Council archive · source document
23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published] · 132003.221199
Plans and drawings: the text below has words only, no drawings.
60. -12- 59.2.8. dissolved oxygen. 59.3. During the establishment and operation phases, water quality monitoring shall be undertaken every third month and monitoring after significant rainfall events (at least two per year) shall be undertaken for: 59.3.1. total nitrogen, 59.3.2. total phosphorous, 59.3.3. suspended solids and turbidity, 59.3.4, pH, 59.3.5. salinity, 59.3.6. temperature, 59.3.7. dissolved oxygen, 59.3.8. trash and gross pollutants, and 59.3.9. faecal coliforms. 59.4. The applicant shall continue this water quality monitoring for a period of 3 years from completion of the final stage of construction. In addition, the applicant shall undertake inspections for erosion and deposition, the build- up of trash and gross pollutants, and other water pollution. These inspections will be carried out every third month as well as after significant rainfall events, for a period of 3 years from completion of the final stage of construction. 59.5. An operational phase Water Quality Management Plan shall be prepared to the reasonable satisfaction of Council and address water quality performance targets, water treatment devices, water quality maintenance, requirements for stormwater management measures and devices. The plan shall demonstrate compliance with the prescribed water quality objectives. 59.6. Responsibilities under the Stormwater and Water Quality Management Plan shalt be clearly delineated. 59.7. Non-compliance with prescribed water quality standards will trigger the implementation of measures to rectify the problem(s). Reports on monitoring, incidents, corrective action and plan updates shall be submitted to Council every month during construction with Council being notified if any incident is recorded. These reports shall include information collected during the monthly monitoring program, shall highlight any non-standard results, and be submitted in a form acceptable to Council. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following: 60.1. including tables of the monitoring results (digital form should be in Excel); 60.2. include individual charts plotting the results for all parameters required in the monitoring (digital form should be in Excel); and 60.3. include a brief written discussion of the results and recommend any necessary actions. After completion of the construction stage of the development, these reports shall continue every three (3) months for a period of two (2) years, Water Quality Devices 61. Water quality control devices shall be installed generally in accordance with the Stormwater and Water Quality Management Plan. Detailed staging plans and specifications, based on and generally in accordance with the Plan shall be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.