor som
DA-3001 ‘SITE SECTIONS - SECTIONS 1,2,3,4 1:250@A1 1500 @A3 FIRST FLOOR aor
DA-3002 SITE SECTIONS - SECTIONS 5,6,7 1:250@A1 1:500 @A3 — ~~ ——
DA-3003 SITE SECTIONS - SECTIONS A,B,C 1:500@ Ai 1:1000@A3
GFA TOTAL 460m? 4110m"
COVERED CIRCULATION 500m 480m?
SUSPENDED CARPARKING 950m?
SITE AREA 18,010.91m*
SITE COVER 9.1%
CARPARKING Cars
47 No
Buggies / Bikes
2No.
DRAWN. JMA cHecxep IMA
omens 1 OCALITY PLAN
COVER SHEET
crawncn, 978 DA0000
tesuE K
prarowe 2/03/2006
DEVELOPMENT APPROVAL
Page 24
AMENDMENTS:
\o t {oaTe: | DescRETION: ISSUED BY:|
24.03.05 | REVISED TOWN PLANING
1205.05 | REVISED TOWN PLANKING
2ROA05 | RESPONSE TO NSC MEETING (7
19.07.05 | RESPONSE TO NSC PRELIM APP.
40.0008 | FOR HSC NAL APP
response to Pretin approval (21.07.05)
~ |= Jo |m In
@ /2 |2 2 |=
2_| ar1o0s |For Nsc FNAL APP
ie
| 0203.08 [GENERAL T REVISION GH
NOTES:
‘Vey all imersions an site belore the commencement
of any naw construction work, alterations or shop drawings -
take measured dnorsions in preference ko any scaled
dimensions
Comply to the tolowing or any other relevant codes:
+ Buriding Code of Austra
Local Ahorites Rudess ered Guidelines
~ Loval suburb covenants manual
~ Apply of applicable AUSTRALIAN STANDARDS where
relevant, indocinge
~ Access and Moblity Codes AS 1428.1 & 14282
Largar Scabe Drawings Taka Precedence lo sller aceto
J M A
ARCHITECTS
QUEENSLAND PTY LTD
Lov 1 457 Upper Edword si, Keniynn Centro,
Brisbane Queensiand, 4000. Australia
MOBILE PHONE: 0448 794 110
oe IS OES FO 7 (©) copyright
THESE DESIGNS, PLANS AND SPECIFICATIONS
AND COPYRIGHT THEREW ARE THE PROPERTY OF
JWA ARCHITECTS QLD PTY LTD
AND MUST NOT BE USED, COPIED OR REPRODUCED
WHOLLY OR IN PART WITHOUT THE WRITTEN
PERMISSION OF THE COMPANY
UMA ARCHITECTS QLO PTY LTD
SITE SECTION ‘STE SECTION
Proposed North Proposed South a ee
Cabin Pod = Cabin Pod Proposed Lodge Po HARDING RESORT
LOCATION ATUNGA HEIGHTS
NOOSA HEADS QLD
PROPERTY LOT 27 RP 89506
ESCRIPTION
HARDING
Legend
208 No 978
10m zone from centre line of intermitent creek
T “7 "Development Area” indicating major construction activity pare. JULY 2005
zone as refered to by Condition 8 of NSC Decision Notice
LL _J cated 21st Juty 2005 cut 118006 At 4:1000043
4 "Development Area" indicating minor construction activity
zone for services infrastructure as refered to by Condition cravn IMA IMA
8 of NSC Decision Notice dated 21st July 2005 CHECKED
DRAWNOTTLE SITE PLAN
i Elevated timber decking and structure, . SITE
Roads, parking and pathways constructed on solid ground
{existing or fill) with cut as required. The only at grade pathwa
is the winding pathway from footbridge to mid pod
Cee Proposed Retaining Wali
prawnone, 978 DA0001
ISSUE K
eantowe 2/03/2006
DEVELOPMENT APPROVAL
Page 25
DATE: | pescrTion: 24.0808 | REVISED TOWN PLANING 120505 | REVISED TOWN PLANING 28.00.05 | RESPONSE TO NSC MEETING: 19.07.05 TONSC PRELIM APP. 10.08.05 |FOR NSC FINAL APP $0 Pref approval Sediment Erosion Control, Refuse, | oz006 ARRANGEMENT: oH “f NOTES: \Veify el demensions on site before the commencement = of any new construction work, afteraions or shop drawings - “f= JJ take measured dimensions in preferance ls any ecaled mensions ‘Comply to tha flowing o ary other relevent codes: = Building Code of Astrafin ~ Local Authoriies Rules and Guidatnes ~Loval eubueb covenants manual + Apply alt applicable AUSTRALIAN STANDARDS where: relevant, incding: = Termite Barter AS 9660.1 = Acvess ond Mobily Codes AS 1428.4 & 1428.2 Lergor Scale Drawings Teke Procedenca ib smaller scale J M A ARCHITECTS . QUEENSLAND PTY LTO Diiplex cabins. over pi “— "| eitene Ghoraind a Rute Below grouiid o | 20.8080 Spring Hil 4004 OLD AUST ee ae THESE OESIGNS, PLANS AND SPECIFICATIONS. ANO COPYRIGHT THEREIN ARE THE PROPERTY OF MA ARCHITECTS QLO PTY LTD ‘AND MUBT NOT BE USED, COPIED OR REPRODUCED WHOLLY OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE COMPANY JHA ARCHITECTS QLD PTY 11D HARDING HARDING RESORT ATUNGA HEIGHTS NOOSAHEADS —QLO SITE SETOUT PLAN - PART A. LOT 27 RP 89506 SCALE 1:200@ AT /1:400@ A3 ae " DESCRIPTION 978 Legend JULY 2005 10m zone from centre line of intermitent creek 1:200@ A1 / 1:400@ A3 “Development Area’ indicating major construction activity Oe zone as refered to by Conditlon 8 of NSC Decision Notice dated 21st July 2005 DRAWN. JMA cHeckeo IMA. "Development Area" indicating minor construction activity oe 7 te ~ y | ORANISTME SETOUT PLAN - PART A zone for services infrastructure as refered to by Condition 7 7 ” a . . 8 of NSC Decision Notice dated 21st July 2005 We - . SITE Elevated timber decking and structure. Roads, parking and pathways constructed on solld ground DRAWING No. 978 DA0002 (existing or fill} with cut as required. The only at grade pathwa: is the winding pathway from footbridge to mid pod SCALE 1:2000@ At / 1:4000@ AS BOE K Proposed Retaining Wall erovoare 2/03/2006 DEVELOPMENT APPROVAL
Page 26
fii Uy He Ys
i EE Lg | WL
SITE SETOUT PLAN - PART 8.
SCALE 1:200@ At / 1:400@A3
Legend
40m zone from centre line of intermitent creek
T “| "Development Area” indicating major construction activity
zone as refered to by Condition 8 of NSC Decision Notice
LL LJ dated 21st suty 2008
a "Development Area" indicating minor construction activity
zone for services infrastructure as refered to by Condition
A 8 of NSC Decision Notice dated 21st July 2005
lh Elevated timber decking and structure.
Roads, parking and pathways constructed on solid ground
{existing or fill) with cut as required, The only at grade pathwa:
is the winding pathway from footbridge to mid pod
A, Proposed Retaining Wall
SCALE 1:2000@ At / 1:4000@A3
AMENDMENTS
DATE: | DESCRIPTION:
2400.05 | REVISED TOWN PLANING:
12.0505 | REVISED TOWN PLANNING
‘2.0805 | RESPONSE TO NSC MEETING (7.05)
- |= [0 |» |» [B
19.07.05 | RESPONSE TO NSC PRELIM APP,
baa
10.08.05 | FOR NSC FOAL APP
response to Preien approval (710705)
2_| 2210.05 [FoR WSC FOAL APP.
2
Sediment Erosion Control, Retsse,
i Tear
| o2nae [GENERAL ARRANGEMENT REVISON GH
NOTES:
Verity al mansions on sit before the commencement
of any new construction work, attains or shop drenings =
{aka measured dmensions in prefarence to ery ecalod
dimensions
Comply to the folewring or any other relevant codes:
Apply ll applicable AUSTRALIAN STANDARDS where
rolovern,
+ Terrrite
Access
Langer Scate Drawings Toke Precedence io smaller scala
inokxing:
Bertier AS 3660.1
and Mobitty Codes AS 1428.1 & 1428.2
J M A
ARCHITECTS
QUEENSLAND PTY LTD
Lev 1 457 Upper Edward t, Kertynn Contra,
Brisbane ueentiand, 4000, Australia
P.O, Box 380 Spring Hil 4004 QLD AUST
ACN: 101 166.274
‘TEL 07 38390794
MOBILE PHONE:
mall: imo, m
(c) COPYRIGHT
THESE DESIGNS, PLANS AND SPECIFICATIONS
aen HARDING
x0 HARDING RESORT
LOCATION ATUNGA HEIGHTS:
NOOSA HEADS QLo
DESC TON LOT 27 RP 69506
vom «978
owe, JULY 2005
con, ——1:200@ A111:400@ A3
DRAWN, JMA cHeexen JMA
DAMNGTTE SETOUT PLAN - PART B
prawncne 978 DA0003
s8UE
SITE
K
PRINT OATE
2/03/2006
DEVELOPMENT APPROVAL
Page 27
AMENDMENTS DATE: | DESCRIPTION: 24.0205 | REVISED TOWN PLANING: 1205.5 | REVISED TOWN PLAKNING. ‘22.0005 | RESPONSE TO NSC MEETING (27.05 19.07.05 | RESPONSE TO NSC PRELIM APP- 10.08.03 | FOR NSC FORAL APP resporse tu Prin approval (71.07.06) ~ |= lo |» |n |B ball a J} 24.1005 [ron isc FRuAL APP Sediment Eroston Control, Ratuee, oe ire | 0203.05 [GENERAL ARRANGEMENT REVISION GH. NOTES: ‘Verify af dmensions on sits betora the cornmencament of sry new construction work, altsratians er shop drawings - lake meseured denersions in preference to any seated < ‘Comply tothe folowing or any other relevent codes: + Building Coda of Ausraia Local Autores Pules and Guideines - Loyd suburb covenants manual Apply all applicabla AUSTRALIAN STANDARDS where relevant, inducing + Terrie Baier AS 3660.1 ~ Recess end Mobilly Codes AS 1428.1 4 14282 Larpar Scale Drewings Take Precedence to ematier scale J M A ARCHITECTS QUEENSLAND PTY LTO Lev 1457 Upper Edward et, Kentynn Centro, Brisbane Quoonsiond, 4000, Australia PO, Box 380 Spring Hil 4004 QLD AUST Email: [email protected] ACN: 101 185.271 ABN: 48 108 165271 TEL:07 38300794 FAX: 07 MOBILEPHONE: 0418 74 (c) COPYRIGHT THESE DESIGNS, PLANS AND SPECIFICATIONS AND COPYRIGHT THEREIN ARE THE PROPERTY OF JMA ARCHITECTS QLD PTY LTD AND MUST NOT BE USED, COPIED OR REPRODUCED WHOLLY OR 8 PART WITHOUT THE WRITTEN. PERMISSION OF THE COMPANY IMA ARCHITECTS QLO PTY LTD CLIENT HARDING (1) GROUND FLOOR PLAN 8 HARDING RESORT LOCATION ATUNGA HEIGHTS. NOOSA HEADS QLD PROPERTY SITE SETOUT PLAN - PART C My LOT 27 RP 89506 a PRELIMINARY ONLY ~ Legend FOR DISCUSSION PURPOSES ONLY or, JULY 2005 40m zone from centre line of Intermitent creek SCALE, 1:200@ A1 / 1:400@ A3 [7 7] ‘Development Area” indicating major construction activity craw IMA ceccnep JMA zone as refered to by Condition 8 of NSC Decision Notice : PRAWNS TINE SETOUT PLAN - PART C SITE dated 21st July 2005 “a "Development Area” indicating minor construction activity zone for services Infrastructure as refered to by Condition A 8 of NSC Decision Notice dated 21st July 2005 vt Elevated timber decking and structure. Roads, parking and pathways constructed on solid ground t (existing or fill} with cut as required. The only at grade pathwa’ qi is the winding pathway from footbridge to mid pod oramon, 978 DA0004 ISSUE K Bre Proposed Retaining Wall OT pantoare 2/03/2006 DEVELOPMENT APPROVAL SCALE 1:2000@ A1 / 1:4000@ A3
Page 28
eet
i
RR
iH
hi
7
oe
wat
WER
C.
A
PE
Le
ih : | a
Bin wash down area
f pe
is
I}
A
I
ast
2
S
N
\ 4
\ Uc
\ -
l “
\ “
axel roy -
i ~ -“_
i Nh ~— a TT
‘
10m from centre line of intermittent creek to
bullding face. Only cantilveringbalconies to
~ protude into 10m setback zone.
~
10m from centre line of intermittent creek to Duplex cabins over part an ~N
building face. Only cantilveringbalconies to 50m setback line from Edgar below ground carpark ~ ey
—~ — Bllmsatbadk, protude Into 10m setback zone. Bennett Building Line N
7~-h- eR — ee . Refer basement level for carpark layout. \ “N
pedieinnineiiondon! eee Dimension from centreline of intermittent creek to
— ~puilding face— ~~
10m from centre line of intermittentcreekto = no —
building face. Only cantliveringbalconies to ne —
protude into 10msetback zone, ER mem ew
a
Legend ° \ \
V4.
VW 10m zone fram centre line of Intermitent creek
i “7 "Development Area’ indicating major construction activity
zone as refered to by Condition 8 of NSC Decision Notice
L. _J dates 21st July 2005
ia "Development Area” indicating minor construction activity
zone for services infrastructure as refered to by Condition
A 8 of NSC Decision Notice dated 21st July 2005
|| Elevated timber decking and structure.
f Roads, parking and pathways constructed on solid ground
: (existing or fill) with cut as required. The only at grade pathwa
le} is the winding pathway from footbridge to mid pod
RRQ Proposed Retaining Wall
NOTES: a—
AMENDMENTS Arty a derensions on sit before tho t J M A GLIENT. HARDING JOB No. 978 DRAWING SITE 3
Rev: | DATE: | CESCRIPTION: ISSUED BY: COPYRIGHT chy nes oe ee eed f Ey ——_ Site Setbacks &
1 | mca0s | Response to NSC Raport (17.06.03) neue t oH TES vesions, puns wo dimensions Py AR CHITECT s 108 HARDING RESORT OATE. JULY 2005 ig
H 78.06.08 Response to NSC hheeting (27.06.05) oH SPECIFICATIONS AND COPYRIGHT ‘Comply ip the folowing or any other relevant codes: NSLAND PTY LT SCALE, 4:250@ At | ORAWNG x
THEREIN ARE THE PROPERTY OF -l Australi Ee
1_| z7a7es_ | cORNSCEWAL APP oH TWA ARCHITECTS QLD PTY LTD ae eee falco td tienes Lay asus genset Xwmnaceom |] LocaTion —_ATUNGA HEIGHTS Nez 978 pacts =
respons to Prelim approval (21.07.05) {8D MST NOT BE USED, CORED «Valu field empty covenants manual ore en 2e9 Seng ia 4008 ee NOOSAHEADS QLD =
4_|_2ato0s | FORNSC FINAL APP. ‘oH PART WITHOUT THE we TIEN ~ Apply ofl eppicable AUSTRALIAN STANDARDS whore a, Emel: |maQima-arch.com eatin DRAWN, ISSUE K =
Sediment Erosion Goria, Relves, Davelop Areas] PERMISSION OF THE COMPANY essa tard ar LA eee ee @ | | soe seissts swan 1 s771 || PROPERTY | LOT27 RP E9806 —_——- 9
| 620306 | GENERAL ARRANGEMENT REVISION oH JA ARCATIECTS. QUO Pry LTD ~-Aaaees and Mobilly Codes AS 1428.1 & 1428.2 - " oH || Mosuemnene: osne 7ia 140 [| CoSCRTION CHECKED «= JMA PRINT 2703/2006 a
Larger Scale Drawings Take Precedence fo smaer acale: DATE a
ao
Page 29
BASEMENT SiTE 1 Ll A i CSvVe Legend 410m zone from centre line of intermitent creek "Development Area" indicating major construction activity zone as refered to by Condition 8 of NSC Decision Notice dated 21st July 2005 "Development Area" indicating minor construction activity zone for services Infrastructure as refered to by Condition 8 of NSC Decision Notice dated 21st July 2005 Elevated timber decking and structure. Roads, parking and pathways constructed on solid ground (existing or fill) with cut as required. The only at grade pathwa’ is the winding pathway from footbridge to mid pod Proposed Retaining Wall Bin trailer Store Bir] wash down ai | AMENDMENTS EY OATE: | DESCRIPTION: 12.08.08 | REVISED TOWN PLAKMING: 280A.05 | RESPONSE TO NSC MEETING (77.05) 19.07.05 | RESPONSE TO NSC PRELIM APP. 30.0808 [FOR NSC FOCAL APP REV. E_| 2.0805 | REVISED TOWN PLANING FE 9 4 1 aie re l S| Comply tothe fotowing or ary other rekevand codes: SL alevend,indudeng ve (Larger Scale Drawings Take Precedence to smaller scale NOTES: ‘Vetly ol Eeensions on sita belore the commencement of any naw construction work, alterations or shop drawings ~ take meseured dmansions in preference ta any scaled mensions + Apply all epplicable AUSTRALIAN STANDARDS hora + Termite Bertier AS 3680.1 - Aavess and Motilty Codes AS 1428.1 8 1428.2 JIM A ARCHITECTS QUEENSLAND PTY LTD Lew 1457 Uppor Edward st, Kentynn Contra, Brisbane Quoenstend, 4000, Australia P.O, Box 380 Spring Hil 4004 OLD AUST MOBILE PHONE: 0448 744 110 (c) COPYRIGHT THESE DESIGNS, PLANS _ANO SPECIFICATIONS AND COPYRIGHT THEREIN ARE THE PROPERTY OF AMA ARCHITECTS OLO PTY LID ‘AND MIST NOT BE USED, COPIED OR REPRODUCED WHOLLY OR UN PART WITHOUT THE WRITTEN PERMISSION OF THE COMPANY JIMA ARCHITECTS QLO PTY LID 08 HARDING RESORT LOCATION ATUNGA HEIGHTS F cunt HARDING NOOSA HEADS QLD LOT 27 RP 89506 106 No, 978 DATE, JULY 2005 SCALE, 1:200@ A1 1 1:400@ A3 ORAWN, JMA Hexen IMA, OMMINSTRE SETOUT PLAN - BASEMEN SITE orawnans 978 DA0006 ISSUE K protoae 2/03/2006 DEVELOPMENT APPROVAL
Page 30
AMENDMENTS,
Oar: | DescRPTION:
2403.05 | REVISED TOWN PLANNING.
12.05.05 | REVISED TOWN PLANHING:
7000s | RESPONSE TO NSC MEETING (77:
19.67.05 | RESPONSE TO NSC PRELIM APP.
- |= |o |» |» |B
40.00.05 |FOR NSC FINAL APP
e 2/2 |2 Fe
resporee 0 Pratim epproval (21 07.05
| 2.1005 [FOR NSC FRRAL APP
9
_| 02.03.08 [GENERAL ARRANGEMENT REVISION GH
NOTES:
Verity al dimensions on sita before the commenooment
of ary rene construction work, atarattons or shop drawings +
take measured drmencions in preference to any acaled
dimensions.
‘Comply to the folowing or any other relevant codes:
~ Building Code of Austra
~ Local Authories Rugos and Guidelines
+ Loval suburb covenants manus
+ Agply ol applicable AUSTRALIAN STANDARDS whare
relevant, inducing:
= Acosss and Mobilty Codes AS 1428.1 4 14782
Larger Scale Orawings Take Precedence bo smalier scale
SEDIMENT EROSION CONTROL
se
kegend
40m zone from centre line of intermitent creek
i 7 "Development Area” Indicating major construction activity
zone ag refered to by Condition 8 of NSC Decision Notice
LL _] dated 21st July 2005
v "Development Area” Indicating minor construction activity
zone for services infrastructure as refered to by Condition
A 8 of NSC Decision Notice dated 21st July 2005
i Elevated timber decking and structure.
Roads, parking and pathways constructed on solid ground
; (existing or fill) with cut as required. The only at grade pathway
fl is the winding pathway from footbridge to mid pod
A¢ Proposed Retaining Wall
Straw Bales
Sediment Fence 1
ORR? CORONORORER
RRRRRRRRRER RR
SSN VAIS Se
Note:
Due to the small catchment areas, itis
not considered practical to construct sediment ponds.
Straw Bale walls will provide sufficent retardation and
filtration to remove silt loads.
Control devices apply to North and South Pods
O00 Straw Bale Sediment erosion control
wanes = Sediment fence
J M A
ARCHITECTS
QUEENSLAND PTY LTD
Lov 1 457 Upper Edward &, Keniynn Contra.
Brebene Quoonstend, 4000. Australia
P.O, Box 380 Spring Hil 4004 QLD AUST
Email: — [email protected]
ACN: 101 165.271 ABN: 48 101 166271
TEL:07 38393704 FAX: 07 38398112
MOBILEPHONE: 0418 714 110
THESE DESIGNS, PLANS _ANO SPECIFICATIONS
AND COPYRIGHT THEREIN ARE THE PROPERTY OF
ANO MAIST NOT BE USED, COPIED. OR REPRODUCED
WHOLLY OR IN PART WITHOUT THE WRITTEN
PERMISSION OF THE COMPANY
(c) COPYRIGHT
JMA ARCHITECTS QL.0 PTY LTD
JMA ARCHITECTS QLD PTY LTD
CuIENT
oe
LOCATION
PROPERTY. == LOT 27 RP 89506
DESCRIPTION
HARDING
HARDING RESORT
ATUNGA HEIGHTS:
NOOSA HEADS QLO
408 No,
OATE.
SCAE,
ORAWN,
978
JULY 2005
IMA ‘cHecKED SMA,
ISSUE
DrAWNGTITE SEDIMENT EROSION CON’
crams. 978 DAQO07
SITE
K
panos 2/03/2006
DEVELOPMENT APPROVAL
Page 31
AMENDMENTS
REV. | DATE:
5.1003
sau
2mes
1205.05
2.06.05
8
DESCRIPTION:
TOWN PLANNING ISSUE
FORMATION REQUEST
REVISED TOWN PLANNING
TOWN PLANNING
MEETING
Mad
msc.
mse
to Pretin oporowal (7.07
Eresiou Contos, Retcse,
NOTES:
\Vevity af dimensions on site betore the eommencament
cf any new constuction work, sfleratons oF shop dawings -
‘take memised dimensions in preferencs Io ery ceed
Gmensions
SCALE 171008 Al 7 172008 A3 eee eae gate ty ober revant code
+ Loca Authorities Rules and Guidelines,
+ Lowel suburb covenants memrat
Apply el oppicable AUSTRAUAM STANDARDS where
relevant, Inching.
Termite Barta AS 3660.1
+ Access and Moblily Codes AS 1428.1 & 1428.2
Larger Scale Drawings Take Precedence to ematiot scale
SECTION 1
J
ARCHITECTS,
QUEENSLAND PTY LTD
vee re
Lov 1 487 Upper Ecuard ot, Kentyrn Conte,
Brisbina Queersiond, 4000. Auabale
PO, Box 380 Spring Hh 4004 QLD AUST
Emeil; [email protected]
$01 165271 ABN: @ 101 165271
TEL D7 30002794 FAX: G7 38316112
MOBILEPHONE: = O418 714 110
©) COPYRIGHT
‘THESE DESIGNS, PLANS AND SPECIFICATIONS:
‘AND COPYRIGHT THEREIN ARE THE PROPERTY OF
MA ARCHITECTS QLO PTY LID
AND MUST NOT BE USED, COPIED OR REPRODUCED
WHOLLY OR WN PART WITHOUT THE WRITTEN
PERMISSION OF THE COMPANY
AMA ARCHITECTS QLO PTY LID
EAST ELEVATION
HARDING
. HARDING RESORT
ATUNGA HEIGHTS
NOOSA HEADS
QLo
HOT 27 RP 89506
978
JULY 2005
wth ee eee eee cee ee rer ee bee ll CULE EEE CSA Re = - - SCALE, 1:100@ A1/1:200@ A3
ORAVA, MA execxe SMA
seam ™TE LODGE - BASEMENT
GEN. ARRANGEMENT
oranncn, 978 DA1004
J
‘ssuE
pruroare 27/09/2005
DEVELOPMENT APPROVAL
BASEMENT FLOOR PLAN
SCALE 1:100@ At 1 1:200@ AS
Page 32
GROUND FLOOR PLAN
SCALE 1:100@A1 / 1:200@ A3
wn
AERIAL VIEW
AMENDMENTS
rev {owe | vescrnon: {SUED BY.
C_| sero. } Town PLaNNENG sue 16
0 _| s.0308 | wronmanion REQUEST pd
E_| 2.0h05 | REVISED TOWN PLANNING Pa
&_| 1205.05 | REVISED TOWn PLANNING. oH
G_| moncs | Response To WSC MEETING G7.06] GH
H_| 1207.05 | RESPONSE TONSC PRELIMAPP_|GH
i_| soonos fron nec rat are ou
ves porae to Prin spprewal (21.07.05)
J 2010.05 [son usc Airan ape oH
Isetiment Ereskm Cenivol, Rehise,
_Bevelopment Aer
NOTES:
‘Verity afl dimensions on te belors ne commencement
cf any new construction work, @Reretons cr shay dein -
tete mansured dimensions in praterenca to any scated
dimensions
Comply b the following or any other relovant cndes:
+ Buliing Code af Aunts
- Loca Authorijas Roses and Guidelines
~ Laval cubs covenenta manual
- Apply @ applicable AUSTRALIAN STANDARDS where
relevent inching.
+ Termite Baris AS $860.4
~Aceace end Mobtily Coda AS 102818 14207
Larger Scale Deewings Tats Precedence to emetir exile
JM A
ARCHITECTS
QUEENSLAND PTY LTO
Lev 1 457 Upper Edward si, Keniynn Conte.
P.O, Box 380 Spring HB 4004 OLD
-------------y
‘THESE DESIGNS, PLANS AND SPECIFICATIONS:
AND COPYRIGHT THEREIN ARE THE PROFERTY OF
8A ARCHITECTS OLD PTY LID
‘AND MUST MOT BE USED, COPIED OR REPROOUCED.
MA ARCHITECTS QLO PTY LID
ATTUNGA HEIGHTS ROAD
RESERVE
cent HARDING
08 HARDING RESORT
locanon —_ATUNGA HEIGHTS
NOOSA HEADS QLD
PROPERTY WOT 27 RP 89505
DESCRIPTION
408 No. 978
DATE. JULY 2005
SCALE. 1:100@ A1 11:200@A3
DRAWN, JNA cneckeo IMA
cues 3TE | ODGE - GROUND
GEN. ARRANGEMENT
monn 978 DAI002
$SSUE J
panos 27/09/2005
DEVELOPMENT APPROVAL
Page 33
FIRST FLOOR PLAN
SCALE 1:100@ A1/ 1:200@ AS
SECTION 3
SCALE 2:3006 Al
NORTH ELEVATION
AMENDMENTS
Rev joe: | pescrienost,
16.1009 | TOWN PLANNING ISSUE.
i0y04 | NFORMATION REQUEST
mam Tow
320805 | REVISED TOWN:
0805 To
RESPONSE 10 RSC APP.
Prefen apprewal (71.07
Ezoston Conbet, etuse,
NOTES:
‘Verity all dimensions on site before the commencement
Gieny now const uston otk, storatons or shop o ewings -
‘wks measizad dimensions in preteronce tb any acaied
Gmensions
‘Comply to Ow etiowing or amy other refevent codes:
+ Bultding Code of Aurea
Local Authorties Rutes and Guidetives
Level suburb covenents mervsl
Apply a eppicabls AUSTRALIAN STANDARDS where
relevent inducing.
‘Tile Barter AS 2680.4 :
oxss ond Moblity Codes AS 1428.1 8 1420.2
1 Scie Drawings The Precedence to erates svete
J MA
ARCHITECTS
QUEENSLAND PTY LTD
Lev 1 457 Uppes Edward af, KenAynn Conte.
‘Britbere Queersiend, 4000. Atxtala
0. Gen 290 Spring HR «006 OLD AUST
THESE DESIGNS, PLANS AND SPECIFICATIONS
AND COPYRIGHT THEREIN ARE THE PROPERTY OF
MA ARCHITECTS OLD PTY LD
AND MUST NOT BE USED, COPIED OR REPRODUCED -.
WHOLLY OF IN PART WITHOUT THE WRITTEN
PERMISSION OF THE COMPANY
MA ARCHITECTS QUD PTY LTD
oun HARDING
= HARDING RESORT
ATUNGA HEIGHTS
NOOSA HEADS ALD
107 27 RP 28506
978
JULY 2005
1:100@ A1 {1:200@ A3
JMA oxecxen JIMA
LODGE - FIRST
GEN. ARRANGEMENT
cunmcm, 978 DA1003
SUE J
pasrosre 27/08/2005
DEVELOPMENT APPROVAL
Page 34
CABIN TYPE C GROUND FLOOR 3 BEDROOM UNIT CABIN TYPE B ‘GROUND FLOOR END UNIT CABIN TYPE A GROUND FLOOR MIDDLE UNIT CABIN TYPE C FIRST FLOOR 3 BEDROOM UNIT CABIN TYPE B FIRST FLOOR END UNIT en | “Lje----.+-+- ee CABIN TYPE A FIRST FLOOR MIDDLE UNIT rth, CABIN TYPE C LOFT FLOOR 3 BEDROOM UNIT CABIN TYPE B LOFT FLOOR END UNIT CABIN TYPE A LOFT FLOOR MIDDLE UNIT TYPICAL SECTION AMENDNENTS, Rev | ose: | pescronow: ISSUED BY. ‘6.1009 | TOWN PLANNING ISSUE ie 2m204 | NFORMATION REQUEST pd 24.02.05 | REVISED TOWN PLANNING PL £20805 | REVISED TOWN PLANNING. oH 21.05 | RESPONSE TO NSC MEETING 07.06) GH 13.07.05 | RESPONSE TO NSC pnELanaP®, _1GH JOOS [FOR NSC ANAL APP. GH Jrespenss in Prelim eppreveal (21.07.05] = |x Ja l= [me jojo J | 29.10.05 Tron nese FINAL abe GH [Sediment Eroxlon Controt, Retome, 5 Tt NOTES: Verity 90 Gimersions on tite before fhe commencement of any new construction wor, atteratons, oF shop dawings + (ake meenzed doremsionsin preference 40 any cated dmentins Comey ts the fatioming ot any cthar relevant codes: + Bung Code of Aur aia + Loc Authorities Rites and Guidetines, - Loval cubed covennts manual <AAbply al epplcable AUSTRALIAN STAMDAROS where. relevent, inching: + Termite Bartlet AS 3650.1 = Accwas and Moblity Codes AS 14784 8 1428.2 Larger Scale Drawings Tote Precedence to emelby scale JM A ARCHITECTS QUEENSLAND PTY LTO Lov 1657 Upper Edward st. Kentynn Cente, Brisbone Queensland, 4000, Austaia THESE DESIGNS, PLANS —ANDSPECIFICATIONS ‘ANDO COPYRIGHT THEREIN ARE THE PROPERTY OF AMA ARCHITECTS GLO PTY 17 AND MST NOT BE USED, COPIED OR REPRODUCED WHOLLY OR IN PART WITHOUT THE VIROTTEN PERMISSION OF THE COMPANY JMIA ARCHITECTS OLO PTY LTD. quem HARDING 408 HARDING RESORT LocATION ATUNGA HEIGHTS NOOSA HEADS aL PROPERTY NOT 27 RP 89506 DESCRIPTION 408 Ne, 978 onre, JULY 2005 SCME, 4:100@ A111:200@ A3 DRAWN, uA ortcxen JMA ORAM TRE CABINS GEN, ARRANGEMENT ouvir. 978 DAT004 SssuE d pantoae 27/09/2005 DEVELOPMENT APPROVAL
Page 35
Queensland AB Government Hon Desley Boyle MP Member for Cairns MC06.1189 — TPA23569 Minister for Environment oo. Minister for Local Government No aie M06 and Planning Cr Bob Abbot Minister for Women Mayor Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 \ Dear Cr Abbot Notice of Decision of Development Application - Integrated Planning Act 1997 Pursuant to section 3.6.7 of the Integrated Planning Act 1997, | hereby give notice that the development application made by Attunga Heights Pty Ltd at 27 Attunga Heights Roads, Noosa Heads and called in by me on 1 December 2005, was approved in part and refused in part on 6 March 2006. A copy of the decision notice is attached. My re-assessment of the application confirmed amendments to the Material Change of Use development plans and conditions were required: to maintain environmental values of State interest including protection of a State wildlife corridor. These amendments also improve compliance with the requirements of the Noosa Shire transitional planning scheme. Given the integrity of the State wildlife corridor substantially depends on the retention of vegetation in the Edgar Bennett Avenue reserve along the western boundary of Lot 27 on RP89506, | intend to make representations to my Cabinet colleague, the Honourable Henry Palaszczuk MP, Minister for Natural Resources, Mines and Water, requesting he initiate road closure proceedings under the Land Act 1994 to ensure the reserve is retained for conservation purposes in a Park Reserve. 1 note Council also resolved on 21 July 2005 to commence steps to close Edgar Bennett Avenue along the frontage of Lot 27 on RP89506 and include the land ina Park Reserve. Given Lot 27 on RP89506 no longer requires access to Edgar Bennett Avenue and other surrounding development is not reliant on construction of the road reserve for access, | would appreciate your written support in achieving this outcome. This development proposal has stirred a high level of interest by the Noosa community and their genuine concerns are highlighted in the large number of postcards and other correspondence received by, the Department. Level 18 41 George Street Brisbane PO Box 15031 City East Queensland 4002 Australia Tetephone +61 7 3227 8819 Facsimlte +61 7 3221 9964 Email [email protected] Website www.qld.gov.au
Page 36
2 In making the decision to give partial approval to the development proposal | needed to be assured that the following concerns raised in letters and representations by Noosa residents and community representatives were adequately addressed. Breaches Council’s own town plan and ignores Council's own professional town planning advice. As a result of these concerns amendments to the proposed plans include the removal of 2 multiple dwelling pods from the upper western slopes of the site and relocation of 2 further pods in order to maintain a viable wildlife corridor through the site; reduction of the development footprint; reduction in possible disturbance of the site; reduction in the intrusion into the Open Space and Waterway Conservation designation and the requirement to maintain visual amenity. As an outcome the revised proposal is compatible with the achievement of the Development Principles, Strategic Aims and Locality Objectives in the Strategic Plan. Has excessive site population and excessive site coverage and undermines Noosa’s population cap. The modifications and amendments comply with the aim, objectives and relevant precinct intents of the DCP. The DCP states the implementation criteria are a means of offering some guide to Council, landowners and developers as to the level of development which may be achieved. The criteria may be varied, where compliance with the aim, objectives and intents is achieved. Further, the DCP acknowledges the sub-precinct boundaries are not precise and are subject to consideration of detailed site survey data, including vegetation and gradient analysis. It is also noted the new Noosa IPA scheme, which commenced on 3 February 2006 envisages an increased density over part of the developable area of the site from 60 to 160 persons per hectare. : It is agreed the proposal exceeds the maximum population density, site cover and building heights prescribed in the Noosa Shire transitional planning scheme. However, Council has thoroughly assessed the proposal against the detailed requirements of the planning schedule and imposed a number of conditions to ensure compliance at detailed design and works stage. In this regard Council has accepted the proposal is appropriate in its context. In terms of population caps, the proposed development will have no discernible impact or effect on Noosa’s population planning targets. Has excessive building bulk and excessive building height. While the proposal does exceed the maximum population density, site cover and building heights prescribed in the Noosa Shire transitional planning scheme the proposed development comprises detached buildings oriented to follow existing contours, which provides architectural variation and is broadly consistent with sub- tropical design principles and consistent with the built form development principles of the Strategic Plan and DCP. ' :
Page 37
3 The lodge also incorporates articulation and changes in roof levels to minimise the bulk of the building and create visual interest. The development is designed to fit on the land and is appropriate in context. The proposed development seeks to minimise modification of the landform by incorporating suspended buildings, which are oriented to follow existing contours, and suspending driveways and parking areas above the ground surface to accommodate changes in levels without the need for substantial cut and fill. Threatens a declared State Wildlife Corridor and Erodes a Conservation and Waterways Protection Zone This site contains significant environmental values including remnant vegetation; “Essential Habitat” for species protected under the Nature Conservation Act 1992; its function as part of a State wildlife corridor and a bioregional wildlife corridor connecting the habitat values of the Noosa National Park to the wetland habitats of the Noosa River. The development as amended is considered by the Environmental Protection Agency (EPA) to have less impact on the riparian vegetation and biodiversity values than would have occurred if the development occupied the footprint identified for development in the DCP. EPA is satisfied a viable wildlife corridor will be maintained through the site. Under these amendments a corridor of 50 metres is considered by the EPA as the best estimate to allow ecological functioning across the site from Noosa National Park to Noosa River and to Lake Weyba. To ensure that a corridor of 50 metres can be sustained the protection of vegetation in the Edgar Bennett Road reserve forms part of the recommendations of the development amendments. Representations to the Minister administering the Land Act to initiate road closure proceedings have also commenced. Therefore these proposed development modifications will reduce the extent of site impact and the footprint of the development and broadly complies with the relevant broad level strategies and aims of the Strategic Plan and DCP. Establishes a dangerous “Noosa Council can ignore its own town plan” precedent. With regard to councils making decisions in contravention of their planning schemes, particularly where sufficient grounds to approve the application do not exist, | have initiated a wider examination of the Integrated Planning Act 1997 (IPA) designed to give clear guidance about the role and importance of the planning scheme in decision making and improving accountability for planning decisions.
Page 38
Amendments being considered include: * Requiring decision notices to indicate reasons for the council's decision, an indication of whether the decision is a departure from the relevant provisions of the planning scheme, and the reasons for such a departure; e Requiring wider publication of the reasons for the council's decision, for example, on the council's website; and © Giving more explicit guidance about the circumstances which might warrant a departure from the planning scheme. : Vegetation Management Clearing of native vegetation on the site is also subject to the Vegetation Management Act 1999 (VMA) and is made assessable under schedule 8 part 1 table 4 of the IPA. This means that in order to lodge a development application to clear native vegetation, the applicant will still need to seek a determination from the Chief Executive of NRMW that the purpose is consistent with the requirements of the VMA. Given the high level of statutory protection afforded to the vegetation on the site, it can not be taken for granted that such an application would be approved by NRMW. If any further information is required, please contact Mr Brett Raguse of my office on telephone number 322 78819. Yours sincerely Desley Boyle MP Minister for Environment Minister for Local Government and Planning Minister for Women Att.
Page 39
DECISION NOTICE Ministerial Call-In Integrated Planning Act 1997 s3.6.7 DECISION DATE 6 March 2006 APPLICANT DETAILS Name: Attunga Heights Pty Ltd Postal address: cl Victor G Feros Town Planning Consultants 195 Dornoch Terrace HIGHGATE HILL QLD 4101 Phone no: 3844 2882 Fax no: 3846 1840 PROPERTY DESCRIPTION Street address: 27 Attunga Heights Road Suburb/locality Noosa Heads Real property Lot 27 RP 89506, Lot 112 SP 151410, County of March, Parish of description: Weyba APPLICATION TYPE Development Development Details Type of Approval sought Material Change of Multiple Dwelling (30 Dwelling Units) Development Permit ° Use and Accommodation Building (12 Accommodation Units) Reconfiguring a 1 lot into 2 Development Permit Lot REFERRAL AGENCIES Referral Agency Address Jurisdiction Environmental GPO Box 2771 Advice agency pursuant to Protection Agency BRISBANE QLD 4001 section 3.6.7(1)(d) of the Integrated Planning Act 1997 Contaminated Land
Page 40
DECISION DETAILS Development Decision Development permit or preliminary approval Material Change of Use for Approved subject to Development permit Multiple Dwelling (30 Dwelling conditions . Units) and Accommodation Building (12 Accommodation Units) Reconfiguring a Lot Refused - 1 lot into 2 Reasons for refusal of development application for development permit for reconfiguring a lot — 1. The proposed reconfiguration is contrary to the minimum tot areas envisaged by the Schedule to the Planning Scheme and the Strategic Plan and there are not sufficient grounds to justify approving the application despite the conflict with the Strategic Plan. 2. The proposed reconfiguration will bisect and fragment a State wildlife corridor and will adversely impact on the protection and management of the biodiversity and environmental values of the State wildlife corridor. This refusal is solely at the direction of the assessment manager. CONDITIONS The approval of the Development Permit for Material Change of Use is subject to conditions. The conditions of the Minister, as assessment manager, are attached. OTHER NECESSARY DEVELOPMENT PERMITS Listed below are other development permits that are necessary to allow the development to be carried out- Type of Development Subject of the required Development Permit Permit required Development Permit for Clearing native vegetation made assessable under Schedule 8 Operational Works Part 1 Table 4 Item 1A of IPA Development Permit for Landscaping, car parking and access, frontage works, Operational Works stormwater drainage, earthworks, water and sewer reticulation Development Permit for All Building Works Building Works
Page 41
SUBMISSIONS Thirty two (32) properly made submissions were received on the application. (n accordance with section 3.5.15(2)(i) of the IPA, the name and address of the principal submitter for each properly made submission is attached. RIGHTS OF APPEAL Under section 3.6.7(1)(e) of the Integrated Planning Act 1997 (IPA), this decision is taken to be the original assessment manager's decision, but may not be appealed. CURRENCY PERIOD The standard currency period stated in section 3.5.21(2) of IPA applies to development in this approval. Desley Boyle MP Minister for Environment Minister for Local Government and Planning Minister for Women
Page 42
-4- ASSESSMENT MANAGER'S CONDITIONS INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development, as may be amended by the conditions of this approval. The approved plans for this development approval are listed in the following table— Plan/Document | - -Plan / Document Name ° “ + | Date Number : _ : . : : 978 DAQO0O Issue K | Locality Plan Cover Sheet prepared by JMA 2/03/2006 Architects Queensland Pty Ltd 978 DA0001 Issue K | Site Plan prepared by JMA Architects Queensland 2/03/2006 Pty Ltd . 978 DA0002 Issue K | Site Setout Plan — Part A prepared by JMA Architects | 2/03/2006 Queensland Pty Ltd 978 DA0003 Issue K | Site Setout Plan — Part B prepared by JMA Architects | 2/03/2006 Queensland Pty Ltd 978 DA0004 Issue K_ | Site Setout Plan — Part C prepared by JMA Architects | 2/03/2006 Queensland Pty Ltd 978 DA0005 Issue K_ | Site Setbacks prepared by JMA Architects 2/03/2006 Queensland Pty Ltd 978 DAO006 Issue K | Site Setout Plan - Basement prepared by JMA 2/03/2006 Architects Queensland Pty Ltd 978 DAQO07 Issue K | Site Sediment Erosion Contol prepared by JMA 2/03/2006 Architects Queensland Pty Ltd 978 DA1001 Issue J. | General Arrangement Lodge — Basement prepared 27/09/2005 by JMA Architects Queensland Pty Ltd 978 DA1002 Issue J_| General Arrangement Lodge — Ground prepared by 27/09/2005 JMA Architects Queensland Pty Ltd 978 DA1003 Issue J. | General Arrangement Lodge ~ First prepared by JMA | 27/09/2005 Architects Queensland Pty Ltd 978 DA1004 Issue J General Arrangement Lodge — Cabins prepared by 27/09/2005 JMA Architects Queensland Pty Ltd 2. All development, including decked car parking areas, shall be setback a minimum of 10 metres from the centre line of the creek. This condition does not apply to the cantilevered balconies of dwelling units, unless the balconies would result in the clearing of remnant vegetation. This condition is subject to any development permit for operational works for clearing vegetation which is granted after the date of this approval’ , 3. The waste vehicle collection trailer shall not be stored/parked within the car parking spaces required for the Accommodation Building (Lodge). 1 Increased setbacks from the creek may be required for development which involves clearing remnant vegetation to which the Vegetation Management Act 1999 applies.
Page 43
10. 11. 12. 13. 14. 15. 16. -5- A vegetated wildlife corridor shall be maintained clear of all development through the site. All development shalt be setback a minimum of 30 metres from the western boundary of the site, with the exception of proposed mid cabin pods 7C, 8C, 1A, 2A, 3A and 2B, which shail be setback a minimum of 24 metres from the western boundary of the site and the lift and footpath to the west of pods 8C, 1A, 2A, 3A, which shall be setback a minimum of 20 metres from the western boundary of the site. The wildlife corridor, the buffer to the creek and land outside of the ‘Development Areas’ pursuant to condition no. 7, must be made the subject of an environmental covenant by the registration of an instrument of covenant under section 97A of the Land Title Act 1994. The Noosa Shire Council will be the covenantee. The environmental covenant shall cater for the requirements of the conditions of approval including protecting the site's flora and fauna. The development's external finishes, including roofing materials, shall be in natural hues so as to blend in with the site’s vegetation with zinc alumina not permitted. The development shall be constructed in a manner that minimises site impacts, including a predominant building form of raised elevated structures, minimal earthworks and site works limited to not extend past the proposed retaining walls in accordance with the development plans referred to in condition no. 1. Land disturbance including clearing of vegetation and other works must not extend more than 1.5 metres beyond the footprint of the built structures. Vehicular access for works associated with construction of the multipte dwellings shall be from Alma Way utilising the approved driveways for the development The open space and setback areas between the Accommodation Building (Lodge) and Attunga Heights Road are to be landscaped in accordance with Council's Planning Scheme Policy PSP1 - Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter. Any fence to the Attunga Heights Road frontage shall be setback at least 1 metre from the front property boundary, with at least half of the fencing setback 2 metres. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing from the street. All fencing (other than the fence to the Attunga Heights Road frontage) shall be fauna friendly. A verification survey of all buildings is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the maximum building height above natural surface and finished surface level, as indicated on the approved plans and calculated in accordance with the provisions of the Noosa Shire Council transitional planning scheme. Existing trees on the site and within road reserves are to be retained, except where required to be removed within the approved development envelope. These landscape plans for the area between the Lodge and Attunga Heights Road required to be prepared under condition 8 are to denote areas of existing vegetation or existing trees proposed or required to be retained. The 3 mature Hoop Pines in the vicinity of the Lodge Development shall be protected. Any advertising sign or device is to comply with Council's Local Law No. 16 - Control of Advertising. Alt hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems (LPG or natural). Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures. All kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per minute. Dishwashers and washing machines are excluded from this requirement.
Page 44
17, 18. 19. -6- To secure performance of all conditions of this approval, security in the form of a cash bond or trading bank guarantee to the sum of $250,000 for the Multiple Dwelling and $50,000 for the Accommodation Building (Lodge) must be submitted to Council, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. The applicant must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. Amenity - General 20. There shall be no substantial detrimental effect upon the amenity of the neighbourhood, including the Viridian Development, by reason of the creation of excessive noise, lighting nuisance or other emissions by or from the Development, including that caused by cars accessing either along Alma Way or manoeuvring within the development. Noise 21. a) Swimming pools (if any) are to be used only between 7:00am and 9:00 pm daily. b)} Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner that prevents a noise nuisance beyond the site in accordance with the environmental nuisance provisions of the Environmental Protection Regulation 1998. c) The applicant must ensure that no builder or building contractor carries out building work on a building site in a way that makes or causes audible noise to be made from the building work on:- i) Monday to Saturday, before 7:00am or after 6:30pm; and ii) Sunday or public holiday, at any time. Lighting 22. a) The level of illumination, at a distance of 1.5 metres outside the boundary of the Site, resulting from direct, reflected or other incidental light emanating from the Site shall not exceed eight lux measured at any level upwards from ground level. b) Lighting is to be directed downwards so as to minimise any adverse effects of glare or direct light nuisance on all adjacent allotments (including Lot 106 on SP 151408- the Viridian development), but must achieve a minimum level of illumination consistent with the safety of pedestrians and vehicles. c) Lighting to any walkways, where required, is to be low level bollard type lighting, down lighting or foot lights that achieve the minimum of illumination and light spillage consistent with safety for pedestrians and vehicles. Buildings and Other Structures 23. a) The colours of the buildings shall be muted tones of browns, greens, ochres, blues and greys selected from a suitable colour palette. b) The project is not to be staged (other than the Lodge component in Attunga Heights). ¢c) Air conditioning units for the dwellings/cabins shall be located so as to not face the Viridian development where the dwellings / cabins are located east of the creek and adjacent to the eastern shared boundary with the Viridian development. d) Any spoil from construction activities to be removed from the site shall be by means other than through Lot 106 on SP 151408 (except that such removal shall be allowed whilst construction activity is under way on Lot 106 - the Viridian development). e) The applicant shall construct at its cost pedestrian access connections to the public pathway to be constructed on Lot 106 adjacent to Alma Way. An easement for this purpose to be agreed with the owners of Lot 106 and duly executed. ,
Page 45
-7- f) Rubbish storage areas constructed adjacent to Alma Way shall be suitably screened and there shall be an obligation to immediately return bins from their collection point after emptying. The collection area shall be maintained in a clean and tidy state. g) There shall be no roof top terraces to any of the 30 dwellings. Revegetation / Landscape / Fauna Considerations 24. a) The area adjacent to Lot 106 shall be densely landscaped in accordance with Council's Planning Scheme Policy PSP1 - Landscaping Guidelines in order to provide additional screening of Alma Way with such plantings to be initially of advanced stock including at a minimum 20 x 45 litre native trees adjacent the dwelling units and car parking areas. b) In conjunction with the developer / owner of Lot 106 on SP 151408 — the Viridian site, the applicant will on completion of its works remove the dividing fence between Lots 106 and 27 so as to allow free movement of fauna except in location where retention of the fence is necessary for reasons of public safety. Management Plans 25. The Applicant shail prepare various management plans that relate to the design, construction and operational phases of the development. These plans are to be prepared by appropriately qualified persons and submitted to Council prior to issue of a Development Permit for Operational Works. The plans are to address specific matters detailed in the conditions of this approval. The plans to be submitted are: 25.1. Environmental Management Plan; 25.2. Ecological Restoration Plan and Specifications; 25.3. Vegetation Management Plan; 25.4. Weed Management Plan; 25,5. Fauna Management Plan; 25.6. Fire Management Plan; 25.7. Construction Management Plan (including Traffic Management Plan); 25.8. Stormwater and Water Quality Management Plan; and 25.9. Acid Sulphate Soils Management Plan. Fees Payable 26. 27. The Applicant shall pay Council all reasonable costs for the assessment of the management plans and also the costs associated with ensuring the development complies with the requirements of this approval. These costs shall be limited to a maximum of $30,000 including the cost of external consultants should they be required. The further approvals required to allow development to occur shall be subject to the fees contained in Council's Fees and Charges Schedule. Environmental Management Plan 28. 29. An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that the impact of the development on the environment is minimised and that the environmental values of the site are protected and enhanced. The EMP is to: 28.1. Comply with AS14000. 28.2. Demonstrate a high level of environmental care and responsibility and be consistent with best practice for developments of this type in similar environments. 28.3. Detail the applicant's environmental policy and the proposed environmental management system for the site. The Environmental Management Plan shall specify to the reasonable satisfaction of Council: 29.1, the performance targets, including those derived from the conditions and other requirements arising from legislation and other approvals;
Page 46
30. 31. 32. 33. -8- 29.2. how the performance targets are to be achieved; 29.3. when the performance targets will be satisfied; 29.4. how performance will be monitored; 29.5. corrective actions and contingency measures to be undertaken; 29.6. reporting arrangements (including monthly reports to Council during construction); 29.7. auditing arrangements; 29.8. how the requirements are to be incorporated into construction and works contracts; 29.9. how the developers employees, contractors and the contractor's employees will be informed and trained with respect to the environmental protection requirements; and 29.10.enforcement. The Environmental Management Plan shall apply to all works and activities on all areas of the site and adjacent road reserves. In particular, but without limitation, the Environmental Management Plan shall address the following issues in relation to the construction and operational phases of the development: 31.1. legislative compliance; 31.2. vegetation protection; 31.3. fauna and fauna habitat protection; 31.4. weed control; 31.5. pest control; 31.6. soil erosion and sediment control; 31.7. water quality protection; 31.8. groundwater protection; 31.9. air quality protection; / 31,10.storage and handling of hazardous substances; 31.11.noise and vibration management; 31.12.waste management; 31,13. cultural heritage management; 31.14. visual amenity protection; 31.15. bushfire control; 31.16. environmental emergencies; and 31.17.community liaison. The Environmental Management Plan shall incorporate the requirement for monthly environmental compliance monitoring and audit reports to be submitted to Council for the construction stages of the development. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following: 32.1. Include tables of the monitoring results (digital form should be in Excel). 32.2. Include individual charts plotting the results for alt parameters required in the monitoring. 32.3. Include a brief written discussion of the results and recommend any necessary actions. The Applicant and all future owners of the site shall comply with the relevant components of the Environmental Management Plan. This requirement will be included in the Community Management Statement for the units and the Lodge. Ecological Restoration Plan and Specifications 34. Prior to preparation of an Ecological Restoration Plan a quantitative survey shall be undertaken to identify the vegetative dynamics of the site.
Page 47
35.
36.
-9-
An Ecological Restoration Plan and Specifications shall be prepared for the site by a specialist
restoration ecologist and submitted to Council prior to issue of a Development Permit for
Operational Works. The applicant shall implement the Plan and Specifications. !t shall apply to
all areas covered by the Environmental Covenant as per Condition 5 and plantings surrounding
the buildings shall be included as Ecological restoration works and not landscaping works
{except around the Lodge where landscaping may be undertaken). It shall specify actions and
works necessary to result in robust, self-sustaining viable plant communities and habitat. The
following shail be addressed and included in the Plan and Specifications:
35.1. Document the current status of the areas requiring ecological restoration in terms of
structure, floristics, missing elements, health, vigour, etc.
35.2. Formulate structural and floristic models for the plant communities requiring ecological
restoration.
35.3. Specify the required works and actions for each area in terms of:
35.3.1. site preparation (this may include thinning, weed removal and control, etc.),
35.3.2, establishment of the missing floristic and structural elements,
35.3.3. habitat creation and reinforcement for native fauna and reinforcement of habitat
linkages and corridors,
35.3.4. creating opportunities for regeneration from the seed bed, natural recruitment
and the establishment of wildlings,
35.3.5. planting and mulching procedures,
35.3.6. fertilizing procedures noting the low nutrient status of these ecosystems,
35.3.7. watering procedures,
35.3.8. protection from wildfire, particularly during the establishment phase,
35.3.9. erosion and sediment control,
35.3.10. on-going maintenance,
35.3.11. environmental safeguards, and
35.3.12. incorporation of the relevant requirements of all the management plans required
by this approval, particularly the Fauna Management Plan, Fire Management
Plan and the Environmental Management Plan.
35.4. The Ecological Restoration Plan and Specifications shall include all parts of the site
where vegetation will be retained on the site.
35.5. The Ecological Restoration Pian will exclude the areas fronting the Lodge and Attunga
Heights Road as these areas will be landscaped in accordance with Council's Planning
Scheme Policy PSP1 - Landscaping Guidelines.
All the relevant ecological restoration works and actions shall be undertaken by the applicant
and completed prior to commencement of the use.
Fauna Management Plan
37,
38.
A Fauna Management Plan (FMP) shall be prepared and implemented prior to commencement
of any works on the site. The FMP shall be submitted to Council for approval prior to issue of a
Development Permit for Operational Works.
The Fauna Management Plan shall specify the numbers and types of forage and habitat trees
(particularly for Koalas and Glossy Black Cockatoos) to be planted in the vegetation areas
. Outside the ‘Development Area’. Particular attention shall be paid to the following areas:
38.1. The State Wildlife Corridor and the use of the area as a corridor for koalas.
38.2. Planting of Allocasuarina littoralis (for Glossy Black Cockatoos) and also appropriate
hollow developing trees throughout all areas of retained vegetation and areas to be
rehabilitated. .
38.3. Protection and maintenance of the Burrowing Skink (Ophioscincus truncates) habitat.
This information shall be included in the Ecological Restoration Specifications.
Page 48
39. 40. 41, 42. 43. -10- Nesting boxes of a range of sizes shall be installed in nominated trees. The number, type, size, location and purpose of the nesting boxes is to be specified in the Fauna Management Plan. The manner in which these nesting boxes are to be maintained shall also be specified. The Fauna Management Plan shall specify actions that shall be undertaken to protect and maintain the Burrowing Skink (Ophioscincus truncates) population and its habitat. Maintenance and protection of a closed-canopy rainforest community with wet understorey, damp leaf litter, loose soils and hollow logs must be addressed in the Fauna Management Plan. Consideration shall be given to the facilitation of fauna movementilinkages within and across the site when designing buildings and roads and placement of fences. No domestic pets shall be permitted on the site during construction. Residents and guests shall not be permitted to keep cats or dogs on the site. The owner shall prepare an environmental guideline for residents that explains the intent of the State Wildlife Corridor and how it shall be maintained and protected and this guideline shall be included in the Community Management Statement for all bodies corporate having control of any part of the site. Fire Management Plan 45, 46. 47. 48. 49, 50, 51. A Fire Management Plan shall be prepared for the site and submitted to Council for approval prior to issue of a Development Permit for Operational Works. The Fire Management Pian shall address: 45.1, Fire management and protection within the development. 45.2, Bushfire management and control in all the areas of Vegetation. 45.3. Provision of some firebreaks and fire hydrants, if required. 45.4. The need to retain, maintain and protect habitat for the Burrowing Skink (Ophioscincus truncates), which is wet understorey, thick damp leaf litter, toose soil and logs. The use of control burns will not be appropriate on this site. The Fire Management Plan for the developed areas shall address the following: 46.1, setback zones from retained native vegetation; 46.2. access between structures and vegetated areas, 46.3. proposed building construction methods, materials and designs to reduce fire risks; 46.4. gutter treatments to avoid the collection of leaves and other fire-prone material; 46.5. location of fire hydrants and water points; 46.6. access for fire fighters and emergency workers, 46.7. fire suppression and evacuation procedures; 46.8. ecological restoration measures to reduce fire risk; 46.9. owners and operators training and responsibilities; and 46.10.implementation procedures. The Fire Management Plan shall demonstrate a high level of environmental care and responsibility and be consistent with best practice for developments of this type in similar environments. The Fire Management Plan shall meet the provisions of the Queensiand Fire and Rescue Service Act 1990 and shall be endorsed by the Queensland Fire & Rescue Service. The Fire Management Plan is to be implemented by the applicant and future owners of the site. The development shall comply with the fire management plan, which shall be included in the Community Management Statement for the bodies corporate. The Developer shall provide a bushfire information kit to purchasers of the multiple dwellings on the site. The bushfire information kit shall be submitted to Council for approval as part of the Fire Management Pian.
Page 49
52. -li- The Fire Management Plan shall incorporate ail the relevant requirements of, and be consistent with, all the other management plans required by this approval. Sediment and Erosion Control Plan seqanenaog eee 53. 54. 55. Detailed staged Sediment and Erosion Control Plans shall be prepared for the site and imptemented by the applicant. The Plans shall be in accordance with the institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June 1996) and in particular using Checklist No. 3 from that document. The Sediment and Erosion Control Plans shall cover all development on site (during the construction, establishment and operational phases), ecological restoration and remediation works. All recommendations of the Plans shall be implemented. The Sediment and Erosion Control Plans shall also ensure the protection of the areas of retained and enhanced vegetation and shall: 54.1. identify existing erosion problems, and 54.2. specify appropriate remedial actions. All necessary erosion and sediment control devices shall be incorporated within the development precincts. The applicant must ensure that any person acting on this permit shall prevent erosion and sediment export from teaving the site or entering the creek. Site contro! measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operationa! Works. Stormwater and Water Quality Management Plan 56. 57. 58. 59. A Stormwater and Water Quality Management Plan for the site shall be prepared and implemented by the applicant prior to the issue of a Development Permit for Operational Works. The Stormwater and Water Quality Management Plan shall take into account matters specified in section 19(4) of the Environmental Protection (Water) Policy 1997. Key water quality objectives to be reflected in the Stormwater and Water Quality Management Plan are for the protection of aquatic ecosystems in the waterways of the site, areas adjoining the site, and the receiving waters of Noosa Inlet and the Noosa River. The low nutrient environment of the site and areas adjoining the site are the key factors in determining appropriate performance targets. Specifically, water quality objectives shall include the following performance targets, subject to the constraints of the catchments external to the site: 58.1. Total nitrogen levels — 0.34 mg/l 58.2. Total phosphorous levels — 0.035 mg/l The Stormwater and Water Quality Management Plan shall comply with and address the following issues in relation to the construction, establishment and operation phases of the development: 59.1. Identify all necessary stormwater treatment and water quality devices associated with the development, which shal! be located within the approved boundaries of the development areas. 59.2. During the construction phase, monthly water quality monitoring and monitoring after significant rainfall events (at least two per year) shall be undertaken for: 59.2.1, suspended solids and turbidity, 59.2.2. temperature, 59.2.3. salinity, 59.2.4. total nitrogen, 59.2.5. total phosphorous, 59.2.6. pH, 59.2.7. trash and gross pollutants, and
Page 50
60. -12- 59.2.8. dissolved oxygen. 59.3. During the establishment and operation phases, water quality monitoring shall be undertaken every third month and monitoring after significant rainfall events (at least two per year) shall be undertaken for. 59.3.1. total nitrogen, 59.3.2. total phosphorous, §9.3.3. suspended solids and turbidity, 59.3.4. pH, 59.3.5. salinity, 59.3.6. temperature, 59.3.7. dissolved oxygen, 59.3.8. trash and gross pollutants, and 59.3.9. faecal coliforms. 59.4. The applicant shall continue this water quality monitoring for a period of 3 years from completion of the final stage of construction. In addition, the applicant shall undertake inspections for erosion and deposition, the build- up of trash and gross pollutants, and other water pollution. These inspections will be carried out every third month as well as after significant rainfall events, for a period of 3 years from completion of the final stage of construction. 59.5. An operational phase Water Quality Management Plan shall be prepared to the reasonable satisfaction of Council and address water quality performance targets, water treatment devices, water quality maintenance, requirements for stormwater management measures and devices. The plan shall demonstrate compliance with the prescribed water quality objectives. 59.6. Responsibilities under the Stormwater and Water Quality Management Plan shail be clearly delineated. 59.7. Non-compliance with prescribed water quality standards will trigger the implementation of measures to rectify the problem(s). Reports on monitoring, incidents, corrective action and plan updates shall be submitted to Council every month during construction with Councit being notified if any incident is recorded. These reports shail include information collected during the monthly monitoring program, shall highlight any non-standard results, and be submitted in a form acceptable to Council. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following: 60.1. including tables of the monitoring results (digital form should be in Excel); 60.2. include individual charts plotting the results for all parameters required in the monitoring (digital form should be in Excel); and 60.3. include a brief written discussion of the results and recommend any necessary actions. After completion of the construction stage of the development, these reports shall continue every three (3) months for a period of two (2) years. Water Quality Devices 61. Water quality control devices shall be installed generally in accordance with the Stormwater and Water Quality Management Plan. Detailed staging plans and specifications, based on and generally in accordance with the Plan shall be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational! works.
Page 51
-13- Drainage Works 62. The applicant shall complete the drainage works progressively in conjunction with development of the site and generally in accordance with the approved Stormwater and Water Quality Management Plan. Detailed drainage plans and specifications, based on and generally in accordance with the approved Drainage Plan, the EMP and these Conditions, shall be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. 63. All drainage works as required by the Drainage Plan shall be provided by the applicant at their own cost. Roadworks Contributions 64. A roadworks contribution of $19,045 towards the upgrading of the local traffic area of Noosa Hill shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the date of payment. The money will be used to assist Council with the cost of intersection improvements at Viewland Drive/ Noosa Drive and the addition of traffic calming devices along Nairana Rest and the Quarter Deck. Vehicte Access 65. Vehicular access driveways from Alma Way to serve the units shall be a minimum width of 5.5 metres. 66. Plans and cross-sections of the proposed driveways shall be submitted prior to approval of a development application for Operational Works. These drawings will demonstrate that the driveways are designed to Council's design standards and AS2890.1 at grades that prevent -vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any level difference. . Vehicle Access Easement 67. Avehicie access easement shall be created over Alma way to service the units. In this regard, plans submitted for Operational Works approval shall accurately show the location of the easement. A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. : Carparking Off Street 68. The carparking area shall be designed to comply with the provisions of AS 2890. 1-2004 for user” class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. The design shall consider the requirements of Conditions 2 and 3. 69. A minimum of 39 carpark spaces and 3 additional motorbike/bicycle parking spaces for the Multiple Dwellings, and 10 carpark spaces in tandem shall be provided for the Lodge with 2 bicycle spaces. 70. Car parking arrangements at the Accommodation Building (Lodge) may be in tandem. All other spaces shall comply with the requirements of AS2890.1-2004. Traffic Management for Morwong Drive and Viewland Drive (30 Dwelling Units) 71. a) Access is to be via Viewland Drive from 7:00 am to 7:30 pm and from Morwong Drive from 7:00 pm to 7:30 am. b) Owners and guests are to be informed of the site access arrangements. c) Local taxi companies are to be informed of the access arrangements on site. d) In conjunction with the developer / owner of Lot 106 on SP 151406 (the Viridian Site), the Developer is to provide sufficient information at the Morwong Drive entrance and at the Viewland Drive entrance to Alma Way to enable a person seeking vehicular access to the multiple dwellings to locate the alternative access if the access initially chosen by the person is closed.
Page 52
-14- e) Vehicles of Owners and Visitors must not be driven on Alma Way South after 7:00pm or parked on Alma Way at any time. f} Garbage removal vehicles are to be limited to standard garbage trucks. g) Service garbage and delivery vehicles may operate only between the hours of 8.00am and 5.00pm Monday to Saturday. Vegetation Protection 72. 73. 74, 75. 76. 77. 78. 79. 80. Vehicular pavements within the drip zone of any of the existing trees on site to be retained shall be designed as a pervious pavement (such as grass paving cells or similar), as this will allow water that falls on this surface to penetrate to the trees root system. The pavement shall be constructed so as not to damage the tree or their root system and in this regard temporary fencing shall be provided around the trees during construction to help protect them. Plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious pavement and the temporary fencing prior to obtaining a Development Permit for Operational Works. Vegetation removal, tree felling and lopping shall be undertaken in an environmentally sensitive manner to avoid damaging surrounding vegetation, trees and habitat. Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos, possums) by a qualified wildlife spotter. If wildlife species are present, the tree shall not be felled or lopped until the wildlife has left the tree. All cleared vegetation shall be suitably processed or Tfemoved from the site by a method approved by Council. Environmental weed species cleared from the site shall not be mulched. Vegetation material from environmental weed species shali be removed from the site and disposed of in a Council approved refuse tip. . Burning off is not considered an acceptable means of disposal and is not to take place. During construction, the boundaries of areas of retained and protected vegetation of and adjoining the site shall be clearly marked for the purpose of preventing access into these areas thereby protecting the vegetation and habitat values. All underground services, drainage, footpaths, bikepaths, roads and other works shail be located to minimize adverse impacts on retained vegetation, particularly their root system. Weed and Pest Species Control 81. 82. 83. 85. 86. All plants listed as environmental weeds by the Queensland Herbarium or listed as Undesirable Plant Species by Noosa Council shall be removed and/or treated prior to commencement of the use. Prior to entering the site or Lot 106 on SP 151406 (the Viridian Site), all construction machinery and vehicles shall be washed down to remove soil that may contain weed seeds, soil pathogens and pest species. All nursery stock shall be weed, pest and disease free and certified as such by the supplier. The certificates are to be obtained prior to the commencement of any landscaping works on site and shall be made available to Council upon request. All mulch produced on site by mulching cleared vegetation and trees shall specifically exclude material (particularly seeds) from environmental weed species (eg. fantana, asparagus and umbrella trees). Soil disturbance shall be kept to a minimum to avoid weed proliferation. The eradication and’ control of environmental weeds will be an integral part of both the Ecological Restoration Plan. Vegetation used in restoration work shall exclude environmental weed species.
Page 53
-15- Park Contributions 87. A Park contribution of $81,120 towards the acquisition of additional parkland or the improvement of existing parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit for Operational Works in accordance with Council's Planning Scheme Policy PSP24 Park Requirements. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2008 until the date of payment. Frontage Works 88. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Attunga Heights Road frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds. 89. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council's Standard specifications prior to commencement of the use permitted by this permit. Pathway Contributions 90. An estimated pathway contribution of $18,234.00. towards external major pathways, in accordance with Planning Scheme Policy PSP41, shall be paid to the Council prior to obtaining a Development Permit for Operational Works. The amount shall be calculated in accordance with the policy current at the time of payment and will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the date of payment. Stormwater Drainage 91, All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged to the existing waterway traversing the site. The stormwater shall be discharged so as not to cause any scour or damage to the waterway. 92. Roof runoff shall be directed to an approved rainwater storage system or tank (minimum storage 2000 litres per dwelling and 8500 litres for the Lodge). 93. To ensure that polluted run-off does not enter Council's stormwater drainage system, stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in a gross pollutant trap provided on site prior to being permitted to discharge into Council's drainage system. All other clean stormwater, such as roof water, shall be collected on site and discharged through a single underground drain line directly into the existing drainage system, bypassing the gross pollutant trap. . To this end, a detailed maintenance plan shall be prepared for the proposed gross pollutant trap, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. The approved maintenance plan shall be incorporated in the Community Management Scheme for the development and a copy of this shall be provided for Council's records prior to commencement of the approved Use. A Development Permit for Building Works shail not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. 94. All site stormwater drainage shall be by means of a gravity system. Water & Sewer Infrastructure 95. The applicant shall provide written evidence of approval to construct both the sewer connections and water connections, through the adjacent Viridian Noosa Site, that are required to service the proposed development. . 96. The applicant shall demonstrate that the advance construction of conduits in the adjacent Viridian Noosa Site to facilitate connection of water and sewer to the proposed development has been completed and correspond with the drawings to be submitted for operational works. 97. The applicant's approved contractors shall construct all water supply and sewer lines in the adjacent Viridian Noosa Site with due care and reinstate any and ail areas disturbed to the satisfaction of Council and Viridian Noosa.
Page 54
98. 99. 100. 101. 102. -16- Council will permit only one (1) metered water connection to be provided from the existing 150mm Council water main, along Alma Way in the Viridian Noosa Site, to service the development. A separate metered connection from the Council main in Attunga Heights will be permitted to service the separate allotment accessed from Attunga Heights. The points of sewer discharge from the site into the existing Council system in Alma Way shall be to the standards and requirements of Council’s Planning Scheme Policy PSP6 - Engineering Design Standards Water & Sewerage. The points of discharge shall be a minimum of 20 metres from the nearest house connection branch. Any internal sewerage pump station shall be constructed to the standards and requirements of Council's Planning Scheme Policy PSP6 - Engineering Design Standards Water & Sewerage and shall include magnesium hydroxide dosing to minimise odour from rising main discharge. Any modifications to existing sewers required to accommodate pump flows including but not limited to poly-lined manholes, gas check manholes and boundary traps shall be constructed at the applicant's expense. Concept master plans to be submitted indicating the location of the proposed sewerage pump station(s), sewer main and water supply infrastructure for preliminary approval prior to lodgement of plans for Operational Works. These plans are to include but not be limited to — location of sewerage pump stations, rising mains, gravity sewers and water mains. Plans are also to indicate the area to be disturbed by construction, method of crossing creek and methods to be utilised to stabilise slopes and batters. Sewer Mains 103. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council's standards and requirements at no cost to Council. Town Water Supply 104, 105. The site shall be connected to Council's existing town water supply and be constructed in accordance with Council's standards and requirements at no cost to Council. Fire hydrants are to be provided throughout the development in accordance with Council Engineering Design Standards and in accordance with Queensland Fire Service Standards. Service Easements 106. A registered easement shall be created over the zone of influence of all sewers within the subject site and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0m wide. In this regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary width of the easement, which shall be shown on any plans submitted for Operational Works / Building Works approval. To this extent the surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to be created. In addition to this the Applicant's Solicitor shall give Council's Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. . A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Any changes required by Council’s Solicitor must be corrected immediately. Headworks Contributions 107. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates under the current policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from March 2005 unti! the date of payment.
Page 55
-17- Water Supply $150,085 Sewerage $113,401 TOTAL $263,486 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Shouid the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. Earthworks 108. 109, 110. All earthworks carried out on site for construction activities shall be undertaken in accordance with the “Geotechnical Investigation: Proposed Housing Development ~ 26 Attunga Heights, Noosa Heads, Queensland” dated November 2003 and the further report dated 7 July 2004. The applicant shall ensure the building designs and the type of foundation system(s) are certified by a Geotechnical Engineer or similar qualified expert. This information shall be submitted to the Council prior to obtaining a Development Permit for Operational Works. In the sand dune area, unsupported temporary excavations are not to exceed 1.0 metres in height and are to be formed no steeper that 30 degrees. General 411, 112. 413. Prior to undertaking any excavation, the applicant must ensure that any the person acting on this permit shall contact public utility service providers to ascertain the location of their underground services. The applicant must ensure that any person acting on this permit applies for and obtains all other necessary permits including crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals required under any other Act or local law. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath, kerb and gutter, or other Council property damaged as a result of construction of the proposed development. The applicant must ensure that if any person acting under this permit damages any Council property or facilities (such as underground drainage, water supply and sewerage), through any cause whatsoever in the course of, directly or indirectly carrying out development, that person notifies the Manager - Land Devetopment of the Council and rectifies the damage at its cost and to the satisfaction of the Manager - Land Development of the Council. Alternatively, the Applicant may request the Council to carry out the rectification works, at the applicant's cost Any damage to a water main shall be rectified by Council, at the applicant's cost. Any damage to a sewer main shall be undertaken by either Council or a Council approved contractor, at the applicant's cost. In all cases, Council reserves the right to carry out rectification works in an emergency and where no reasonable attempt has been made to complete the rectification works as part of the development. All costs incurred by Council in any rectification works shalt be repaid to Council prior to the endorsement of the Plan of Survey. Building 114, The Geotechnical report submitted-as part of the application has been appraised and approved subject to the following conditions:- 114.1. There is to be no uncontrolled discharge of water onto the slope; 114.2.Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it should be reinstated immediately after construction is completed;
Page 56
-18- 114.3. Additional load due to fill, construction equipment or stockpiled materials should not be located on the dune slope; 114.4. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating, earthmoving or demolition machinery or other similar construction techniques; 114.5. The construction management plan is to be adhered to; 114.6.Copies of all inspection reports by engineers are to be submitted to Council within 5 business days of the inspection taking place; 114.7.Boundary wall movement shall be monitored throughout construction by a Registered Professional Engineer of Queensland (RPEQ) and if movement occurs construction is to be stopped immediately and appropriate action is to be taken to arrest the movement. Further work shall only take place after a re-assessment of the conditions on site; 114.8.A RPEQ is to be engaged by the client to oversee the piling works and copies of all inspection reports are to be submitted to Council within 5 business days of the inspection taking place; 114.9. The applicant's Geotechnical engineer will be required to be on site for the whole of the time during any excavation. The construction of the whole of the foundations is to be supervised and directed on site by a consulting Geotechnical engineer. No work of any such kind relating to the foundations shall be carried out if a geotechnical engineer is not on the site and supervising and directing this work. Such works shall only be carried out during dry weather conditions and if there is a risk of sand movement occurring, all work shall be suspended until such steps, approved by the applicant's Geotechnical engineer and the Council's Building Surveyor, have been taken to ensure that no further slippage will result. Environmental Health 115. 116. 417. An annual licence and registration of the premises is required under the Food Hygiene Regulation 1989 from Council's Environmental Health Section for the guest house kitchen. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner which prevents a noise nuisance beyond the subject land in accordance with the environmental nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines may apply for such offences. Noise emission from air conditioning equipment shall comply with the following requirements: 417.1. The equipment shall be installed and located in a manner which prevents noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 and Council's Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences. 117.2.Submission of written certification from a suitably qualified person confirming that the noise levels comply when measured at the nearest residential boundary. This is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. 117.3.Subject to the Environmental Protection Regulation 1989, the applicant must ensure that equipment is not used on any day if it makes or causes noise to be made — 417.3.1, Before 7am or after 10pm: More than the lower of either — « 40 d(B)A « 3 d(B)A above the background noise level 417.3.2. From 7am to 7pm: More than the lower of either — « 50 d(B)A « 5 d(B)A above the background noise level 117.3.3. From 7pm to 10pm: More than 3 d(B)A above the background noise level.
Page 57
118. 119. 420. 121. 122, 123. 124. -19- The beauty treatment room shalt not perform skin penetration operations unless an approval is obtained under the Public Health (Infection Control for Personal Appearances Services) Act 2003. The developer must provide screened imperviously paved areas large enough for all refuse and recycling bins throughout the development. Suitably designed wash down areas are required with cold-water tap, hose and drain outlet connected to sewer for the cleaning of bins and the refuse transport trailer. The drain outlet is to be designed to prevent stormwater entry to the sewerage system. The storage areas shall be setback a minimum of 10 metres from the high bank of the creek. A plan of the service area for waste bins along Alma Way and storage location of the waste collection vehicle is required to be submitted for assessment with the application for a Development Permit for Operational Works. This service area shall be setback a minimum of 40 metres from the high bank of the creek. : A Trade Waste Permit is required to discharge each type of Trade Waste. The hydraulic drawings are to show all the Trade Waste requirements in accordance with the Noosa Trade Waste Policy. The bin washing area is to be roofed and the floor is to fall to a bucket trap with the waste pre- treated by a grease arrestor prior to discharge to the sewer. Rain water is to be excluded from the bin washing area. Bin washing is to take place only at the bin washing area. Full truck access is to be provided to each grease arrestor and/or pre-treatment device for cleaning and servicing. Where access is restricted, a pump out line is required. A nominated car wash down area is to be provided showing adequate pretreatment of trade waste. Contaminated Land 125. At all times while the subject land is on the Environmental Management Register (EMR) the applicant must comply with the approved Site Mariagement Plan (SMP) for Lot 41 on RP 136508 issued under the Environmental Protection Act 1994 by the Environmental Protection Agency (Contaminated Land Unit). :
Page 58
ADVICE LOCAL LAWS, POLICIES & STATE REGULATION REQUIREMENTS INTEGRATED PLANNING ACT 1997, [DAS DEVELOPMENT APPLICATION 10. A Development Permit for operational works for clearing vegetation is required in accordance with Schedule 8, Part ,1 Table 4, Item 1A of !PA. It is recommended this approval be sought prior to seeking other necessary development permits for the site. Prior to lodging a development application for clearing vegetation, a determination from the Chief Executive of the Department of Natural Resources, Mines and Water should be sought to confirm the purpose of the clearing is a relevant purpose under section 22A of the Vegetation Management Act 1999 (VMA). An application for clearing vegetation must demonstrate compliance with the Regional Vegetation Management Code for Ongoing Clearing Purposes ~ South-East Region (VM Code). in particular any clearing involving ‘of concem’ remnant vegetation requires a suitable offset to meet the performance requirements of the VM Code. The application will also need to demonstrate the proposed setback to the creek complies with the relevant performance requirements of the VM Code and demonstrate viable networks of wildlife habitat will be maintained on the site. Taking of protected flora and fauna requires a permit under the Nature Conservation Act 1992. Approval of this development application will trigger an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of $50,995.00. This amount is subject to variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997. Payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit or for infrastructure charge notices issued separately. Please note that Council will not sea! a Standard Building Format Plan / Building Format Plan / Volumetric Plan until all conditions of approval have been satisfied. : The Environmental Protection Regulation 1989 and Local Law No. 12, prevent a builder or building contractor carrying out building work on a building site in a way that makes or causes audible noise to be made from the building work:- . 6.1. On a Sunday or public holiday, at any time; or 6.2. On a Saturday or a business day, before 7.00am or after 6.30pm. A maximum penalty of $1,500 applies to an offence under under the Environmental Protection Regulation 1989. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Commonwealth Disability Discrimination Act 1992 in regard to the installation of disabled access and the provision. of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia. Pursuant to the Building and Construction Industry (Portable Long Service Leave) Act 1991 if the cost of operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operationa! works must be submitted to Council with the lodgement of any application for operational works over the site. The applicant is to submit two (2) sets of professionally drawn scale plans in compliance with Council's Code controlling food establishments for approval by Council's Environmental Health Section, for any food premises proposed to be included in the development. tn accordance with the Environmental Protection (Water) Policy 1997, alt sand, silt, mud, paint, cement, concrete, builder's waste or rubbish shall not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a water course. On the spot fines may apply for such offences.
Page 59
LIST OF SUBMITTERS INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Name ALLAN MILLER QLD BILL WATSON BRENDAN & RUTH MOY 8W & DIM SMYTH RICHARD HACK C/- JONES FLINT & PIKE, DAVID & MARGARET TREZISE OG & RM BANNEY ELIZABETH MCGOWN ERNST & MARY LOUISE WILLHEIM HEIDI ROTH IAN BEGLEY, MANAGING DIRECTOR, BEGLEY EQUITIIES Ivy POCOCK JEFF & SUE SCOUGALL JO ANDERSON JOHN & MARY LOU LITTLE JOHN & PATRICIA ELDRIDGE JOHN BURGE JOHN MORRIS KAYE MORRIS LEON GEYSHEN & JUDITH GARDEN MARGARET PRICE MAUREEN KENT, PRINCIPAL SUBMITTER SECRETARIAT, NOOSA PARKS ASSOCIATION PETER & ANNE LAMBERT R & M BARRINK S DAVIES $ DAVIES STEVEN NAPIER STUART LAUDER SUSAN SCOUGALL, PRINCIPAL SUBMITTER SUSAN SCOUGALL BOB BORGER, DIRECTOR, VIRIDIAN NOOSA PTY LTD Address 6/ 17 ATTUNGA HEIGHTS ROAD NOOSA HEADS 1/18 WILLIAM STREET MUNNA POINT QLD 4566 4/200 BAROONA ROAD PADDINGTON QLD 4064 3/ 4 ATTUNGA HEIGHTS NOOSA HEADS QLO 4567. PO BOX 6 MAROOCHYDORE QLD 4558 3 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 PO BOX 306 NEW FARM QLD 4005 TINDERBOX FARM TINBERBOX TAS 7054 77 EMPIRE CIRCUIT FORREST ACT 2603 23 MORWONG DRIVE NOOSA HEADS QLD 4567 PO BOX 1837 GEELONG VIC 3220 11 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 9 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 56 MARTINS ROAD EUMUNDI QLD 4562 1/28 VIEWLAND DRIVE NOOSA HEADS QLD 4567 2/ 29 VIEWLAND DRIVE NOOSA HEADS QLD 4567 1885 MALVERN ROAD MALVERN EAST VIC 3145 23 MORWONG DRIVE NOOSA HEADS QLD 4567 17 EUGARIE STREET NOOSA HEADS QLD 4567 22 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 PO BOX 1292 NOOSA HEADS QLD 4567 11 THE QUARTERDECK NOOSA HEADS QLD 4567 PO BOX 836 NOOSA HEADS QLD 4567 1 NAIRANA REST NOOSA HEADS QLD 4567 24 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 32 ANGLER STREET NOOSA HEADS QLO 4567 32 ANGLER STREET NOOSA HEADS QLD 4567 2/10 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 9/ 41 GRIFFITH STREET NEW FARM QLD 4005 9 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 9 ATTUNGA HEIGHTS NOOSA HEADS QLD 4567 GPO BOX 2955 BRISBANE QLD 4001 |