Council archive · source document
Cover Letter - Minor Change Application · 131998.981126.5
Stormwater A Stormwater Management Plan has been prepared by Callaghan and Toth for the new development works which is provided at Attachment 2. The Stormwater Management Plan considers the increase in impervious area of the lot due to the proposed roofed structures. It also details measures to appropriately attenuate runoff to pre-development levels and discharges to an existing drainage structure adjacent to Satinwood Street in the northwest corner of the site. Please refer to the Stormwater Management Plan at Attachment 2 for further details. Carparking The proposed development includes a new storage shed that will replace an existing storage shed and has a gross floor area of 360m2. While providing an increase in gross floor area, the shed is for for the purpose of improving the operation and storage capability for the existing place of worship use and will not result additional carparking demand associated with the site. The 182 spaces which are currently provided appropriately accommodate the demand of the use. Conclusion The above report demonstrates that the proposed additions constitute a minor change under the Planning Act 2016 and appropriately responds to the provisions and intent of the Noosa Plan 2020. This office trusts that the information supplied comprehensively addresses all of the issues relating to the requested minor change to a development approval. Should you have any questions in relation to the proposal, please do not hesitate to contact the undersigned on 0423 952 928 or via email [email protected] sincerely, Marcus Brennan B. Urb. Reg. Plan.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Cover Letter - Minor Change Application.pdfRelated documentApplication case desk ↗
About this file
- File size
- 644 KB (small file)
- File type
No other editions are linked here.