Original source · versioned page text
Site Plan 1
Attached to the e-mail MCU14/0096 Applicants Response to SARA's Information Request.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPRODUCTION STREET Area Area - Fish Transport loaelins, Woter Truck Parkins ! | a ee el Emer PEA form vp PON Ent ry SHED 1 SHED 2 Fox} Both an A iS ap Foot Both + + t + 4 sD ao| aed < spd Quarantine Foot Bott. Foo’ | Quarantine Area | 1 Area \ | ! | SHED 3 SHED 4 Wash clown Acrec Waste discharse Connection pomt Waste pipe to waste tank 5 ! inst \ 5a Waste Tank, 22500 ltr Replacemen lS Worer entry point} Sef Water Storage dasoo ltr Seawoter Te be trucked in SITE PLAN Drawing Numloer - 1 Date - 8-3-2015 Scale - 1? Q00
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.