2022-06-13 General Committee Meeting Agenda PUBLIC

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


               Monday, 13 June 2022

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-06-13 General Committee Meeting Agenda PUBLIC(PDF, 5MB).pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 64 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                 13 JUNE 2022




TABLE OF CONTENTS

ITEM                                                                    PAGE

1.     ATTENDANCE & APOLOGIES                                               3

2.     CONFIRMATION OF MINUTES                                              3

3.     PRESENTATIONS                                                        3

4.     DEPUTATIONS                                                          3

5.     ITEMS REFERRED FROM COMMITTEES                                       4

       1   RAL21/0033 DEVELOPMENT APPLICATION FOR RECONFIGURATION OF A LOT
           (1 LOT INTO 8 LOTS) AT 60 GLENRIDGE DRIVE COOROIBAH            4

       2   ENVIRONMENT GRANTS – ROUND 17                                     4

6.     REPORTS DIRECT TO GENERAL COMMITTEE                                  5

       1   MCU21/0146 - APPLICATION FOR A MATERIAL CHANGE OF USE – MULTIPLE
           DWELLINGS (90 DWELLNGS) AT 28 EENIE CREEK ROAD, NOOSAVILLE       5

       2   T000069 TENDER CONSIDERATION PLAN – NOOSA SPIT DREDGING AND
           BEACH NOURISHMENT                                               37

       3   NOOSA ENVIRONMENT STRATEGY MONITORING REPORT                    47

       4   FINANCIAL PERFORMANCE REPORT – MAY 2022                         50

7.     CLOSED SESSION                                                65

       5   INCOMING CEO REPORT      65




                                                                  Page 2 of 69

Section 3

GENERAL COMMITTEE MEETING AGENDA                                        13 JUNE 2022


1.   ATTENDANCE & APOLOGIES




2.   CONFIRMATION OF MINUTES

     The Minutes of the General Committee Meeting held on 16 May 2022 be received and
     confirmed.




3.   PRESENTATIONS

     Nil.




4.   DEPUTATIONS

     Nil.




                                                                         Page 3 of 69

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                      13 JUNE 2022


5.   ITEMS REFERRED FROM COMMITTEES


     PLANNING & ENVIRONMENT COMMITTEE


     1      RAL21/0033 DEVELOPMENT APPLICATION FOR RECONFIGURATION OF A LOT
            (1 LOT INTO 8 LOTS) AT 60 GLENRIDGE DRIVE COOROIBAH
            (Planning & Environment Committee Agenda, 7 June 2022, Item 3, Page 25)
            Reason for referral – significance of the issue.



     2      ENVIRONMENT GRANTS – ROUND 17
            (Planning & Environment Committee Agenda, 7 June 2022, Item 6, Page 62)
            Reason for referral – for further consideration.




     SERVICES & ORGANISATION COMMITTEE

     Nil.




                                                                                       Page 4 of 69

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                         13 JUNE 2022


6.      REPORTS DIRECT TO GENERAL COMMITTEE


1       MCU21/0146 - APPLICATION FOR A MATERIAL CHANGE OF USE – MULTIPLE
        DWELLINGS (90 DWELLNGS) AT 28 EENIE CREEK ROAD, NOOSAVILLE

Author                 Co-ordinator Planning, Patrick Murphy
                       Environment and Sustainable Development

Index                  ECM/ Application/ MCU21/0146

Attachments            1.   Proposal Plans (37-page attachment provided separately to this agenda)


     APPLICATION DETAILS
     Applicant                       Stockwell Development Group Pty Ltd
     Proposal                        Material Change of Use - Multiple dwelling
     Properly Made Date              25 August 2021
     Information Request Date        23 September 2021
     Information Response Date       5 November 2021
     Decision Due Date               16 June 2022
     Number of Submissions           1
     PROPERTY DETAILS
     Property Address                Noosa Civic 28 Eenie Creek Rd Noosaville Qld 4566
     RP Description                  Lot 3 SP 246584
     Land Area                       31.73 Hectares
                                     Future lots 17 - 19 = 10,109m2
     Existing Use of Land            Undeveloped portion of the Shire Business Centre
     STATUTORY DETAILS
     SEQRP Designation               Urban Footprint
     Zone                            Major Centre Zone
                                     Environmental Management and Conservation Zone
     Precinct                        High Density Residential
     Local Plan Area                 Noosaville Local Plan Area
     Overlays                        Land Subject to Acid Sulfate Soils
                                         - 5 metres AHD or below
                                         - Above 5 metres AHD to 20 metres AHD
                                     Biodiversity, Waterways and Wetlands Overlay
                                     Bushfire Hazard Overlay
                                         - High Potential Bushfire Hazard
                                         - Potential Impact Buffer
     Assessment Type                 Impact




                                                                                          Page 5 of 69

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                     13 JUNE 2022


EXECUTIVE SUMMARY
The application seeks to develop 3 lots which form part of the recent Business Centre
reconfiguration approval. The three lots front Hofmann Drive and are included within the High
Density Residential Precinct of the Business Centre. Specifically, approval is sought for 90 dwelling
units which will be situated within 3 x 3 storey buildings.
All of the 90 dwelling units have a gross floor area under 100m2 and are therefore ‘small dwellings
units’ with 37 x 1 bedroom dwelling units, 41 x 2-bedroom dwelling units and 12 x 3-bedroom
dwelling units being proposed.
The development is a consistent use within the zone/precinct with the planning scheme seeking
the delivery of small dwelling units at this location.
The development was reviewed by council’s consulting architect who made a number of
recommendations to align the development’s-built form with the intended design outcomes of the
Noosa Plan. The applicant has amended the design of the buildings in response to this review with
the current design being considered acceptable by council’s consulting architect.
The proposal seeks variation to the scheme provisions with regards to plot ratio, height, front
setback and maximum number of car parking spaces. The proposed variations are acceptable and
in context with the intended scale of development sought for the 3 lots, with the additional height
assisting to articulate the building form. Furthermore, a minor intrusion into the 10 metre wide
Environmental Management and Conservation Zone to the rear of the site is also proposed.
Accordingly, the application is recommended for approval subject to conditions.
RECOMMENDATION
That Council note the report by the Coordinator Planning to the General Committee Meeting dated
13 June 2022 regarding MCU21/0146 for a Development Permit for a Material Change of Use –
Multiple dwellings (90 small dwelling units) situated at 28 Eenie Creek Rd Noosaville and:
A.    Approve the application in accordance with the following conditions:
      Approved Plans
1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table and may
      be further amended by the conditions of this approval.
       Plan No.       Rev.   Plan/Document Name                                                Date
        DA010           N    Development Summary, prepared by mode                           13.05.22
        DA100           Q    Site plan, prepared by mode                                     13.05.22
        DA101           F    Site plan – Level 2, prepared by mode                           13.05.22
        DA102           F    Site plan – Level 3, prepared by mode                           13.05.22
        DA103           F    Site plan – Roof, prepared by mode                              13.05.22
        DA104           P    Basement floor plan, prepared by mode                           13.05.22
        DA111           O    Building A – Level 01, prepared by mode                         13.05.22
        DA112           N    Building A – Level 02, prepared by mode                         13.05.22
        DA113           N    Building A – Level 03, prepared by mode                         13.05.22
        DA114           N    Building A – Roof plan, prepared by mode                        13.05.22
        DA121           N    Building B – Level 01, prepared by mode                         13.05.22
        DA122           N    Building B – Level 02, prepared by mode                         13.05.22
        DA123           N    Building B – Level 03, prepared by mode                         13.05.22
        DA124           N    Building B – Roof plan, prepared by mode                        13.05.22

                                                                                       Page 6 of 69

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                   13 JUNE 2022


       Plan No.       Rev.   Plan/Document Name                                              Date
        DA131          O     Building C – Level 01, prepared by mode                       13.05.22
        DA132          O     Building C – Level 02, prepared by mode                       13.05.22
        DA133          O     Building C – Level 03, prepared by mode                       13.05.22
        DA134          N     Building C – Roof plan, prepared by mode                      13.05.22
        DA200          M     Elevations - Site, prepared by mode                           13.05.22
        DA201          M     Elevations - Site, prepared by mode                           13.05.22
        DA210          P     Elevations – Building A, prepared by mode                     31.05.22
        DA211          P     Elevations – Building A, prepared by mode                     31.05.22
        DA220          P     Elevations – Building B, prepared by mode                     31.05.22
        DA221          P     Elevations – Building B, prepared by mode                     31.05.22
        DA230          O     Elevations – Building C, prepared by mode                     31.05.22
        DA231          O     Elevations – Building C, prepared by mode                     31.05.22
        DA300          O     Sections, prepared by mode                                    31.05.22
        DA301          O     Sections, prepared by mode                                    31.05.22
        DA302          N     Sections, prepared by mode                                    31.05.22
        DA500          B     External finishes, prepared by mode                           13.05.22
        DA001          K     Perspective – Building A, prepared by mode                    13.05.22
        DA002          C     Perspective – Building A, prepared by mode                    13.05.22
        DA003          K     Perspective – Building B, prepared by mode                    13.05.22
        DA004          C     Perspective – Building B, prepared by mode                    13.05.22
        DA005          F     Perspective – Building C, prepared by mode                    13.05.22
     2021-060 SK00     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK01     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK02     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK03     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK04     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK05     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK06     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK07     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK08     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
     2021-060 SK09     D     Hofmann Drive, Noosa Apartments – Landscape Concept          March 2022
         C02           B     Vegetation Clearing Layout Plan                              02/11/2021
         N/A           3     Bushfire Hazard Assessment (BHA) Property 17-19 Hofmann    February 2022
                             Drive Noosaville Lot 5 on SP222982 prepared by
                             Queensland Bushfire Planning

      Nature and Extent of Approved Use
2.    The approved use must not commence until the acoustic treatment works required under
      development approvals 132002.220285.D and RAL18/0023 have been completed and
      certified as compliant with the conditions of these approvals by a suitably qualified person.

                                                                                     Page 7 of 69

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                      13 JUNE 2022


3.    The approved use must not commence until all works required by RAL18/0023 have been
      completed.
4.    The multiple dwelling units must be small dwellings as defined by The Noosa Plan 2020.
5     The study rooms must not be used as a bedroom with these rooms to have at least one wall
      with a maximum height of 1.5 metres.
      Study rooms are the rooms detailed on the plans which do not include a bed within the
      furnishings.
6.    The basement must be backfilled so that the development does not present as more than 3
      storeys.
      Currency Period
7.    This development approval lapses if the use has not happened by 16 June 2028, unless an
      application to extend the currency period is approved by Council.
      Built Form and Development Appearance
8.    The maximum height of the development must be in accordance with the approved plans.
9.    Certification must be submitted to Council from a Licensed Surveyor which certifies that the
      buildings do not exceed the maximum height requirement of this Decision Notice.
10.   All air conditioning units or other mechanical equipment must be fully enclosed or screened
      such that they are not visible from the street frontages nor adjoining properties.
11.   All deck and balcony areas above ground floor must not be enclosed by permanent fixtures
      such as shutters, louvres, glass panelling or the like, except where required to satisfy any
      privacy condition of this Decision Notice.
12.   Screening must be provided to the pad mounted transformer and must be painted in a muted
      colour derived from the approved colour palette to reduce the visual impact of the
      infrastructure in the streetscape.
13.   The development must incorporate the colour scheme and proposed mix of building
      materials as outlined in the approved colour palette and approved plans.
      Performance Bond
14.   Security in the form of a cash bond or trading bank guarantee to the sum of $100,000 must
      be submitted to Council, to secure performance of all conditions of this approval, prior to pre-
      start meeting. The cash bond or trading bank guarantee will be returned on performance of
      the conditions of approval less any costs incurred by Council in respect of enforcing
      performance of this permit. Council reserves the right to call upon the bond or guaranteed
      sum to effect compliance with conditions.
      Protection of Privacy
15.   Where windows or balconies overlook or have the potential to overlook the private open
      space of nearby properties or view into habitable windows within 10 metres, the following
      measures must be implemented to prevent the overlooking:
      a.    Balconies must include screening devices; and/or
      b.    Windows must have a minimum window sill height or 1.7 metres above floor level;
            and/or
      c.    Windows must be fitted with translucent glazing; and/or
      d.    Windows must be fitted with fixed external screens.




                                                                                        Page 8 of 69

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                   13 JUNE 2022


      Street Identification
16.   The street address of the development must be clearly visible and discernible from the
      primary frontage of the site by the provision of a street number and, where appropriate, the
      building name.
      Water & Sewer Connections
17.   An underground connection to reticulated water and sewerage must be provided to the
      development site in accordance with the standards and requirements of Northern SEQ
      Distributor–Retailer Authority (Unitywater).
18.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
      must be submitted to Council that certifies an underground connection to reticulated water
      and sewerage has been provided to the development site.
      Fencing and Walls
19.   Any front fence proposed must be located on the boundary clear of the 6m landscaping
      required to the site’s frontage to Hofmann Drive and:
      a. no more than 1.2 metres high; and
      b. contain openings that ensure it is 50% transparent.
      Clothes Drying Areas
20.   Each dwelling unit must be provided with access to an outdoor clothes line which is screened
      from public view.
      Community Management Statement
21.   Any proposed Community Management Statement required for the development pursuant to
      the Body Corporate and Community Management Act 1997 must be submitted to Council for
      endorsement at the same time as submission of the Building Format Plan (or similar) to
      Council for compliance assessment.
22.   All clauses and by-laws of the proposed Community Management Statement must accord
      with the requirements of this Decision Notice and, in particular, must include the following
      additional clauses:
      a.   The site includes a stormwater management and water quality treatment system.
      b.   The stormwater management and water quality treatment system must be maintained
           in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
           Assets (Version 1).
      c.   The full cost of maintaining the system in accordance with the Water by Design (2009)
           Maintaining Vegetated Stormwater Assets (Version 1) must be included in the
           proposed levies for each dwelling owner/body corporate.
      d.   Any domestic cats kept on the property must be permanently confined within buildings
           and/or cat enclosures for the purpose of protecting proximate wildlife.
      ACOUSTIC
      Noise Amenity
23.   Design and construct the proposed residential development in accordance with the
      recommendations and noise criteria identified in the following:
      a.   Letter dated 23.09.21 from Acoustic Logic to Stockwell Development Group Ref
           20210208.3/0411A/R2/OB and Appendix A of the letter - Report dated 23.09.21
           Acoustic Logic “Noise Residential Apartments, Hofmann Drive, Development
           Application”   dated     23.09.21    Revision    4     Document    Reference
           20210208.3/2309A/R4/JJM”


                                                                                     Page 9 of 69

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                       13 JUNE 2022


      Road Traffic Noise
24.   Design and construct all residential dwellings to achieve design internal noise levels of AS
      2107:2016 “Recommended Design Sound Levels and Reverberation Times for Building
      Interiors” as provided in Section 4.4 of the approved Acoustic Logic report dated 23.09.21.
25.   Building façade and roof construction is to achieve the acoustic ratings as required in Section
      6.1 Tables 19 and 20 and Appendix A, Section 6.2 and Section 6.3 of the Approved Acoustic
      Report (Acoustic Logic Report dated 23.09.21).
26.   Sealing of Window frames in the external façade is to comply with Section 6.4 of the
      Approved Acoustic Report (Acoustic Logic report dated 23.09.21).
27.   Provide mechanical ventilation or air-conditioning to all road traffic noise affected rooms as
      identified in Section 6.5 and Appendix C of the Approved Acoustic Report (Acoustic Logic
      Report dated 23.09.21)
28.   Provide certification from an appropriately qualified acoustic consultant prior to Certificate of
      Classification that the residential buildings have been constructed in accordance with the
      requirements of the Approved Acoustic Report (Acoustic Logic report dated 23.09.21) and
      the measured internal noise levels in respect to road traffic noise comply with the
      AS2017:2016 levels in Section 4.4 of the approved acoustic report.
29.   Provide certification from an appropriately qualified consultant that mechanical ventilation or
      air-conditioning has been installed in all habitable rooms affected by road traffic noise as
      identified in Section 6.5 and Appendix C of the Approved Acoustic Report (Acoustic Logic
      Report dated 23.09.21).
      Mechanical Plant Noise
30.   Design and install all mechanical plant as part of the development to comply with Section 7.1
      and Table 22 of the Approved Acoustic Report (Acoustic Logic Report dated 23.09.21)
31.   Provide certification from an appropriately qualified acoustic consultant prior to Certificate of
      Classification that the mechanical plant has been installed with the requirements of the
      Approved Acoustic Report (Acoustic Logic report dated 23.09.21) and the measured noise
      levels of operational plant comply with Table 22 of the Approved Acoustic Report (Acoustic
      Logic Reported dated 23.09.21).
      ENGINEERING/TRAFFIC
      External Works
32.   Hofmann Drive must be upgraded for the length of its frontage to the subject site. The works
      must be undertaken in accordance with an Operational Works approval, completed prior to
      the commencement of the use and must include in particular:
      a.    construction of a pedestrian footpath in accordance with the conditions of this Decision
            Notice
      b.    removal of all existing property access (driveway/crossovers) and reinstatement of the
            kerb, footpath and verge area to match the balance of the site frontage, including the
            provision of topsoil and turf where the existing verge is grassed
      Site Access and Driveways
33.   A sealed access driveway must be provided from the formation in Hofmann Drive to all
      parking and manoeuvring areas of the development. The works must be undertaken in
      accordance with an Operational Works approval and must include in particular:
      a.    a driveway crossover generally in accordance with Council standard drawing RS-051
            and any associated addendums
      b.    access aisles and ramps in accordance with AS/NZS2890.1:2004 Parking Facilities
      Car Parking, Pedestrian and Bicycle Facilities
                                                                                       Page 10 of 69

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                   13 JUNE 2022


34.   A maximum of 125 car parking spaces must be provided and marked on the site and made
      available and accessible at all times. The works must be undertaken in accordance with an
      Operational Works approval and must include in particular:
      a.   Minimum 9 visitor parking spaces and 4 motorcycle/scoter spaces within the total,
           which are clearly marked for that purpose and accessible at all times for visitor use.
           These spaces must be located outside of the basement.
      b.   1 disabled parking space within the total
      c.   dimensions, crossfalls and gradients in accordance with Australian Standard
           AS/NZS2890.1:2004 Parking Facilities
35.   Pedestrian and bicycle facilities must be provided for the development. The works must be
      undertaken in accordance with an Operational Works approval and must include in particular:
      a.   a 2 metre wide concrete footpath within the Hofmann Drive road reserve extending
           across the full frontage of the sites and connecting to the new pathway to the east of
           the site
      This condition is imposed pursuant to s145 of the Planning Act 2016 being necessary trunk
      infrastructure identified by Council’s LGIP to service the development.
36.   A preliminary Construction Management Plan must be submitted with the Operational Works
      application and must address the following:
      a.   traffic management during all aspects of the construction phase including:
           i.     a Traffic Management Control Plan in accordance with the Manual of Uniform
                  Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                  control measures prior to construction
           ii.    maintenance of safe pedestrian access for the areas affected by the works during
                  and after daily construction has ceased
           iii.   proposed fencing to the site during the construction phase of the development
           iv.    approval of the Traffic Management Control Plan by the Department of Transport
                  and Main Roads (DTMR) for any works on State controlled roads
           v.     provision for worker car parking
      b.   maintenance and protection of water quality and existing drainage lines through the
           construction site, through the implementation of appropriate erosion and sediment
           control measures
      c.   works programme identifying key components of the works and their respective
           durations
      d.   establishment of a communication protocol with the general public, adjoining owners,
           emergency services and local businesses to advise of agreed construction times,
           impacts on traffic, services and other relevant issues.
      e.   Include a post out to the local residents and businesses advising of the proposed
           development, the expected time frames and the site contact details.
      f.   Include signage in prominent locations on the boundaries of the site advising of the
           proposed development, the expected time frames and the site contact details.
      g.   identification of complaint management procedures including:
           i.     contact details for the on-site manager
           ii.    dispute resolution procedures




                                                                                   Page 11 of 69

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                      13 JUNE 2022


      h.      details on the location of external fill/dump sites/sources, the haulage route, type of
              vehicle to be utilised during filling operations and frequency of usage. NB any damage
              to the existing road system as a result of haulage operations shall be fully repaired at
              the applicant’s expense
      i.      it is acknowledged that the preliminary Construction Management Plan will be a draft
              document requiring finalisation upon appointment of the Principal Contractor employed
              to construct the works and a final document will be required to be submitted at the Pre-
              Start Meeting for the project.
      Easements
37.   Unless otherwise agreed in writing by the relevant service provider, any public or third-party
      infrastructure located on the subject site must be placed within an easement registered
      against the title of the property.
38.   All easements must be designed in accordance with the planning scheme and granted at no
      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
      documentation must be in accordance with the Grantee’s standard easement terms. Draft
      easement documentation must be submitted to Council for endorsement.
39.   All works must be kept clear of any existing or proposed easements on the subject land,
      unless agreed otherwise in writing by the Grantee.
      Earthworks and Retaining Walls
40.   All earthworks and associated batters/retaining structures must be undertaken in accordance
      with an Operational Works approval, and contained entirely within the subject site unless
      written permission from the respective landowner(s) is provided to Council.
      Damage to Services and Assets
41.   Any damage caused to existing services and assets as a result of the development works
      must be repaired at no cost to the asset owner at the following times:
      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
              or
      b.      where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and assets
      must first be referred to the relevant service authority for approval.
      Stormwater Drainage
42.   The site must be provided with a stormwater drainage system connecting to a lawful point of
      discharge. The works must be undertaken in accordance with an Operational Works
      approval and the Queensland Urban Drainage Manual, and must include in particular:
           a. the detention system generally as described in Site Based Stormwater Management
              Plan, prepared by ADG, dated 28th October 2021;
           b. provision for the extent of inundation outside of batters of bioretention devices to be
              confined to grassed areas only not to impact pathways, structures or the pool and
              associated infrastructure for any event up to and including the 1%AEP at year 2100.
              A plan showing the extent of inundation and details of proposed signage for grassed
              areas subject to inundation are to be provided with the application for operational
              works;
           c. extension of the site stormwater system to accommodate runoff from any external
              catchment areas which drain onto the subject site at the time of the operational works
              application being lodged. Any flowpath through the site which conveys external
              catchment flows is to be provided with a drainage easement in favour of the external
              property, with registration of the easement required prior to commencement of use;


                                                                                       Page 12 of 69

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                         13 JUNE 2022


           d. the use of gravity stormwater drainage and not surcharge pits to the maximum extent
              practicable. Surcharge pits may only be used where the catchment is composed of roof
              surfaces only;
           e. provision of rainwater tanks for the capture and reuse of roofwater for the irrigation of
              communal landscaping; and
           f.   accommodation for both severe storms or severe blockage of the underground
                drainage network. A Severe Storm/Severe Blockage Assessment for the drainage
                system proposed for the site is to be provided with the development application for
                operational works, and is to demonstrate that finished floor levels will not be inundated
                under either a severe blockage of the underground drainage network in the 1%AEP
                event at year 2100, or for a severe storm exceeding the 1%AEP based on design
                blockage.
      Stormwater Quality Management
43.   A stormwater quality treatment system must be provided for the development. The works
      must be undertaken in accordance with an Operational Works approval and the latest version
      of the Water Sensitive Urban Design Technical Design Guidelines for South East
      Queensland, and must include in particular:
      a.        stormwater quality treatment devices of a size and location generally in accordance
                with those shown in Site Based Stormwater Management Plan, prepared by ADG,
                dated 28th October 2021;
      b.        bioretention devices which:
                  i.    are designed generally in accordance with the Bioretention Technical Design
                        Guidelines (Water by Design, 2012)
                 ii.    are designed generally in accordance with IPWEQA Standard Drawing No. DS-
                        073, DS-075, DS-076, and DS-078
                 iii.   are provided with a free-draining outlet from the sub-soil drainage system
44.   Permanent educational signage must be erected to educate the residents of the development
      about the function of the bioretention device(s). The dimensions, standard, presentation and
      location of the educational signage must be in accordance with an Operational Works
      approval.
45.   All stormwater quality treatment devices must be maintained in accordance with the Water
      by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
      Operational Works drawings for the stormwater quality treatment system and detailed life
      cycle costing of the system must be attached as an addendum to this document. Records of
      all maintenance activities undertaken must be kept and made available to Council upon
      request.
46.   Any proposed Community Management Statement required for the development must
      include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) and
      must include the full cost of maintaining the system in accordance with Water by Design
      (2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of maintaining the
      system must be included in the proposed levies for each unit owner.
      Landscaping Works
47.   The development site must be landscaped. The works must be undertaken in accordance
      with an Operational Works approval and the Noosa Plan for that specific area and Planning
      Scheme Policy (PSP2) - Landscaping and must include in particular:
      a.        the works shown on the Approved Plans with the exception of the following:
                  i.    Substitute Archontophoenix cunninghamiana (Bangalow Palm) for an
                        appropriate species selected from the Noosa Plan 2020 PSP20 Landscaping

                                                                                         Page 13 of 69

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                     13 JUNE 2022


                  policy or endemic to Noosa. Palms are not appropriate for this location (see
                  section 6 of PSP2 – Landscaping.
      b.   a 6 metre wide planted buffer, consisting of local native plant species suitable for the
           location, as shown on the Approved Plans and as required by condition 53 of
           RAL18/0023 ;
      c.   the provision of mature landscaping within the basement, as a consequence of the
           deletion of the 9 car parking spaces, which protrudes through an opening at the podium
           levels between buildings A and B;
      d.   protection of vegetation within the 10 metre wide Environmental and Conservation
           Zone;
      e.   vegetation installed for landscaping adjacent to the 10 metre wide vegetation strip
           protected by the Environmental and Conservation Zone and Covenant J must only
           include Noosa native species and not include any of the undesirable species as
           detailed within the Noosa Plan 2020 - Scheme Policy 3 Landscaping;
      f.   the use of large tree species to provide visual screening of the bulk of the buildings
           from Hofmann Drive and provide shade to the units from the afternoon sun, including
           100 litre specimens;
      g.   vegetated screening of any electrical transformers, bin storage areas and the like from
           the road frontage;
      h.   provision of 1 advanced or ex-ground street tree within the road reserve for every 8
           metres of road frontage; and
      i.   control of all weed species listed in the following standards and legislation:
           i.    declared plants under the Land Protection (Biodiversity Act 2014 and sub-
                 ordinate Regulation 2016).
           ii.   Noosa Local Government Area Pest Management Plan 2015-2019.
48.   All entry statements, fences, batters, retaining walls and buffer/screen plantings must be
      located entirely within private land and not within the public road reserve.
49.   All landscape works must be established and maintained in accordance with the approved
      design for the life of the development, and in a manner that ensures healthy, sustained and
      vigorous plant growth. All plant material must be allowed to grow to full form and be
      refurbished when its life expectancy is reached.
50.   All landscape works must be maintained generally in accordance with the approved design
      for the life of the development.
      Retention of Existing Vegetation
51.   The 10 metre wide existing vegetation protected by the Environmental and Conservation
      Zone must be retained in accordance with an Arborist Report prepared by a qualified person*
      and endorsed through an Operational Works approval as detailed on the Approved Plans
      with the exception of the following:
      *(Refer to Advisory Note)
      a.   the extent of vegetation clearing within the 10 metre wide Environmental Management
           and Conservation Zone for the proposed 600mm building encroachment and 2 metre
           wide x 36 metres long swale as detailed on the approved plans. Vegetation removal
           within the Environmental Management and Conservation Zone must not extend
           beyond the 2 metre wide swale
52.   The report must be resubmitted to Council incorporating the above amendments prior to the
      issue of any Development Permit for Operational Works.*
      *(Refer to Advisory Note)
                                                                                     Page 14 of 69

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                     13 JUNE 2022


53.   Prior to the prestart meeting, a bank guarantee or a bond of $30,000 must be lodged as
      security for the protection of the tree/s identified for retention in the conditions of this
      approval. The bond:
      a.     may be drawn upon by Council in its entirety if any one tree identified for retention is
             damaged to the point where the tree cannot be saved (as confirmed by the project
             arborist and agreed in writing by Council)
      b.     will be returned upon practical completion of all the operational works relating to this
             development.
54.   The tree/s identified for retention in the conditions of this approval must be maintained in
      good health for the life of the tree.
      Vegetation Protection
55.   A “no clearing zone” must be established and maintained over the land area identified as
      ‘Existing Vegetation To Be Retained’ on the Approved Plans. The following activities must
      not be carried out within the no clearing zone:
      a.     clearing, cutting down, poisoning, lopping or pruning of native vegetation which is
             indigenous to, or planted within, the zone
      b.     soil/spoil dumping and/or compacting
      c      soil excavation, other than for planting indigenous native plants.
      The following exceptions apply:
      i.     declared plants under the Land Protection (Pest and Stock Route Management) Act
             2002 and sub-ordinate Regulation 2003, and any Council Listed Environmental
             Weeds, Exotic Grasses and other plants identified in writing by Council
      ii.    indigenous native trees which pose a well-founded threat to persons or property as
             approved in writing by Council
      iii.   controlled bushfire burns to maintain ecological processes subject to submission of a
             Bushfire Management Plan and agreed in writing by Council.
      Fencing to Protected Land
56.   A permanent chain wire fence, at least 1.8 metres high, must be constructed along the entire
      length of the boundary of Lot 17 adjacent to Covenant J and along the full extent of the
      southern edge of the Environmental Management and Conservation Zone, with the exception
      of the 36 metre length of the swale where the fence is to be located on the northern side of
      the swale. The fence must be constructed in accordance with an Operational Works approval
      for Landscaping.
      Fauna Management
57.   Vegetation must only be removed or disturbed in accordance with a Fauna Management
      Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
      Works approval.
      *(Refer to Advisory Note)
58.   Any domestic cats kept on the property must be permanently confined within buildings and/or
      cat enclosures for the purpose of protecting proximate wildlife. All and successive community
      management statements must include a provision to enable the enforcement of this
      requirement.




                                                                                      Page 15 of 69

Section 16

GENERAL COMMITTEE MEETING AGENDA                                                      13 JUNE 2022


      Environment
59.   Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
      not be released from the site or to waters within the site, or be likely to be released should
      rainfall occur, unless all reasonable and practicable measures are taken to prevent or
      minimise the release and concentration of contamination.
60.   Erosion and sediment control measures must be installed and maintained to minimise
      erosion on the site and to minimise the export of sediment and associated pollutants from
      the site. The erosion and sediment control measures must be designed, installed and
      maintained in accordance with current best practice standards
      (*Refer to Advisory Notes).
61.   Limit soil exposure on the site to a distance of no more than 2m beyond the extent of
      earthworks shown on the approved plans except where the exposed soil is effectively
      stabilised without delay and prior to rainfall occurring.
      Bushfire Management
62.   The development must be carried out in accordance with section ‘Bushfire Risk Mitigation’
      of the Bushfire Hazard Assessment (V3) dated February 2022 prepared by Queensland
      Bushfire Planning listed within this Decision Notice.
63.   Certification must be submitted to Council from a qualified person* which certifies that the
      development has been constructed in accordance with the bushfire management conditions
      of this Decision Notice, prior to the commencement of use.
      *(Refer to Advisory Note)
      WASTE DISPOSAL
64.   Prior to the issue of any Operational Works approvals the Operational Waste Management
      Plan must be amended to reflect that all waste collection will be undertaken by Council’s
      contractor via rear lift trucks with the trucks collecting 1100 litre bins.
65.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy 9 - Waste Management. The facilities must include an impervious
      area, within the site, correctly sized for all refuse and recycling containers and suitably
      screened from public places and neighbouring properties. A bin wash area is required with a
      cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet
      must be designed to prevent storm water entry to the sewerage system.
66.   Refuse containers must be provided in accordance with the requirements of the
      Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
      Regulation 2000, for the storage and collection of refuse.
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.    PROPOSAL
The application seeks approval for a multiple dwelling development of 90 dwelling units comprising
37 x 1 bedroom dwelling units, 41 x 2-bedroom dwelling units and 12 x 3-bedroom dwelling units.
The dwelling units are proposed within 3 x 3 storey buildings with all the dwellings defined as ‘small
dwelling units’ under the Noosa Plan 2020, as they have a gross floor area under 100m2.
The development will gain access from Hofmann Drive via a single cross over with 124 car parks
provided within a basement and 10 additional car spaces provided on the basement podium at the
Hofmann Drive entrance.
A copy of the proposal plans is included at Attachment 1.

                                                                                      Page 16 of 69

Section 17

GENERAL COMMITTEE MEETING AGENDA                                             13 JUNE 2022


The following images detail the Locality Pan and plans of the development.




                                        Figure 1 – Locality




                                       Figure 2 – Site Plan




                                                                             Page 17 of 69

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                 13 JUNE 2022




              Figure 3: Building A - front (Hofmann Drive) and rear elevations




                                                                                 Page 18 of 69

Section 19

GENERAL COMMITTEE MEETING AGENDA                               13 JUNE 2022




                      Figure 4: Building A – side elevations




                                                               Page 19 of 69

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                 13 JUNE 2022




              Figure 5: Building B - front (Hofmann Drive) and rear elevations




                                                                                 Page 20 of 69

Section 21

GENERAL COMMITTEE MEETING AGENDA                               13 JUNE 2022




                      Figure 6: Building B – side elevations




                                                               Page 21 of 69

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                 13 JUNE 2022




              Figure 7: Building C - rear and front (Hofmann Drive) elevations




                                                                                 Page 22 of 69

Section 23

GENERAL COMMITTEE MEETING AGENDA                               13 JUNE 2022




                      Figure 8: Building C - side elevations




                       Figure 9 – Perspective - Building A




                                                               Page 23 of 69

Section 24

GENERAL COMMITTEE MEETING AGENDA                             13 JUNE 2022




                      Figure 10 – Perspective - Building A




                      Figure 11 – Perspective - Building B




                      Figure 12 – Perspective - Building C



                                                             Page 24 of 69

Section 25

GENERAL COMMITTEE MEETING AGENDA                                                   13 JUNE 2022


2.    SITE DETAILS
2.1   Background
The subject lot forms part of the Shire Business Centre. The intended development of the site was
originally identified through a master plan process nominated by the 1997 Strategic Plan. Master
plans were developed in consultation with the owners of the site, various external consultants and
the community to achieve the aim of the Strategic Plan and to inform the development of the Noosa
Plan. When the Noosa Plan was created in 2006 it captured MP2 via the inclusion of various
provisions under the Noosaville Locality Code and a master plan known as the Shire Business
Centre precinct map. Noosa Plan 2020 has further evolved and developed the master planning for
the site.
On 20 February 2020, Council, at its Ordinary meeting resolved to refuse an application to
reconfigure 1 lot into 23 lots. As a result of Council’s decision to refuse the subdivision, the
applicant lodged an appeal to the Planning & Environment Court. During the course of the appeal
a series of without prejudice meetings were held, which resulted in a negotiated settlement on 3
September 2020 which allowed for 1 into 23 lot reconfiguration to proceed subject to conditions.
The works associated with the reconfiguring a lot are currently under construction, with this
proposal to be developed on approved lots 17 -19. This is detailed in the following image.




                            Figure 13 – Location of proposed development



                                                                                   Page 25 of 69

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                      13 JUNE 2022


2.2   Site Description
The proposed works are to occur over 3 lots (17 – 19) which are to be created as a result of a
recent reconfiguration approval. The lots range in size from 3,147m2 to 3,719m2. The majority of
the site is currently vegetated with the topography of the site being generally flat except for a bank
to the rear of the site which is included within a 10 metre wide strip that is separately zoned as
Environmental Management and Conservation. The approved lot arrangement and the split zoning
are detailed in the following images:




                                      Figure 14 – Lots 17 – 19 & 21




                          Figure 15 – Split zoning applicable to the subject site

                                                                                      Page 26 of 69

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                    13 JUNE 2022


2.3      Surrounding Land Uses
North: Noosa Civic including loading dock area
South: Residential development comprising 30 dwellings
East: Vegetated covenant area
West: Approved Lot 21 from recently approved reconfiguration – land is situated within the
Business Park Precinct of the Shire Business Centre.


3.       ASSESSMENT
3.1      Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
•        State Planning Policy;
•        South East Queensland Regional Plan;
•        Planning Regulation 2017;
•        Noosa Plan 2020.
3.2      State and Other Statutory Instruments
State Planning Policy
Noosa Plan 2020 is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is consistent
with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for an urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
Statutory Instruments – Planning Scheme
The application must be assessed against the whole of Noosa Plan 2020 to the extent the
provisions are relevant to the development.
Locality Provisions
The subject site is in the Noosaville Local Plan area and is zoned both High Density Residential
and Environmental Management and Conservation. The proposed development is predominantly
located within the High Density Residential zone, is identified as a consistent use with this zone
and is required to follow an impact assessable application process.
The pertinent issues arising out of the assessment are discussed below:


    Criteria                   Planning Scheme                 Proposal              Complies

    Building height
    •   storeys                2 storeys max                   4 storeys             X
    •   metres                 12 metres                       Building A: 13.4      X
                                                               Building B: 13.47m    X
                                                               Building C: 12.49m    X


                                                                                    Page 27 of 69

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                         13 JUNE 2022



Site cover                  45% max                              37.3%                    ✓

Gross floor area            7083m² max                           7558m²                   X

Plot ratio                  0.7:1 max.                           0.75:1                   X

Boundary setbacks
 • Frontage                 1st and 2nd storeys: 6 metres        6 metres                 ✓
                            3rd storey: 8 metres                 6 metres balcony         X
                                                                 7.5 metres building      X


 • Side (east)              1.5/2.0/2.5 metres min               3 metres (wall)          ✓
                                                                 2.5 metres (roof)        ✓


 • Side (west)              1.5/2.0/2.5 metres min               3 metres (wall)          ✓
                                                                 2.8 metres (roof)        ✓


                            1st and 2nd storeys: 6 metres                                 ✓
 • Rear                                                          10 metres
                            3rd storey: 8 metres                 10 metres                ✓

Length of wall              15 metres max                        < 15 metres              ✓

Landscaped open space       4,043² min                           5,432m²                  ✓
Soft landscaping            2,426m2 min 60% of total             > 2,426m²                ✓
Landscaping Setbacks        Frontage: 6 metres                   6 metres                 ✓

Private open space          At ground level—a minimum of         All units comply with    X
                            20m² directly accessed from          the exception of 2
                            living spaces and exclusive of       ground floor units to
                            clothes drying area; or              building C
                            If above ground level—9m² with a
                            minimum width of 2.5 metres
                            accessed directly from the living
                            spaces



Carparking                  102 covered maximum                  124 covered              X
                                                                 10 uncovered             X
                            45 motorcycle spaces                                          X

Bicycle Spaces              45 bicycle spaces                    118 storage cages/       ✓
                                                                 bicycle spaces


                                                                 118 storage cages
End of Trip Facilities*     1 locker per 2 bicycle spaces and;                            ✓
*(required only where 5 +   1 shower cubicle with ancillary
                                                                 Showers        within
spaces are required)        change room per 10 bicycle
                                                                 dwelling units
                            spaces                                                        ✓


                                                                                         Page 28 of 69

Section 29

GENERAL COMMITTEE MEETING AGENDA                                                              13 JUNE 2022


Gross floor area
Where a development is providing for small dwellings at a ratio of at least 3 small dwellings to
every one other dwelling the Noosa Plan 2020 stipulates two different ratios, with the ratios being
relative to the lot sizes. Specifically, lots up to and including 7,000m2 are permitted a plot ratio of
0.75:1 whilst sites over 7,000m2 are permitted a plot ratio of 0.7:1.
In this instance, the area of the proposed works has been approved for 3 separate allotments each
with an area under 7,000m2, which would permit each lot to have a plot ratio of 0.75:1 where
developed individually, but where developed jointly a plot ratio of 0.7:1 is permitted.
It is noted that the footprint of the development comprises 3 clear buildings though each building
is not wholly contained within each of the approved lots. As detailed in the image below, building
B encroaches within the adjoining lot whilst buildings A and C are wholly contained within future
lots 17 and 19.




       Figure 16 – Footprint of each building relative to the boundaries of approved lots 17, 18 and 19



The applicant was advised that Council officers would recommend the proposed plot ratio of 0.75:1
across the whole site on the basis that the buildings are appropriately designed and importantly
that there is clear separation between the buildings, with the buildings reading as 3 separate
buildings. In the initial stages of assessing the development officers were not satisfied that this
design outcome had been achieved. As a result of these concerns the applicant partook in
consultation with council’s preferred architect, Noel Robinson, to review the design. The review
process resulted in refinement of the design, incorporating the feedback of Noel Robinson, with
the plans now under assessment receiving the support of Noel Robinson and considered to
achieve the design objectives of the planning scheme. Accordingly, the application of the 0.75:1
plot ratio is considered appropriate and generally commensurate with development envisaged had
the 3 lots been developed individually.
The following images detail renders of the initial proposal and the current plans under
consideration:



                                                                                              Page 29 of 69

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                     13 JUNE 2022




                                Figure 17 – Render of original proposal




                       Figure 18 – Render of buildings A and B – current proposal

Storeys and Building Height
The planning scheme permits a maximum building height of 12 metre however only permits 2
storeys. It has been clarified with the Strategic Planning team that this is an error in the planning
scheme with the maximum number of storeys intended to be 3.
The proposed buildings exceed the maximum height limit of 12 metres when measured to the
natural ground level however comply when measured to the finished ground level. Measurements
from natural ground level are as follows:
Building A: 13.4 metres
Building B: 13.47 metres
Building C: 12.49 metres
When undertaking the architectural review, it was identified that the original roof form lacked
articulation and contributed to a design outcome that was not consistent with the Noosa Plan 2020.
As the design of the building was progressed, in response to the feedback from council’s consulting
architect, significant changes were made to the form of the roof. These changes are detailed in
the following images:




                                                                                      Page 30 of 69

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                        13 JUNE 2022




                    Figure 19 – Original building design with unarticulated roof form




                         Figure 20 – Amended design with articulated roof form

Whilst the development exceeds the permissible height above natural ground level, the area of
exceedance only relates to sections of the roof. The maximum wall heights, and the majority of the
building bulk, remains well below the 12 metre limit. The applicant’s willingness to engage with and
respond to the feedback of council’s consulting architect has resulted in a superior design outcome
inclusive of the amended roof form. The additional building height assists to better articulate the
buildings. The following images detail how the roof form, including 12-degree roof pitch, result in
the non-compliance with the 12 metre building height requirement.




                                         Figure 21 – Building A

                                                                                        Page 31 of 69

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                     13 JUNE 2022




                                        Figure 22 – Building B




                                        Figure 23 – Building C

Basement
The proposal includes a large basement area to be utilised for the purposes of car parking. In
some areas the distance between parts of the basement and the floor level above exceeds the
scheme requirement of 1 metre and results in the building being 4 storeys. The proposed design
is acceptable as the area around the perimeter of the basement is to be backfilled with no part of
the basement being above the finished ground level and will therefore only present as 3 storeys.
An embankment at the front of the site also means that the existing ground level upon which the
buildings are to be located is generally 1 metre lower than the surface level of the road reserve.
Therefore, the backfilling of the basements will not result in the development being elevated above
the road reserve.
Front Setback
The south-west corner of building A and the north-eastern corner of building B intrude into the
required front setback for the 3rd storey. A setback of 6 metres to balconies and 7.5 metres to the
building are proposed in lieu of the 8 metre requirement. The intrusion relates to a small section at
the corner of each building. In response to the architectural review the buildings were rotated
further away from each other to provide greater separation of the built form and increased
opportunity for landscaping between the buildings. The reduced setback will have limited impact
on the amenity of the streetscape noting that a significant part of each building’s frontage complies


                                                                                     Page 32 of 69

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                       13 JUNE 2022


or exceeds the setback requirement. The following image details the part of each building which
intrudes into the front setback.




                              Figure 24 – 3rd storey front setback intrusions

Car Parking
The Driveways and Car Parking Code prescribes the amount of car parking that is required for the
proposed 1, 2 and 3 bedroom dwellings and also includes a note that for small dwellings in a centre
zone the car parking rate is also the maximum. For this development the maximum number of car
spaces required is 102, whereas 134 car spaces are proposed. At the pre-lodgement meeting the
applicant was advised after consultation with strategic planning that additional car parking was
acceptable generally based on a rate of an additional 1 space per 4 dwellings. This equates to an
additional 23 car spaces above the 102 spaces required by the planning scheme. The proposal
provides for 9 additional car spaces above officers recommended amount.
The intent of providing a maximum limit of the number of car parking spaces within the centre zone
is to reduce the reliance of motor vehicles in areas in which access pedestrian connectivity and
access to public transport is provided. The recent reconfiguration approval provides pedestrian
connectivity and land for the purpose of a transit centre whilst existing bus routes circulate through
Noosa Civic. In this regard, alternative forms of transport will be adequately available to future
residents of the subject site and therefore it is reasonable to limit the number of car parking spaces.
The removal of 9 car parking spaces from the basement will also provide the opportunity for deep
planting to extend through openings in the roof of the basement through to the podium level above.
Councils consulting traffic engineer advised that car parking should be provided at the entrance
podium to offset the absence of motorcycle spaces, as the original plans did not include car parking
in this location. Whilst the plans now include visitor car parking in this location it is recommended
that some motorcycle/scooter spaces be provided, to this effect a condition has been included to
provide 4 motorcycle/scooter spaces which equates to the loss/conversion of 1 visitor car parking
space.
Private open space
2 dwelling units on the ground floor of building C do not comply with the required amount of private
open space. All other dwelling units comply. The non-complying units provide 18m2 of private open
space in lieu of the 20m2 required. The variation from the required amount is supported due to the
minor nature of the variation and the considerable extent of open space located to the rear of the
buildings which includes an off leash dog area, lawn areas and outdoor seating.
Landscaping
Landscaping is detailed within Development Summary drawing DA010 as 53.68%. A 6 metre
vegetated screening buffer along the Hofmann Drive frontage is required in accordance with the

                                                                                       Page 33 of 69

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                       13 JUNE 2022


reconfiguration approval. The landscaping proposed provides a 6 metre wide vegetation buffer to
the Hofmann Drive frontage, and around the buildings and the boundaries with varying vegetation
types and heights scattered between buildings to reduce hard surfaces. The site has a vegetated
separation of the buildings from the Noosa Civic Shopping Centre by virtue of the 10 metre wide
Environmental Management and Conservation Zone, a vegetated covenant is located adjacent to
the eastern boundary of the development site. The majority of the proposed vegetation is native
species with large feature trees included. It is of note that ‘character trees’ may be exotic species
not endemic to the area for example Jacaranda, Poinciana or Fig Trees. It is recommended that it
be conditioned that any landscaping adjacent to the ECMZ and the covenant area only include
species endemic to the area.
Environmental Management and Conservation Zone
The development site has some sections mapped under the Biodiversity, Waterway and Wetlands
Overlay (Noosa Plan 2020). The reconfiguration approval permits the removal of the vegetation
within the development area. An Operational Works approval which is currently being assessed
for vegetation removal.
The development site has a 10 metre wide Environmental Management and Conservation Zone
(EMCZ) backing onto the Noosa Civic Shopping Centre. The Landscaping Concept (Issue D) plans
outline that some of the vegetation is to be cleared to install a 2-metre-wide x 36-metre-long swale
within the 10 metre wide EMCZ. The proposal also seeks that the building C partially encroach into
this this area by approximately 600mm. The zone has a length of 125 metres, the extent of intrusion
is approximately 7.5% of the total area of the zone. The intrusions will not compromise the zones
capacity to provide a vegetated buffer between Noosa Civic and the subject site. It is recommended
that conditions be included ensuring the ongoing protection of the EMCZ by requiring chain wire
fencing to the perimeter of the EMCZ. A similar fence is also recommended to the common
boundary with the covenant area. These intrusions are detailed in the following image (orange
dotted line identifying the 10-metre width of the zone).




             Figure 25 – Intrusion into the Environmental Management and Conservation Zone




                                                                                        Page 34 of 69

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                       13 JUNE 2022


Bushfire
The development site is mapped under the Noosa Plan 2020 Bushfire Hazard overlay map as
potential bushfire impact zone. In addition the site is identified on the State Planning Policy Natural
Hazards Risk and Resilience mapping. The application supporting document Bushfire Hazard
Assessment v3 has been carried out in accordance with the State Planning Policy provisions to
ensure the development is compliant with the current planning requirements. The assessment
identifies that no hazardous vegetation will remain on Lots 17, 18, 19 and that patches of vegetation
less than 3ha are less likely to develop into a fully developed fire front. The document details how
the development meets the performance and acceptable outcomes as detailed within the Noosa
Plan 2020. The conditions included ensure the development is constructed in accordance with the
Bushfire Hazard Assessment and requires compliance.
Acoustic
The application was referred to an external acoustic consultant to review potential noise impacts
upon the development. The acoustic engineer was also involved in a recent change application for
the existing Noosa Civic shopping centre to address the noise impacts of the loading dock area on
future residential development on the subject site. The acoustic engineer has provided conditions
to address the impact of noise from the road on the development with requirements applied to the
loading dock and associated plant under the separate change application to the shopping centre
approval. The recommended conditions include the acoustic engineers recommended conditions.


4.    CONSULTATION
4.1   Referral Agencies
The application was referred to the following Referral Agencies:
•     Department of State Development, Infrastructure, Local Government and Planning (SARA)
The Department is a referral agency for State Transport Infrastructure under Schedule 10, Part 9,
Division 4, Subdivision 1, Table 1, Item 1 – Aspect of development stated in schedule 20 of the
Planning Regulation 2017
The Department has responded advising that it has no requirements for the application.
4.2   Internal Council Referrals
The application was forwarded to the following internal Council officers:
•     Coordinator Development Engineering
•     Senior Environment Officer
4.3   Other Referrals (delete if not relevant)
The application was forwarded to the following external experts for review and/or comment
•     Traffic Engineer
•     Hydraulic Engineer
•     Acoustic Consultant
•     Architect
4.4   Public Notification
The application was publicly notified for fifteen (15) business days in accordance with the Planning
Act 2016. 1 properly made submission was received. The following table provides a summary and
assessment of the issues raised by submitters




                                                                                       Page 35 of 69

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                                13 JUNE 2022



     Matters Raised                                    Comments

     Not appropriate for such high-density housing     The site is zoned High Density Residential and the
     – it will create precedent                        proposed development is consistent with the schemes
                                                       preferred development outcome on the site as all of the
                                                       dwellings are small dwellings.


                                                       Car parking exceeds the requirements of the Noosa
     Car parking is inadequate                         Plan 2020.


     Development won’t be accessible to average        The provision of 90 small dwelling units provides for a
     Noosa working person                              more affordable form of accommodation than has
                                                       traditionally been developed within Noosaville. The
                                                       development will provide the accommodation
                                                       opportunities for employees

5.      CONCLUSION & REASONS FOR DECISION
The application seeks to develop 3 future lots which form part of the recent Business Centre
reconfiguration approval. Specifically, approval is sought for 90 dwelling units which will be situated
within 3 x 3 storey buildings. All the 90 dwelling units have a gross floor area under 100m2 and are
therefore ‘small dwellings units’. The development is a consistent use within the zone/precinct with
the planning scheme seeking the delivery of small dwelling units at this location. Assessment of
the application included review by a consulting architect.
The proposal seeks variation to the scheme provisions with regards to height, front setback and
maximum number of car parking spaces. The application also seeks that the allowable plot ratio
be assessed based on the area of each future lots as opposed to the total area of these lots as
there is a benefit in considering the plot ratio based on the area of each future lot. Furthermore, a
minor intrusion into the 10 metre wide Environmental Management and Conservation Zone to the
rear of the site is also proposed.
The variations are supported on the basis that they will not result in detrimental effects on the
surrounding area and are considered reasonable in context of the site and the development
proposed. Accordingly, the application is recommended for approval subject to conditions.
Departments/Sections Consulted:
       Chief Executive Officer        Community Services                             Corporate Services
       Executive Officer              Community Development                          Financial Services
       Executive Support              Community Facilities                           ICT
                                      Libraries & Galleries                          Procurement & Fleet
                                      Local Laws                                     Property
                                  X   Waste & Environmental Health                   Revenue Services

       Executive Services         x   Environment & Sustainable Development          Infrastructure Services
       Community Engagement           Building & Plumbing Services                   Asset Management
       Customer Service           x   Development Assessment                         Buildings and Facilities
       Governance                     Economic Development                           Civil Operations
       People and Culture             Environmental Services                         Disaster Management
                                      Strategic Land Use Planning                    Infrastructure Planning,
                                                                                     Design and Delivery




                                                                                                Page 36 of 69

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                    13 JUNE 2022


2    T000069 TENDER CONSIDERATION PLAN – NOOSA SPIT DREDGING AND BEACH
     NOURISHMENT


Author           Project Officer, Cody Johnston
                 Infrastructure Services Department

Index            ECM/ Subject / Contracting / Environmental Management
                 ECM/ Project & Contract / T000069 Tender Consideration Plan – Noosa
                 Spit Dredging and Beach Nourishment
                 ECM/Projects (T1) / Noosa Heads Dog Beach SEMP - CAP.WORK - 501023

Attachments      1.   T000069 Tender Consideration Plan



EXECUTIVE SUMMARY
This report provides a recommendation for the process for the award of the contract of the preferred
supplier for the Noosa Spit Dredging and Beach Nourishment works (SEMP Project).
For the purposes of the SEMP Project the value of the contract will be over $200K and therefore
the default process is to issue a Public Tender. However, due largely to the time pressures of the
project, in accordance with the permit window, an alternative procurement strategy is sought.
Under the Local Government Regulation 2012 a Tender Consideration Plan (TCP) is an exception
that enables Council to enter into medium sized ($15K - $200K) and large sized ($200K+) contracts
without first inviting written quotes or tenders.
The SEMP TCP enables Council to expedite the procurement process and, whilst it is not required
under the exception, also enables a competitive quotation process to be undertaken with identified
contractors, including as a result of market analysis.
Council officers are seeking the endorsement of Council to undertake this STP process in order to
meet the exceptional timelines allowable due to the environmental overlay of the area in question
and also to ensure value for money is achieved through the contract award.

RECOMMENDATION
That Council note the report by the Project Officer Infrastructure Services to the General
Committee Meeting dated 13 June 2022 and:
A.   Resolve to prepare and adopt the proposed Tender Consideration Plan for the procurement
     of dredging services for the Noosa Spit Dredging and Beach Nourishment project, under
     section 230 of the Local Government Regulation 2012 and;
B.   Delegate authority to the Chief Executive Officer to enter into a contract with a supplier in
     accordance with the process contemplated in the Tender Consideration Plan, within the Chief
     Executive Officer’s financial delegation, in order to achieve the objectives of the Tender
     Consideration Plan.



REPORT
These works have been programmed to maintain the Noosa Spit and avoid a breakthrough to the
existing development within Noosa Sound and the back of Hastings Street, while also providing a
realigned channel for use by recreational and commercial vessels.



                                                                                     Page 37 of 69

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                       13 JUNE 2022


1.     Background
Council has committed to the completion of the Noosa Spit dredging & beach nourishment works
(of Dog Beach). Council has obtained the required environmental permit to complete the dredging
and nourishment works.
Due to the environmental overlay of the area, the dredging works must be completed by 30
September 2022 to comply with the permit conditions which leaves only a very small window to
engage a specialist contractor and complete all the required dredging works.
As a result of the timeframe pressures, a procurement strategy has been developed in partnership
with Council’s Procurement Team that aims to maximise the timeframe for completion of the
project, whilst at the same time providing for a competitive quotation process that allows Council
to achieve a value for money outcome.
2.     Procurement Process
Due to the timeframe pressures of the project, and in accordance with Section 230 (2) of the Local
Government Regulation 2012, a Tender Consideration Plan (attached) was considered the most
appropriate method of procurement. In accordance with the Regulation the attached Tender
Consideration Plan (TCP) states the following:

1.     The objectives of the Plan,
2.     How the objectives are to be achieved,
3.     How the achievements of the objectives will be measured,
4.     Alternative ways of achieving the objectives,
5.     Proposed Terms of the Contract,
6.     Risk analysis of the market

As outlined in the attached TCP, as a result of the market analysis undertaken by the Project Officer
and due to the noted time pressures, an Invitation to Quote (ITQ) has been issued to three (3)
identified contractors, for evaluation against the following criteria:

                            Criteria                          Weighting
             Price                                30%
             Capability, Resourcing, Contract     20%
             Experience
             Methodology                          25%
             Quality                              5%
             Health and Safety                    5%
             Environment and Sustainability       10%
             Contribution to Local Economy        5%

It has also been noted in the Invitation to Quote to these contractors that, in addition to the outcome
of the evaluation, any resulting contract will be subject to Council approval – in this case including
the adoption of the attached TCP.

Previous Council Consideration
Nil.

Finance
The Noosa Spit Dredging and Beach Nourishment work has a total approved project budget of
$1,236,000. This includes a $990,000 allowance for the required dredging and nourishment works.
Market research of indicative dredging costs of similar works informs that quotations are
anticipated to be within the project’s budget allowance.




                                                                                       Page 38 of 69

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                            13 JUNE 2022


Risks & Opportunities
 Program Risks          Mitigation
                        The TCP process was confirmed to provide the optimum scenario to enable
 Insufficient
                        works completion within the available timeframe.
 construction time to
 complete dredging
                        This was tested against various construction programs using different working
 works within Permit
                        arrangements, machine combinations and confirmed by market research with
 timeframes.
                        capable contractors.
 Financial Risks        Mitigation
                        Indicative construction costs of similar works have been used to set the
                        budgetary allowance. The indicative cost was reaffirmed during the market
 Dredging operation     research of the current market and is within the budget allocation.
 exceeding budgetary
 allowance.             The TCP offers the opportunity to source multiple quotes from suppliers, to
                        provide a value for money option.

 Resource Risks         Mitigation
                        A quote process under the TCP will enable a streamlined procurement process,
                        increasing the available construction timeframe. A smaller timeframe requires
                        larger dredgers and resultingly limits resource availability or capable contractors.

 Quality, safety, and   Market research has been conducted with suppliers to confirm contractor
 service are affected   capability and availability prior to invite.
 due to resource
 shortages.
                        Contractors will be requested to nominate a highly capable team for the project
                        and identify additional and appropriately skilled resources if required.

 Legislative
                        Mitigation
 Compliance Risks

                        The TCP enables Council to invite selected contractors who are considered
 Compliance Issues
                        competent and capable with a proven track record for compliance.


 Safety Risks           Mitigation


                        The TCP enables Council to invite selected contractors who are considered
 Contractor fails to    competent and capable with a proven track record for compliance.
 ensure the work is
 conducted safely and
 in accordance with
 minimum standards.     Council will undertake surveillance, regular safety audits and inspections
                        throughout the dredging services period.

 Environment Risks      Mitigation
                        Council engaged specialist completed BMT to develop a Dredge Management
                        Plan (DMP) that reviews the surrounding environment and to minimise potential
                        impacts of the dredging. The prepared DMP is approved for use by Department
                        of Environmental Services and is provided to the contractor to guide Dredging
                        operations.
 Environment
                        Council will undertake surveillance and inspections throughout the dredging
                        services period. Council will be provided with an incident report upon any
                        incident occurring whilst in the river.




                                                                                            Page 39 of 69

Section 40

GENERAL COMMITTEE MEETING AGENDA                                                         13 JUNE 2022


Consultation
External Consultation - Community & Stakeholder
As outlined in the market analysis section of the attached TCP, identified contractors have been
consulted in regard to their availability and capacity to undertake the works.

Internal Consultation
Infrastructure Services Department and Procurement has consulted with the CEO in regard to
determining an appropriate procurement option for this project.

Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      X   Corporate Services
    Executive Support             Director                                    Director
                                  Community Development                       Financial Services
                                  Community Facilities                        Fleet
                                  Libraries & Galleries                       ICT
                                  Local Laws                              X   Procurement
                                  Waste & Environmental Health                Property
                                                                              Revenue Services

    Executive Services            Environment & Sustainable Development   X   Infrastructure Services
    Director                      Director                                X   Director
    Community Engagement          Building & Plumbing Services            X   Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 40 of 69

Section 41

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022




                                   Page 41 of 69

GENERAL COMMITTEE MEETING AGENDA                                        13 JUNE 2022

          Attachment 1 Noosa Spit Dredging & Beach Nourishment Tender Consideration Plan

                              Tender Consideration Plan

                                      Noosa Spit Dredging and Beach Nourishment

                                                            Contract No: TOQ0069

                                                                        Page 1 of 6

                                                                         Page 41 of 69

Section 42

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022




                                   Page 42 of 69

GENERAL COMMITTEE MEETING AGENDA                                               13 JUNE 2022

           Attachment 1 Noosa Spit Dredging & Beach Nourishment Tender Consideration Plan

           Contents
                                                                              Page No.

           1. DEFINITIONS AND INTERPRETATION..........:::ccessecsseeesseeseseeeesseeesneeeseeeeeceeseesaeeeseneessnesesseseeseresseen
           2. OBJECTIVES OF THE TENDER CONSIDERATION PLAN ...........::::eecccesseeeeeeeeseneeeeeseeneseeeseeeeeeeee
           3. HOW THE OBJECTIVES ARE TO BE ACHIEVED. ............::ccccssseeecesseeeeeeeeseeeeseseneeesesennsseesseseeeesensO
           4. HOW THE ACHIEVEMENT OF THE OBJECTIVES WILL BE MEASURED...........::ccsccsseeeeeeee
              4.1  VALUE FOR MONEY .......cccccccccccceceecceeeceeceteeeeteceteeestesenetistsstttussstsusiieiteteeeee®
              4.2  MEETING THE REQUIRED (PERMIT) TIMEFRAMES ...0....000.0.0.0cccccceeessscetettettetttetteeeeee®
           5. ALTERNATIVE WAYS OF ACHIEVING THE OBJECTIVES. ...........cccccccessseeeesssseeeesssseeseeesseeeeeeeee
           6. PROPOSED TERMS OF THE CONTRACT. ........c:ccecseecesseeeeeeeeseeeeeeesneeeeeeeeeeeeeeseseeeeesseeeeseeeseeeeeee TO
           Tx RISK-ANALYSIS:OF THE MARKED? esceicccccccccisaccccscssravesssseeecvssnnciessrrvnmneermmnmmesmnvensc lO

                                                                               Page 2 of 6

                                                                                Page 42 of 69

Section 43

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022




                                   Page 43 of 69

GENERAL COMMITTEE MEETING AGENDA                                                             13 JUNE 2022

            Attachment 1 Noosa Spit Dredging & Beach Nourishment Tender Consideration Plan

             Background:
             Council has committed to the completion of the Noosa Spit Dredging & Beach Nourishment works
             (Dog Beach).
             The Infrastructure Department has obtained the required environmental permit to complete the
             dredging and nourishment works. The dredging works however must be completed by September
             30" to comply with the permit’s conditions. This leaves only a very small window to engage a
             specialist contractor and complete all the required dredging works.
             The effectiveness of the beach renourishment and river channel dredging will be dependent on the
             completeness of the designed dredging works.
             Operative Provisions:
             1.    DEFINITIONS AND INTERPRETATION
             1.1   Definitions
                    In this Tender Consideration Plan, unless inconsistent with the context or subject matter:
                   (a)    Act means the Loca/ Government Act 2009;
                   (b)    Council means Noosa Shire Council;
                   (c)    Objectives means the objective set out in Clause 2 of this Tender Consideration
                          Plan;
                   (d)    Regulation means the Loca/ Government Regulation 2012;
                   (e)    Tender Consideration Plan means this tender consideration plan, which Council
                          has prepared and adopted pursuant to section 230 of the Regulation.

            2.     OBJECTIVES OF THE TENDER CONSIDERATION PLAN
             2.1   The objective of this Tender Consideration Plan (TCP) is to enter into a contract with a
                   selected contractor for the completion of works for the Noosa Spit Dredging and Beach
                    Nourishment, within the parameters and timeframes of the environment permit issued by
                    Department of Environment and Science.
             2.2    It is proposed that the establishment of this contract be via a competitive Invitation to
                   Quote (ITQ) process to contractors identified as a result of market analysis, as outlined in
                   Section 7 of this TCP.

             2.3    In accordance with the permit that has been granted to Council, there is a specified
                   window of opportunity for the works to be completed. It is anticipated that establishing a

                                                                                             Page 3 of 6

                                                                                             Page 43 of 69

Section 44

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022




                                   Page 44 of 69

GENERAL COMMITTEE MEETING AGENDA                                                                13 JUNE 2022

             Attachment 1 Noosa Spit Dredging & Beach Nourishment Tender Consideration Plan

                    contract on or before by 24 June 2022, as a result of this TCP, will provide Council the
                    best opportunity of completing the works within this window.
                    The longer the duration that a contractor has to complete the works the greater flexibility
                    the contractor has for machinary selection, potentially lowering construction cost, program
                    resiliance to delay due to breakdown or inclement weather/river contitions, and a better
                    opportunity to ensure a quality finish of the the beaches nourishment.

            3.      HOW THE OBJECTIVES ARE TO BE ACHIEVED
             3.1    The Objectives will be achieved by:
                    (a)    Inviting written quotations from identified contractors that Council considers are
                           capable of delivering the required services within the timeframes, and assessing
                           those quotations against the following weighted criteria:

                         Capability, Resourcing, Contract
                         Experience
                         Methodolog
                       [Quality                            5%
                         Health and Safet
                         Environment and Sustainabilit
                         Contribution to Local Econom

                    (b)    As a result of a market analysis and given the time pressures for this project an
                           Invitation to Quote (ITQ) has been issued to three (3) identified contractors as
                           follows:
                                          e   Rimlex Pty Ltd t/a Nabis Dredging,
                                          e   Hall Contracting Pty Ltd , and
                                          e   Neumann Contractors Pty Ltd,
                           The ITQ has been issued advising that any resutling contract will be subject to
                           evaluation of responses against the criteria outlined in this TCP and Council
                           resolving to adopt this TCP.
             4.     HOW THE ACHIEVEMENT OF THE OBJECTIVES WILL BE MEASURED
             4.1    Value for Money
                    Council will:
                    (a)    Undertake market analysis of identified dredging contractors to determine
                           availability/capacity to undertake the works, and subsequently issue the ITQ to
                           those that confirm (refer Section 7 below),
                    (b)    Evaluate the Invitation to Quote (ITQ) responses against the criteria out lined 3.1
                           (a) above,
                    (c)    Determine Value for Money, as a result of ITQ evaluation and in particular the
                           quotation breakdowns, against the allocated budget.

                                                                                                Page 4 of 6

                                                                                                Page 44 of 69

Section 45

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022




                                   Page 45 of 69

GENERAL COMMITTEE MEETING AGENDA                                                               13 JUNE 2022

             Attachment 1 Noosa Spit Dredging & Beach Nourishment Tender Consideration Plan

             4.2    Meeting the Required (Permit) Timeframes
                    Council will:

                    (a)    Evaluate the ITQ responses against key project success criteria including delivery
                           of the project within the permit window — by 30 September 2022,
                    (b)    Manage the resulting contract under the terms and conditions and work with the
                           contractor to achieve the timeframe milestones and the environmental
                           requirements of the permit.
            5.      ALTERNATIVE WAYS OF ACHIEVING THE OBJECTIVES
             5.1    Alternative ways of achieving the Objectives
                    (a)    Council could conduct a public request for tender for the engagement of a suitable
                           contractor to undertake the works pursuant to section 228 of the Regulation.
                    (b)    Council could consider amending its existing dredging contract to incorporate
                           these works.

             5.2    Why the alternative ways were not adopted:
                    (a)    A public tender must allow written responses to be received for a minimum period
                           of 21 days. If the resulting tender evaluation and recommendation were to move
                           through the July Meeting cycle, the earliest award date for a contract would be 29
                           July 2022.
                           This would further reduce the window for works to be completed within, limit the
                           machinery capable of completing the works, and further limit the number of
                           available contractors.

                           The other option to expedite the award of the contract as a result of public tender,
                           in accordance with Council's Assessment of Procurement Contracts >$200,000
                           <$1M, would also mean that the contract wouldn't be awarded until early-mid July
                           2022.
                           It is anticipated that expediting the award of a contract for these services will
                           provide Council a better opportunity of completing the works within the timeframes
                           and subsequently a better Value for Money outcome.
                    (b)    Council’s existing dredging contract is a result of a public tender awarded by
                           council in March 2022, whereby only a single tender was received. Vhilst the
                           contract does allow for variations over its term, due to the scale and value of this
                           particular project the agreed preference is to seek competitive quotations from
                           identified contractors under this Tender Consideration Plan, in accordance with
                           Section 230 of the Local Government Regulation 2012.

                                                                                                Page 5 of 6

                                                                                                Page 45 of 69

Section 46

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022




                                   Page 46 of 69

GENERAL COMMITTEE MEETING AGENDA                                                              13 JUNE 2022

             Attachment 1 Noosa Spit Dredging & Beach Nourishment Tender Consideration Plan

            6.      PROPOSED TERMS OF THE CONTRACT
             6.1    The proposed terms of the Contract will be substantially in accordance Council’s Service
                    and Fixed Term contract.
            7.      RISK ANALYSIS OF THE MARKET
             7.1    Council is aware of the limited availability of the speciality contractors required to complete
                    dredging works. This was reflected in Council’s recent Tender process for dredging
                    services, awarded in March 2022, whereby only one (1) tender was received.
                    Considering above, the Infrastructure Department conducted market research with three
                    (3) Sunshine Coast based, one (1) North Brisbane based, and one (1) Gold Coast based
                    dredging contractors. These being:
                               e  Broadwater Dredging Pty Ltd,
                               e  Rimlex Pty Ltd t/a Nabis Dredging,
                               e  Hall Contracting Pty Ltd , and
                               e  Neumann Contractors Pty Ltd,

                    Email and follow up phone correspondence was made with the four (4) contractors above
                    to discuss their availability and capability to complete the proposed works. The large
                    volume of material required to be dredged and placement within the small environmental
                    window was the key criteria for the discussions. As a result, two (2) of the four (4) contacted
                    contractors confirmed the ability to complete the proposed works. In addition to the four (4)
                    contractors listed above, another contractor was identified, and contact made however they
                    are no longer in business.
                    A summary of the feedback from the contractors contacted is as follows:
             1.     One (1) contractor advised that they were unable to complete works as they do not have
                    an appropriately sized dredging machine to complete works within the time frame.
             2.     Two (2) contractors confirmed suitable sized dredging machinery is available to complete
                    works within the time frame. Dredging machines available ranged from operating at
                    150m3/hr, which is the estimated minimum size to complete works, up to 180-220m3/hr.
             3)     One (1) contractor advised that they were unable to complete due to the availability of
                    their suitably sized machine as they have already committed to completing works within
                    the project timeframes. They did however request to be included in the ITQ.

                                                                                              Page 6 of 6

                                                                                               Page 46 of 69

Section 47

GENERAL COMMITTEE MEETING AGENDA                                                    13 JUNE 2022


3    NOOSA ENVIRONMENT STRATEGY MONITORING REPORT


Author           Shaun Walsh, (Acting) Environmental Services Manager
                 Environment and Sustainable Development Department

Index            ECM/ 21.44 Environment Strategy / Biodiversity Plan

Attachments      1.    Noosa Environment Strategy Monitoring Report 2019 – 2021
                       (22-page attachment provided separately to this agenda)


EXECUTIVE SUMMARY
The following report and attachment has been prepared to provide an update on the performance
of the Noosa Environment Strategy 2019. It is a commitment of the Noosa Environment Strategy
2019 that a report on the progress towards the 12 targets be provided every two years.
This monitoring report shows the status the Noosa Environment Strategy as at 30 June 2021 which
is the end of second year of the Strategy’s ten year life.
The attachment highlights the areas within this plan where monitoring of targets is well established
and progress is as predicted but also shows some areas where there is still more work needed to
establish baseline datasets and comprehensive monitoring programs. The monitoring report
contents will continue to be refined in future versions as data sets are updated or become available
on future years.

RECOMMENDATION
That Council note the report by the Acting Environmental Services Manager to the General
Committee Meeting dated 13 June 2022 and provide the Year 2 biennial report on progress
towards the 12 targets outlined in the Noosa Environment Strategy 2019.

REPORT
At the June 2019 Ordinary Meeting Noosa Council endorsed the Noosa Environment Strategy &
Implementation Plan. The Noosa Environment Strategy is the key strategic policy document for
Council related to our environment and the way we live within it. The Strategy identifies key
strategies, outcomes and measurable targets that guide decision-making and support prioritisation
of investment over the 10 year life of the strategy.
The Strategy provides a clear monitoring, evaluation and reporting framework for the Strategy that
consists of;
•    Annual reporting on the progress of specific implementation actions associated with the
     Environment Strategy.
•    Biennial reporting against the 12 targets identified in the Environment Strategy, to measure
     the success of the Strategy’s implementation.
A copy of the Noosa Environment Strategy 2019 can be found at the following link
https://www.noosa.qld.gov.au/downloads/file/1130/noosa-environment-strategy
The Noosa Environment Strategy is made up of 4 overarching themes: Biodiversity, Waterways,
Wetlands & Coasts, Sustainable Living and Climate Change Resiliance and Adaptation. Each of
these themes has 3 associated strategies and targets that are intended to improve the state of the
environment in Noosa. This report and attachment provides a snapshot of each of the 12 targets
and the current state of the data used to evaluate progress towards them.
It is noted that this biennial monitoring report has been significantly delayed due to the departure
of the former Environmental Services Manager, COVID and natural disaster disruptions. It is also

                                                                                     Page 47 of 69

Section 48

GENERAL COMMITTEE MEETING AGENDA                                                        13 JUNE 2022


noted that datasets and monitoring programs will likely be amended and refined through the life of
the strategy as knowledge, available data and technologies improve or change.
It is noted that this is the first time Council has published such a comprehensive environmental
monitoring report and provides a key benchmark for long term (decades) performance and change
in the Noosa Biosphere. Over time this report will assist in determining management strategies
and actions, and hopefully also be a good news story in key metrics.
Summary of Progress
It was anticipated that by the end of the 2020/21 financial year, most of the long-term monitoring
baselines would be in place or well progressed.
Of the 12 targets, 5 have comprehensive baselines and established monitoring programs. 3 are
missing components of the metrics intended to be used for monitoring or are yet to be
comprehensively monitored and 4 targets where baseline data and monitoring programs are still
being developed.

    Theme                  Established               Partly established        Not yet established

    Biodiversity           1                         1                         1

    Waterways, wetlands    0                         2                         1
    and Coasts

    Sustainable Living     2                         0                         1

    Climate Change         2                         0                         1
    Adaptation and
    Resilience

Previous Council Consideration
Ordinary Meeting Minutes 17 February 2022, Item 2, Page 4
That Council note the report by the Acting Environmental Services Manager to the Planning &
Environment Committee Meeting dated 08/02/2022, providing the year 2 annual report on the
implementation of the Noosa Environment Strategy.
The draft report was circulated internally to Councillors and Council staff for review, with substantial
and worthwhile comments received.
Finance
The Noosa Environment Strategy 2019 and supporting Implementation Plan is funded program.
Budget bids are being considered for additional resourcing for the FY 2022/23 in the following
areas to maintain and improve performance:
•       Community Bushland Care support
•       Ongoing foreshore management planning
•       Threatened Species Monitoring program
Consultation
External Consultation - Community & Stakeholder
There has been no external consultation for this specific report, though it is noted that many of the
programs have external implementation partners, who are key community stakeholders.
The finalised monitoring report for the 2019 to 2021 period will be distributed to key community
stakeholders posted onto Council’s website as a record of Councils performance against the
Environment Strategy.
Any feedback received from stakeholders can be considered in the formation of the next monitoring

                                                                                        Page 48 of 69

Section 49

GENERAL COMMITTEE MEETING AGENDA                                                        13 JUNE 2022


report, scheduled for 2023.
Internal Consultation
Many of the programs in the Noosa Environment Strategy Implementation Plan are implemented
by different Council departments and there is ongoing liaison.
Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      x   Corporate Services
    Executive Support             Director                                    Director
                                  Community Development                       Financial Services
                                  Community Facilities                        Fleet
                                  Libraries & Galleries                   x   ICT
                                  Local Laws                                  Procurement
                                  Waste & Environmental Health                Property
                                                                              Revenue Services

    Executive Services        x   Environment & Sustainable Development       Infrastructure Services
    Director                  x   Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture        x   Environmental Services                      Disaster Management
                              x   Strategic Land Use Planning                 Infrastructure        Planning,
                                                                              Design and Delivery




                                                                                         Page 49 of 69

Section 50

GENERAL COMMITTEE MEETING AGENDA                                                                           13 JUNE 2022


4         FINANCIAL PERFORMANCE REPORT – MAY 2022

Author                Financial Services Manager (Acting), Pauline Coles
                      Corporate Services Department

Index                 ECM/ Subject / 22.09 – Monthly Financial Performance Report

Attachments           1.       Statement of Income and Expenditure (Profit & Loss and Capital)
                      2.       Statement of Financial Position
                      3.       Statement of Cash Flows
                      4.       Summary of Materials and Services Expenditure


EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 31 May 2022 is positive with
operating revenues outperforming forecast and operating expenditure below budget. Capital
revenues are above forecast with capital expenditure continuing to be delayed due to impacts on
project delivery from weather events and resource and supply chain delays.

     YTD Financial Performance Summary
                                           Budget            Actual         Variance         Variance
                                                                                                              Status
                                              $m                $m               $m                %
     Operating Revenue                      $105.2           $110.6                 $5.5           5.2%    Above Budget
     Operating Expense                         $96.3          $95.9                 $0.5           0.5%      On Track
     Operating Position                         $8.8          $14.8                 $6.0           67.8%
     Capital Revenue                           $13.0          $15.1                 $2.0           15.6%   Above Budget
     Capital Expenditure*                      $43.4          $29.5             $13.9              32.0%   Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.

Figure 1: Actual Performance Compared to Budget

 $120
                           $105.2     $110.6
                                                                            $96.3          $95.9
 $100

    $80

    $60

    $40

    $20

     $-
                       Operating Revenue                               Operating Expenditure
                                    YTD Budget ($m)          YTD Actual ($m)

Council’s performance against key measures of financial sustainability has been calculated as at
May 2022. These indicators enable the reader to assess Council’s success in managing its budget,

                                                                                                           Page 50 of 69

Section 51

GENERAL COMMITTEE MEETING AGENDA                                                                13 JUNE 2022


cash and debt as well as undertaking sustainable asset management. The table below contains a
snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                                      Current          Actual
                                    Target                                                 Status
                                                      Budget            YTD
 Operating Surplus Ratio             0-10%             -0.6%           13.4%           Above Target
 Net Financial Liabilities
                                                                                       Above Target
 Ratio                               <60%             -12.7%           -36.5%
                                                                         12.4
 Cash Cover Ratio                                                                      Above Target
                                   3 months          8.8 months        months
 Asset Sustainability Ratio          > 90%            130.1%           77.6%           Below Target


RECOMMENDATION9
That Council note the report by the Financial Services Manager (Acting) to the General Committee
Meeting dated 13 June 2022 outlining May 2022 year to date financial performance against budget,
including changes to the financial performance report with the inclusion of key financial
sustainability indicators.

REPORT
Operating Revenue (YTD Benchmark 91.67%)
Council has received 99% ($108.1 million) of its operating revenue budget ($109.6 million).
Commentary on each revenue category is provided below.

 Category             Summary                    Comments
 Rates and Levies     $74.9 million (100.2%)     •   Waste utility charges $343k above YTD budget
                      of the annual budget of        (101.6% or $13.5 million of $13.2 million annual budget
                      $74.8 million has been         earned)
                      earned                     •   General rate (net of discounts) $78k below YTD budget
                                                     (99.9% or $56.1 million of $56.2 million annual budget
                                                     earned)
 Fees and             $8.2 million (99.6%) of    •   Development assessment fees $219k above YTD
 Charges              the   $8.25      million       budget (96.1% or $2.3 million of $2.4 million annual
                      annual budget has              budget earned)
                      been earned                •   Plumbing application fees $124k above YTD budget
                                                     (106.0% or $1.38 million of $1.30 million annual budget
                                                     earned)
                                                 •   Property and Facility fees $261k above YTD budget
                                                     (134.0% or $547k of $408k annual budget earned)
                                                 •   Local Laws fees $68.1k above YTD budget (98.0% or
                                                     $1.5 million of $1.56 million annual budget earned)
                                                 •   Building application fees $55k above YTD budget
                                                     (93.5% or $801k of $857k annual budget earned)
 Sale of Goods        $11.9 million (107%) of    •   Holiday Park sales $607k above YTD budget (112.5%
 and Services         the   $11.1      million       or $3.4 million of $3.1 million annual budget earned) –
                      annual budget has              Positive revenue variances that hold through the
                      been received                  financial year will be offset in part by additional variable
                                                     operating costs
                                                 •   Waste management sale of recoverable materials
                                                     $552k above YTD budget (144.3% or $1.6 million of
                                                     $1.1 million annual budget earned)


                                                                                                Page 51 of 69

Section 52

GENERAL COMMITTEE MEETING AGENDA                                                                              13 JUNE 2022


 Category              Summary                       Comments
                                                     • Waste disposal fees $201k above YTD budget (96.4%
                                                        or $3.9 million of $4.0 million annual budget earned)
                                                     • Noosa Aquatic Centre revenue $131k above YTD
                                                        budget (100.9% or $1.73 million of $1.71 million annual
                                                        budget earned)
 Interest              $717k (107%) of the           •      Interest revenues on cash invested will need ongoing
 Received              $670k annual budget                  monitoring to ensure returns on surplus funds are
                       has been earned                      maximised as investment rates begin to increase.
 Other Revenue         $2.7m (87%) of the            •      Waste sulo bin recoveries from Cleanaway below YTD
                       $3.1 million annual                  budget $104k (45.4% or $102k of $226k annual budget
                       budget   has  been                   earned) – correlates to lower sulo bin purchases
                       earned                        •      Holiday Park electricity recoupment below YTD budget
                                                            $108k. No revenue recouped YTD due to supplier
                                                            delays from COVID. Works have now commenced,
                                                            and project is in implementation phase.
                                                     •      Unbudgeted insurance proceeds received $52k
 Operating             $8.3 million (140%) of        •      $1.4m in Community resilience and disaster
 Grants,               the $5.9 million annual              management grants have been received in respect to
 Subsidies             budget     has    been               the recent flood event. These funds have been
                       received                             recorded as operational grants until the program of
                                                            works has been finalised.
                                                     •      Council received $392k from the Black Summer
                                                            Bushfire Recovery Grant program for building bushfire
                                                            resilience through technology innovation with $167k
                                                            allocated for operational projects.
                                                     •      75% of the 2023 financial assistance grant was prepaid
                                                            in April 2022. Historically only 50% of this grant is
                                                            prepaid in June so this may impact on Council’s
                                                            2022/23 final operating position if the prepayment
                                                            approach is discontinued by the Australian
                                                            government.
 Unitywater            On track                      •      Unitywater distributions are fixed each year so little
 Distributions                                              budget variance risk


Figure 2: Operating Revenue Position by Type (Excluding Rates)

 $14.0
                                             $11.9
 $12.0                                                                  YTD Budget ($m)
                                     $10.3
                                                                        YTD Actual ($m)
 $10.0
                                                                                       $8.3
         $7.5 $8.2
  $8.0
                                                                               $5.6
  $6.0
                                                                                              $3.9 $3.9
  $4.0
                                                     $1.7 $1.7
  $2.0                 $0.6 $0.7                                   $0.9 $1.0

  $0.0
                                                         Income




                                                                       Other
             Charges




                                                                                   Grants
                                       Goods &




                                                                                                 Unitywater
                                       Services
                                       Sales of




                                                          Rental
                          Interest
             Fees &




                                                                                                  Share of




                                                                                                              Page 52 of 69

Section 53

GENERAL COMMITTEE MEETING AGENDA                                                             13 JUNE 2022


Operating Expenditure (YTD Benchmark 91.67%)
Actual operating expenditure is currently 87% ($95.9 million) of full year budget ($110.1 million).
Detailed commentary for each expenditure category is provided below.



 Category           Summary                          Comments
 Employee Costs     $34.0 million (89%) of the       •     YTD under expenditure for permanent staff
                    annual budget of $38.1 million         salaries and wages ($3.6 million) due to position
                    has been expended                      vacancies, partially offset by additional spend on
                                                           casual staff and external labour hire ($1.9 million).
                                                     •     Training costs $119k below YTD budget (41.7%
                                                           or $138k of $332k annual budget spent)
 Materials and      $42.6 million (83%) of the       •     Environment Services costs $421k below YTD
 Services           $51.1 million annual budget            budget (45.5% or $1.6 million of $3.6 million
                    has been expended.                     annual budget spent) – COVID-19 impacts on
                                                           staff have delayed project delivery YTD.
                                                     •     Economic Development $257k below YTD budget
                                                           (90.0% or $3.1 million of $3.5 million annual
                                                           budget spent)
                                                     •     Development Assessment $193k below YTD
                                                           budget (63.3% or $1.0 million of $1.7 million
                                                           annual budget spent)
                                                     •     Strategic Land Use Planning costs $188k below
                                                           YTD budget (38.0% or $188k of $493k annual
                                                           budget spent)
                                                     •     Beaches and Canals $153k below YTD budget
                                                           (32.7% or $291k of $891k annual budget spent)
                                                     •     Holiday Parks $571k above YTD budget (124.3%
                                                           or $2.1 million of $1.7 million annual budget
                                                           spent) – offset by additional revenue.
                                                     •     Libraries & Galleries $130k below YTD budget
                                                           (66.5% or $1.2 million of $1.8 million annual
                                                           budget spent) – timing of heritage programs and
                                                           operational contract services
                                                     •     Waste Management $127k above YTD budget
                                                           (92.3% or $10.4 million of $11.3 million annual
                                                           budget spent)
                                                     •     Civil Operations $215k above YTD budget
                                                           (89.49% or $2.8 million of $3.1 million annual
                                                           budget spent). This variance relates in part to
                                                           flood remediation works undertaken to date and
                                                           will be funded via disaster recovery grants.
 Finance Costs      On track                         Nil
 Depreciation       On track                         Nil
 Other Expenses     On track                         Nil




                                                                                              Page 53 of 69

Section 54

GENERAL COMMITTEE MEETING AGENDA                                                                             13 JUNE 2022


Figure 3: Operating Expenditure Position by Type
                            $42.3 $42.6
$45.0
                                                                    YTD Budget ($m)
$40.0
           $34.8 $34.0                                              YTD Actual ($m)
$35.0
$30.0
$25.0
                                                                           $18.0 $18.0
$20.0
$15.0
$10.0
 $5.0                                           $1.0 $1.0                                         $0.2 $0.2
 $0.0



                                                    Finance Costs
                                Materials




                                                                               Depreciation
               Employees




                                                                                                     Other
Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure at 31 May 2022 is outlined below:
 Expenditure                   Annual Budget                         YTD Budget               YTD Actual      YTD Variance
                                         $m                                 $m                       $m
 Payment to Tourism Noosa                   $2.52                          $2.52                   $2.52                 -

 Economic Development                       $1.06                          $0.85                   $0.61             $0.34

 Total                                      $3.58                          $3.47                   $3.13             $0.34

All instalments payable under the Tourism Noosa agreement for the 2021-22 financial year have
been made. The current agreement, which was due for renewal at 30th June 2022 has been
extended for a further 12 months.
YTD Economic Development expenditure is below budget due to lower employee costs ($95k),
due the Branch Manager acting as Director of Environment & Sustainable Development for part of
the financial year and vacancies in the branch. This has also impacted timing for delivery of
initiatives under the Local Economic Plan ($204k). The timing of the Firetech conference ($43k),
which is grant funded, has also been delayed due COVID impacts. Discussions are ongoing to
reschedule the conference now restrictions have eased.
Tourism and economic development activity is funded through the general rate, with 5.8% of the
annual general rate committed towards tourism and economic development. Should actual general
rate revenue fall below budget, this does not impact Council’s contractual commitment to fully fund
all tourism and economic development activity. Any general rate revenue shortfall is funded
through other general revenue sources to ensure all planned activities are undertaken in full.
Disaster Recovery Works
To date Council has incurred $704k in cost associated with remediation works and counter disaster
operations resulting from the February 2022 flood event with a further $254k in commitments.
Erscon Consulting have been engaged to assess and quantify the damage to infrastructure and
other Council assets and once complete Council will be provided with a report outlining the works
required.



                                                                                                             Page 54 of 69

Section 55

GENERAL COMMITTEE MEETING AGENDA                                                                          13 JUNE 2022


$1.4 million in disaster recovery funding has been received to date and additional funding will be
sought once assessments are completed and the program of works finalised.
Capital Revenue
YTD capital revenue of $15.1 million received comprises cash contributions from developers ($2.0
million) and capital grants ($12.4 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the
timing of the receipt of developer contributions (both cash and contributed) is unpredictable.


Figure 4: Capital Revenue by Type

$14.0
                                                              $12.4
                                                                         YTD Budget ($m)
$12.0
                                              $10.3                      YTD Actual ($m)
$10.0

 $8.0

 $6.0

 $4.0
                $1.4                   $2.0
                                                                              $1.3
 $2.0                                                                                              $0.7

 $0.0
                       Contributions




                                                      Subsidies




                                                                                     Contributed
                                                       Grants /




                                                                                       Assets
                          Cash




Capital Program
Actual capital expenditure (excluding commitments) is $29.5 million (YTD budget $43.4 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate quarterly report by the Asset Planning Manager.

Figure 5: Capital Program Delivery Performance
               $38.1
$40.0

$35.0                                                                    YTD Budget ($m)

$30.0                                                                    YTD Actual ($m)
                                   $26.1
$25.0

$20.0

$15.0

$10.0
                                              $4.0                $2.1
 $5.0
                                                                             $1.3              $1.3
 $0.0
                Capital works                  Other capital                Loan redemption




                                                                                                          Page 55 of 69

Section 56

GENERAL COMMITTEE MEETING AGENDA                                                    13 JUNE 2022


Cash Management and Investment Performance
Total cash on hand at the end of May was $92.3 million. Included in this balance are funds held in
trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants including
the financial assistance grant and other capital works grants, January rates payments received,
and unspent monies committed for funding capital projects which are underway and will continue
during the financial year.
The following pie charts present the mix of cash held at May 2022 by agency (graph on the left)
and by credit risk rating (graph on the right). All funds have been invested in accordance with the
Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating


                                                                      CBA
                                                                      4%
                  A1 +
             (Commercial Banks)
                   4%




                         A1 +
                        (QTC)                                               QTC
                         96%                                                96%




The following chart monitors the 12 month trend on total cash and the agencies invested. Payments
received in February from bi-annual rates generated a significant increase in cash, which have and
will be invested in short term QTC deposits in line with Council’s Investment Policy. Management
are actively monitoring short term investment rates being offered by commercial institutions against
QTC’s cash rate to ensure the return on investment is maximised.

Figure 7: 12 Month Trend of Cash Invested by Agency




                                                                                     Page 56 of 69

Section 57

GENERAL COMMITTEE MEETING AGENDA                                                                                   13 JUNE 2022


 120,000,000



 100,000,000



  80,000,000



  60,000,000



  40,000,000



  20,000,000



          -
              Jun-21   Jul-21   Aug-21   Sep-21   Oct-21   Nov-21   Dec-21   Jan-22    Feb-22   Mar-22   Apr-22    May-22


                Bendigo TD        Westpac TD        NAB TD          Suncorp TD        CBA TD        QTC           CBA Operating




Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.

 Category                                                                             Comments
 Operating Surplus Ratio                                                              • Intent: Identifies the extent to which
                                                                                        revenues        cover      operational
                                                                                        expenses, to ensure community
                                                                                        equity is not degraded
                                                                                      • Target: 0 – 10%
                                                                                      • Result: 13.4%
                                                                                      • Comment: This ratio will slowly
                                                                                        decline as expenditure on operations
                                                                                        occurs through to the end of the
                                                                                        financial year at 30 June 2022.




                                                                                                                   Page 57 of 69

Section 58

GENERAL COMMITTEE MEETING AGENDA                         13 JUNE 2022


Category                           Comments
Cash Expense Cover                 • Intent: Indicates how long council
                                     can continue paying its day-to-day
                                     expenses from cash at bank without
                                     needing additional cash flows
                                   • Target: > 3 months
                                   • Result: 12.4 months
                                   • Comment: Council is forecast to
                                     remain above target for the financial
                                     year. Business as usual expenditure
                                     through to 30 June 2022 will continue
                                     to diminish Council’s cash holdings,
                                     albeit not below the target range of 3
                                     – 6 months.

Asset Sustainability Ratio         • Intent: Measures the extent to which
                                     assets are being replaced as their
                                     condition degrades to ensure service
                                     potential is maintained
                                   • Target: 90% of depreciation budget
                                     spent on renewals annually
                                   • Result: Below budget
                                   • Comment: The capital works
                                     program has been impacted by flood
                                     and rain events and this together with
                                     ongoing supply chain issues has
                                     resulted in delays in the delivery of
                                     the capital program. This ratio will
                                     continue to increase each month as
                                     expenditure on renewals continues
                                     however it may fall short of the target
                                     as at 30 June 2022.

Net Financial Liabilities Ratio    • Intent: Outlines the level that net
                                     Council debt can be serviced by
                                     operating revenues. A ratio below
                                     zero implies that liabilities are less
                                     than cash (and other current assets)
                                     and there is adequate borrowing
                                     capacity available if needed.
                                   • Target: less than 60%
                                   • Result: -36%
                                   • Comment: Council has low debt
                                     levels and strong cash holdings.




                                                          Page 58 of 69

Section 59

GENERAL COMMITTEE MEETING AGENDA                                                       13 JUNE 2022


    Category                                                    Comments
    Investment Return                                           • Intent: Ensure appropriate return on
                                                                  investment yield for cash at bank.
                                                                • Target: 0.25% above current
                                                                  Bloomberg commonwealth 10-year
                                                                  bond rate yield (-0.12%)
                                                                • Result: 0.65%
                                                                • Comment: While long-term bond
                                                                  and interest rates remain low
                                                                  Council’s investment return still
                                                                  remains above target.
                                                                   As investment rates increase
                                                                   opportunities to maximise returns on
                                                                   surplus funds will be explored in line
                                                                   with Council’s investment policy.

    Rates in Arrears                                            • Intent: Ensuring that the amount of
                                                                  unpaid rates remains sustainable
                                                                  and does not negatively impact cash
                                                                  flows
                                                                • Target: 5% industry benchmark
                                                                • Result: 6.3%
                                                                • Comment: Rates arrears continue to
                                                                  decline from the high point in the
                                                                  cycle. Reminder notices have been
                                                                  issued and arrears will continue to
                                                                  stabilise through to June as they are
                                                                  collected,        and       payment
                                                                  arrangements implemented. Where
                                                                  appropriate recovery action will be
                                                                  taken.


Previous Council Consideration
Nil.

Finance
As above.


Risks & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks Council uses various tools which include
monthly ongoing financial reporting to identify and address emerging issues, conservative
budgeting, compliance with the Financial Sustainability Policy, regular budget reviews, effective
liquidity management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and
Restricted Cash policy which requires that Council maintains both a disaster management reserve
and a minimum 3 months cash cover to fund emergent matters.
Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
•       Substantial damage to or failure of Council infrastructure due to natural disaster or other
        emergent issue that may require significant unplanned investment;
•       Closure of Council facilities due to ongoing Covid 19 restrictions;


                                                                                       Page 59 of 69

Section 60

GENERAL COMMITTEE MEETING AGENDA                                                             13 JUNE 2022


•        A prolonged IT system failure affecting Council’s ability to deliver services or issue rates
         notices;
•        Economic conditions affecting ratepayers’ ability to pay rates;
•        Market driven increases in construction and operational costs significantly above estimates;
•        Labour and material shortages and delays.

Given the recent flooding event, assessments are currently underway to assess what impact this
may have on Council’s financial position and what disaster funding opportunities may available to
offset this expenditure.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

    X   Chief Executive Officer   X   Community Services                      X   Corporate Services
        Executive Support             Director                                X   Director
                                      Community Development                   X   Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

    X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
        Director                      Director                                    Director
        Community Engagement          Building & Plumbing Services                Asset Management
        Customer Service              Development Assessment                      Buildings and Facilities
        Governance                    Economic Development                        Civil Operations
        People and Culture            Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 60 of 69

Section 61

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022


                                   Attachment 1




                                   Page 61 of 69

GENERAL COMMITTEE MEETING AGENDA                                                                              13 JUNE 2022

                                                                                                               Attachment 1

      Profit and Loss Statement
      Revenue
         Recurrent Revenue
         Rates, levies and charges                           74,794          74.657         74,951            204        100%
         Fees and charges                                     8,246          7,460           8,214           754         100%
         Interest received                                      670           624              717             93        107%
         Sale of Goods and major services                     11,004         10.252          11,863          1,611       107%
         Sale of contract and recoverable works                 23                .              1               1       7%
        Rental & lease income                                  1,885          1,746           1,737           (10)       92%
         Other income                                          1,244           931            983             52         79%
         Grants, subsidies, contributions and donations       5,925          5.604           8,207           2,692       140%
         Unitywater Distributions                             5,650          3.882           3,882               -       60%
                                                            109,530         105,156        110,644          5,488       101%
      Expenses
         Recurrent Expenses
        Employee benefits                                    38,134         34,828          34,033           795         89%
         Materials and services                              51,001          42.345         42,577          (232)        83%
         Finance costs                                         114            1,024           1,042           (19)       04%
        Depreciation                                          19,689         17.957          17,967           (10)       92%
         Other expenses                                        233              188           234             (46)       100%
                                                             110,164        96,343         95,853            489         87%
     OperatingResult Bara sr
      Summary of Capital Expenditure and Funding
      Capital Funding
         Capital cash contributions and infrastructure charges 1,397          1,397           1,870           573        141%
        Contributed assets                                     1,500          1,328           688            (640)       46%
         Capital grants and subsidies                         18,963         10.295          12,393          2,099       65%
         Cash / revenue                                      22,860          31,686          16,256        (15,430)      71%
        New loan borrowings                                   4,859               -              -               -       o%
        Other capital revenue                                     -               -              -               -       o%
    Total Capital Funding                                     9ST             TOS              0B          1339)
      Capital Expenditure
         Contributed assets                                    1,500          1,328           688           (640)        46%
         Capital works - constructed assets                  42,440         38,084         26,138          (11,046)      62%
         Capital works - other capital                        4,342           3,997          2,053          (1,044)      47%
         Loan redemption                                       1,297          1,297           1,297              -       100%
         a1 Capital E rpenditure                                  -               -           1,131          1,131       O%

                                                                                                               Page 61 of 69

Section 62

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022


                                    Attachment 2




                                   Page 62 of 69

GENERAL COMMITTEE MEETING AGENDA                                                           13 JUNE 2022

                                                                                             Attachment 2

       Current Assets
            Cash and cash equivalents                             65,875            91,367             68,895
            Trade and other receivables                           10,286             7,709              7,467
            Inventories                                              144               150               144
           Contract Assets                                             -              487                487
            Other current assets                                   3,425             2,937              4.955
                                                                  79,730           102,651             81,948
            Non Current Assets held for sale                           -                  -                 -
      Total Current Assets                                        79,730           102,651             81,948
       Non Current Assets
            Trade and other receivables                           53,761            49 468             49,468
            Other non current Assets                                   -                  -                 +
            Investments                                          88,040             92,434             92,434
            Investment property                                    3,000             2,900              2,900
            Property, plant and equipment                       999,038           962,802             952.579
            Right of Use Assets                                      89                89                 89
            Intangible assets                                      2,925             2,654              3,036
      Total Non Current Assets                                 1,146,853          1,110,346         1,100,506
     TotalAssets                                              4,226,584          1,212,997         1,182,454
       Current Liabilities
            Trade and other payables                               7,334            12,091             10,468
            Contract Liabilities                                   4,377             4377               4,377
           Borrowings                                               946                128               955
            Lease Liablities                                         25                 25                25
           Provisions                                              8,103             5,226              4,947
            Other                                                  3,998             3,567              2,898
      Total Current Liabilities                                   24,783            25,414             23,669
       Non Current Liabilities
           Borrowings                                             24,390           20,258              20,258
            Lease Liabilities                                        66                66                 66
           Provisions                                             16,555            16,555             16,555
      Total Non Current Liabilities                               41,011            36,879             36,879
      TotalLiabilities| ©                                        85,794             62,293             0,549

       Community Equity
            Asset Revaluation Surplus                            126,129           108,561            108,473
            Retained Surplus / (Defeciency)                            -                  -                 -
            Shire Capital                                      1,034,661          1,013,432           999,512
            Current Year Net ity                                       -            0.704              7,905

                                                                                            Page 62 of 69

Section 63

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022


                                   Attachment 3




                                   Page 63 of 69

GENERAL COMMITTEE MEETING AGENDA                                                                    13 JUNE 2022

                                                                                                    Attachment 3

   Cash flows from operating activities
         Cash Flows from Operating Activities
         Receipts from Customers                                            04.649           103,851             93,975
         Payments to Suppliers and Employees                                (90.066)          (80,894)          (84.528)
                                                                             4,582           22,957               9.447
        investment and Interest Revenue Received                             3.270            2,231               3.401
         Rental income                                                       1,873             1,737              1,365
         Non Capital Grants and Contributions                                5,887             8,297              6,085
        Income Tax Equivalent Received                                       1,200             1,521              1,450
        Income from Equity Investments                                       1,850              847               1,600
         Payments:
         Borrowing Costs                                                         -                 -             (2,499)
         Interest Expense                                                     (516)             (144)              (131)

   Cash Flows from Investing Activities

        Proceeds of Sale of Property, Plant and Equipment                        -               158               217
         Grants, Subsidies, Contributions and Donations                    20,360             14,363             13,679
         Payments:
         Payments of Property, Plant and Equipment                          (45.953)         (27,841)           (22,721)
         Payments for Intangible Assets                                       (829)             (480)            (1,385)
        Net Movement in Loans and Advances                                       -               125               125

   Cash Flows from Financing Activities

        Proceeds from Borrowings                                             4.859                 -              2,500
         Payments:
         Repayment of Borrowings                                              (736)            (1,299)           (1,263)

        Net Increase/(Decrease) in Cash and Cash Equivalentsheld =          (4.153)         2.47214, 871
         Cash and Cash Equivalents at the beginning of the reporting period 70,028           68,804              57,023

                                                                                                    Page 63 of 69

Section 64

GENERAL COMMITTEE MEETING AGENDA   13 JUNE 2022


                                   Attachment 4




                                   Page 64 of 69

GENERAL COMMITTEE MEETING AGENDA                                                                           13 JUNE 2022

                                                                                                           Attachment 4

      Materials and services
      Advertising and Marketing                             227              195            188               7       83%
      Administration Supplies and Consumables                751                           585              55        78%
      Audit Expenditure                                      174             63              12              51        7%
      Communications and IT                                 654             e74             841           (166)       123%
      Commission Paid                                       1,218          1,114           1,332          (219)       108%
     Consultancy Services                                   1,278           962            1,180          (218)       a2%
     Contract Services                                    24,287         20,435          20,398             36        84%
      Contributions, Donations, Sponsorship and Prizes      3,471          3,393           3,480           (87)       100%
      Electricity                                           1,728          1,561           1,498            63        87%
     Internal Fleet Costs and External Plant Hire           1,668          1,462           1,710          (249)       103%
     Grants Paid to Community Organisations                 1,939          1,235           1,261           (26)       65%
     insurance                                              703             700            673              26        96%
      Legal Expenses                                        1,866          1,281           1,405          (124)       75%
      Operating Leases and Rentals                            2             301            326             (24)       108%
     Software and Maintenance                              2,166           1,891           1,813           (22)       88%
      Subscriptions and Registrations                        368            306            337             (31)       o1%
      Waste Levy Payments                                   1,460          1,338           1,487          (149)       102%
      Water and Sewerage Charges                            1,080          1,023           851              172       78%
      All Other Materials and Services                      5,708          3,773           3,098           675        54%
                                                           31,091        42,345         42,577            (232)       83%

                                                                                                           Page 64 of 69

Section 65

GENERAL COMMITTEE MEETING AGENDA                                                      13 JUNE 2022



7.    CLOSED SESSION


5     INCOMING CEO REPORT


Author            Chief Executive Officer, Scott Waters
                  CEO’s Office

Index             ECM/CEO Governance 27.41

Attachments       1.    Incoming CEO Report
                  2.    Noosa Shire Council Community Satisfaction Survey 2021
                  3.    Community Service Department Overview CEO Onboarding
                  4.    QAO Asset Maturity Assessment
                  5.    Capital Program Delivery Status March 2022
                  6.    Noosa Administration Building Report April 2022
                  7.    Employee Engagement Survey 2021
                  8.    Level of Service Catalogue 2020-21
                  9.    People and Culture Report MAR QTR 22
                  10.   Noosa Council People and Culture Strategy 2017 – 2020
                  11.   Noosa Council Functional Structure
                  12.   PlaceScore Liveability Survey 2021
                  13.   Corporate Plan 2017 – 2037
                  14.   Customer Service Charter
                  (All attachments are provided separately to this Agenda)



REASON FOR CLOSED SESSION

This report was considered in closed session in accordance with Section 254J (3) of the Local Government
Regulation 2012, which permits the meeting to be closed to the public for business relating to the
following:
(b)   industrial matters affecting employees;
(f)   matters that may directly affect the health and safety of an individual or group of individuals;
(g)   negotiations relating to a commercial matter involving the local government for which a public
      discussion would be likely to prejudice the interests of the local government;




                                                                                      Page 65 of 69

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.