52. -li- The Fire Management Plan shall incorporate ail the relevant requirements of, and be consistent with, all the other management plans required by this approval. Sediment and Erosion Control Plan seqanenaog eee 53. 54. 55. Detailed staged Sediment and Erosion Control Plans shall be prepared for the site and imptemented by the applicant. The Plans shall be in accordance with the institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June 1996) and in particular using Checklist No. 3 from that document. The Sediment and Erosion Control Plans shall cover all development on site (during the construction, establishment and operational phases), ecological restoration and remediation works. All recommendations of the Plans shall be implemented. The Sediment and Erosion Control Plans shall also ensure the protection of the areas of retained and enhanced vegetation and shall: 54.1. identify existing erosion problems, and 54.2. specify appropriate remedial actions. All necessary erosion and sediment control devices shall be incorporated within the development precincts. The applicant must ensure that any person acting on this permit shall prevent erosion and sediment export from teaving the site or entering the creek. Site contro! measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operationa! Works. Stormwater and Water Quality Management Plan 56. 57. 58. 59. A Stormwater and Water Quality Management Plan for the site shall be prepared and implemented by the applicant prior to the issue of a Development Permit for Operational Works. The Stormwater and Water Quality Management Plan shall take into account matters specified in section 19(4) of the Environmental Protection (Water) Policy 1997. Key water quality objectives to be reflected in the Stormwater and Water Quality Management Plan are for the protection of aquatic ecosystems in the waterways of the site, areas adjoining the site, and the receiving waters of Noosa Inlet and the Noosa River. The low nutrient environment of the site and areas adjoining the site are the key factors in determining appropriate performance targets. Specifically, water quality objectives shall include the following performance targets, subject to the constraints of the catchments external to the site: 58.1. Total nitrogen levels — 0.34 mg/l 58.2. Total phosphorous levels — 0.035 mg/l The Stormwater and Water Quality Management Plan shall comply with and address the following issues in relation to the construction, establishment and operation phases of the development: 59.1. Identify all necessary stormwater treatment and water quality devices associated with the development, which shal! be located within the approved boundaries of the development areas. 59.2. During the construction phase, monthly water quality monitoring and monitoring after significant rainfall events (at least two per year) shall be undertaken for: 59.2.1, suspended solids and turbidity, 59.2.2. temperature, 59.2.3. salinity, 59.2.4. total nitrogen, 59.2.5. total phosphorous, 59.2.6. pH, 59.2.7. trash and gross pollutants, and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23677 DA - Approved plans DECISION NOTICE - Planning Services Notice of Decision [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.